Loading...
ST9301-LR051128 8908 Ambassador Row, Dallas, TX 75247 2 696 Gravel Drive, Fort Worth, TX 76118 — � 7701 W Little York, Ste 600, Houston, TX 77040 4 a Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 245298 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Coppell TX 75019 Date of Service: 11/12/2005 Report Date: 11/28/2005 Project: East Sandy Lake Road fi. ST 93 -01 triv V 7i Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Test Methods: ASTM D -2922 Gauge: Troxler 3430 Moisture Density ASTM D -3017 Gauge Serial No: 24675 Current: 604 Current: 2751 Test Mode: DT Previous: 600 Previous: 2771 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Reddish Brown Sandy Silty Clay 12.5 116.5 Optimum +4 95 min 2 Reddish Brown Clayey Sand w /trace sandstone 14.0 113.0 Optimum +4 95 min 3 Lime Treated Reddish & Medium Brown Sandy 16.0 108.0 Optimum +4 95 min Clay w/ Limestone FIELD DENSITY TESTS TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pcf) (pcf) (% max) Backfill 1 Retaining wall, east side of box culvert, 6" 1 12.7 128.7 114.2 98 Station 43 +25, elevation 427, 1st lift Backfill 2 Retaining wall, east side of box culvert, 6" 1 13.7 126.3 111.1 95 Station 43 +30, elevation 428, 2nd Lift Backfill 3 Retaining wall, east side of box culvert, 6" 3 .16.0 124.8 107.6 100 Station 43 +20, elevation 429, 3rd lift Backfill LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd 07TM Page 1 of 2 aeport No.: 245298 k re ject No.: 059909 Client: City of Coppell TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pci) (pci) (% max) 4 Retaining wall, east side of box culvert, 6" 1 13.1 126.9 112.2 96 Station 43 +22, elevation 430, 4th lift Backfill 5 Retaining wall, east side of box culvert, 6" 1 13.9 126.5 111.1 95 Station 43 +29, elevation 431, 5th lift Backfill 6 Retaining wall, east side of box culvert, 6" 1 13.6 126.5 111.4 96 Station 43 +20, elevation 432, 6th lift Backfill 7 Retaining wall, east side of box culvert, 6" 3 16.0 124.3 107.2 99 Station 43 +19, elevation 433, 7th lift Test results on this report meet project specification. 4( Technician: Dan Rogers Started: 11:30a Finished: 3:45pm 3.. Report Distribution: ' �`,� -I (1) City of Coppell L (1) City of Coppell K. Scott Watson, AET (1) Tiseo Paving CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 07TM Page 2 of 2 ,-,one Engineering 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630 -9745 REPORT OF IN -PLACE DENSITY CANCELLATION Client: City of Coppell Report No.: 245299 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Date of Service: 11/12/2005 Coppell TX 75019 Report Date: 11/28/2005 Project: East Sandy Lake Road (A 5zet ST 93 -01 ?j Services: In -Place Density Cancellation Report of Cancellation On this date a Rone Engineering Services, Ltd. representative arrived on site as scheduled. Upon arrival, our representative was informed that testing /inspection was cancelled for the day. Technician Time: 8:30am - 10:00am Rone Engineering Technician: Dan Rogers Report Distribution: , ) City of Coppell ` (1) City of Coppell �.;. K. Scott Wat on, AET (1) Tiseo Paving CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 19 TH Pate 1 of 1 8908 Ambassador Row, Dallas, TX 75247 ring 2696 Gravel Drive, Fort Worth, TX 76118 7701 W Little York, Ste 600, Houston, TX 77040 `n; 4 r ': Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 245344 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Coppell TX 75019 Date of Service: 11/14/2005 Report Date: 11/28/2005 Project: East Sandy Lake Road ST 93 O1 At tr)C75tOg Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Test Methods: ASTM D -2922 Gauge: Troxler 3430 Moisture Density ASTM D -3017 Gauge Serial No: 35519 Current: 683 Current: 2507 Test Mode: DT Previous: 686 Previous: 2555 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Reddish Brown Clayey Sand w /trace sandstone 14.0 113.0 Optimum +4 95 min FIELD DENSITY TESTS TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pcf) (pcf) (% max) Retaining wall 1 3' west of box culvert, 9' below grade 6" 1 14.0 123.8 108.6 96 Retaining wall 2 7' west of box culvert, 9' below grade 6" 1 15.6 124.8 108.0 96 Retaining wall 3 4' west of box culvert, 8' below grade 6" 1 17.0 129.5 110.7 98 Retaining wall 4 8' west of box culvert, 8' below grade 6" 1 17.5 129.7 110.4 98 Retaining wall 5 2' west of box culvert, 7' below grade 6" 1 17.3 129.1 110.1 97 Retaining wall 6 9' west of box culvert, 7' below grade 6" 1 16.6 129.5 111.1 98 Retaining wall 7 4' west of box culvert, 6' below grade 6" 1 16.9 126.8 108.5 96 Retaining wall LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition. appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 07TM Page 1 of 2 Deport No.: 2453 Project No.: 059909 Client: City of Coppell TEST PROBE MID MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. (%) (pcf) (pci) (% max) 8 8' west of box culvert, 6' below grade 6" 1 17.1 127.2 108.6 96 Retaining wall 9 2' west of box culvert, 5' below grade 6" 1 16.9 126.4 108.1 96 Retaining wall 10 9' west of box culvert, 5' below grade 6" 1 17.5 126.3 107.5 95 Retaining wall 11 8' west of box culvert, 4' below grade 6" 1 16.8 125.4 107.4 95 Retaining wall 12 10' west of box culvert, 4' below grade 6" 1 14.7 124.5 108.5 96 Retaining wall 13 3' west of box culvert, 3' below grade 6" 1 16.5 132.1 113.4 100 Retaining wall 14 7' west of box culvert, 3' below grade 6" 1 16.2 130.8 112.6 100 Test results on this report meet project specification. ■ Technician: Julio Perez Started: 8 :15am Finished: 4:15pm •if Wi ire/ Report Distribution: taw i fr'/ (1) City of Coppell I� ��.P (1) City of Coppell . Scott Watson, AET (1) Tiseo Paving CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 07TM Page 2 of 2 . Engineering 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 � Corporate Phone: (214) 630-9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 245427 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Coppell TX 75019 Date of Service: 11/15/2005 Report Date: 11/28/2005 Project: East Sandy Lake Road ii4V it ST 93 -01 2)7)Cj?°8 Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Gauge: Troxler 3430 Test Methods: Moisture Density ASTM D -2922 Y ASTM D -3017 Gauge Serial No: 36438 Current: 724 Current: 2739 Test Mode: DT Previous: 711 Previous: 2718 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Reddish Brown Clayey Sand w /trace sandstone 14.0 113.0 Optimum +4 95 min 2 Reddish Brown Sandy Silty Clay 12.5 116.5 Optimum +4 95 min FIELD DENSITY TESTS TEST PROBE MID MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pcf) (pcf) (% max) Backfill 1 Retaining wall, Station 42 +40, 8' below 6" 2 14.0 129.9 113.9 98 elevation 435.16 Backfill 2 Retaining wall, Station 42 +35, 8' below 6" 1 16.8 128.1 109.7 97 elevation 435.16 Backfill 3 Retaining wall, Station 42 +45, 7' below 6" 2 13.9 129.1 113.3 97 elevation 435.16 Backfill 4 Retaining wall, Station 42 +42, 7' below 6" 2 13.0 129.3 114.4 98 elevation 435.16 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 07TM Page 1 of 2 Report No.: 245427 Project No.: 059909 Client: City of Coppell TEST PROBE MUD MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pct) (pct) (% max) Backfill 5 Retaining wall, Station 42 +47, 6' below 6" 1 15.1 129.0 112.1 99 elevation 435.16 Backfill 6 Retaining wall, Station 42 +50, 6' below 6" 2 14.1 132.5 116.1 100 elevation 435.16 Backfill 7 Retaining wall, Station 42 +56, 5' below 6" 2 15.8 131.2 113.3 97 elevation 435.16 Backfill 8 Retaining wall, Station 42 +32, 5' below 6" 1 16.2 130.0 111.9 99 elevation 435.16 Backfill 9 Retaining wall, Station 42 +65, 4' below 6" 1 15.4 127.1 110.1 97 elevation 435.16 Backfill 10 Retaining wall, Station 42 +70, 4' below 6" 2 13.9 127.5 111.9 96 elevation 435.16 Backfill 11 Retaining wall, Station 42 +58, 3' below 6" 2 14.5 131.5 114.8 99 elevation 435.16 Backfill 12 Retaining wall, Station 42 +63, 3' below 6" 1 15.1 129.7 112.7 100 elevation 435.16 Backfill 13 Retaining wall, Station 42 +75, 2' below 6" 2 14.3 131.3 114.9 99 elevation 435.16 Backfill 14 Retaining wall, Station 42 +68, 2' below 6" 2 13.5 130.4 114.9 99 elevation 435.16 Backfill 15 Retaining wall, Station 42 +55, l' below 6" 2 13.9 128.1 112.5 97 elevation 435.16 Backfill 16 Retaining wall, Station 42 +60, l' below 6" 2 13.6 128.5 113.1 97 elevation 435.16 Backfill 17 Retaining wall, Station 42 +78 at elevation 6" 1 14.6 129.2 112.7 100 435.16 Backfill 18 Retaining wall, Station 42 +72 at elevation 6" 1 15.8 127.7 110.3 98 435.16 Test results on this report meet project specification. i e � Technician: Ben Weaverling Started: 11:15a F inished: 3 :45 In / Report Distribution: g p A Pr (1) City of Coppell 4 (I) City of Coppell K. Scott Watson, AET (I) Tiseo Paving CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 07TM Page 2 of 2 one Engineering 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 761I8 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630 -9745 MOISTURE DENSITY RELATIONS Client: City of Coppell Report No.: 245668 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Coppell TX 75019 Date of Service: 11/17/2005 Report Date: 11/28/2005 Project: East Sandy Lake Road • 51A8 ST 93 -01 �i�-"' Services: Obtain a sample of material from the jobsite, bring the sample back to the laboratory and perform a moisture density relationship test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company DATE SAMPLED: 11/17/2005 TEST FOR: Wall Backfill MATERIAL PREPARATION: Moist MATERIAL: Reddish Brown Silty Sand w/ RAMMER TYPE: Mechanical Sandstone & Gravel SAMPLED BY: Contractors CLASSIFICATION: Wall Backfill SAMPLE LOCATION: Sample supplied by Contractor TEST METHOD: ASTM D -698 ASTM D -4318 Method A REPORT OF TEST MAXIMUM DRY DENSITY, pcf: 98.0 MOISTURE DENSITY RELATIONS 104 Zero c aic voids cave OPTIMUM MOISTURE CONTENT, %: 1 Sp 1.0 Specific Gravit} 0 REQUIREMENTS LIQUID LIMIT: 102 Dry PLASTIC LIMIT: Density (pcf) PLASTICITY INDEX: Non - plastic 100 % PASSING #200: 1.6 Maximum 15.0 98 Test results on this report meet project 96 specifications as noted above. 7 9 11 13 15 17 19 MOISTURE CONTENT ( %) pH = 5.88 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 06 Page 1 of 2