Loading...
ST9301-LR051201 ®® o ■ 8908 Ambassador Row, Dallas, TX 75247 1 �r Engineering 2696 Gravel Drive, Fort Worth, TX 76118 7701 W Little York, Ste 600, Houston, TX 77040 ., Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 245931 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Coppell TX 75019 Date of Service: 11/22/2005 Report Date: 12/01/2005 Project: East Sandy Lake Road k d Z � ST 93 -01 1' � ' �! , J` ? ' p Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Gauge: Troxler 3430 Test Methods: Moisture Density ASTM D -2922 tY ASTM D -3017 Gauge Serial No: 35519 Current: 688 Current: 2568 Test Mode: DT Previous: 690 Previous: 2594 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Reddish Brown Clayey Sand w /trace sandstone 14.0 113.0 Optimum +4 95 min 2 Reddish Brown Clayey Sand w /trace sandstone 14.0 113.0 Optimum +4 98 min 1 1 ■ TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pcf) (pcf) (% max) Roadway 1 Sandy Lake Road, Station 43 +50, elevation 6" 1 14.6 126.7 110.6 98 441, 43' lift Roadway 2 Sandy Lake Road, Station 43 +30, elevation 6" 1 17.4 126.9 108.1 96 442, 43' lift Roadway 3 Sandy Lake Road, Station 43 +50, elevation 6" 1 15.6 125.2 108.3 96 443, 43' lift Roadway 4 Sandy Lake Road, Station 43 +20, elevation 6" 1 14.0 123.9 108.7 96 442, 43' lift LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd 07TM Page 1 of 2 Report No.: 245931 Project No.: 059909 Client: City of Coppell TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pci) (pci) (% max) Roadway 5 48" pipe removed at Station 42 +00, 6" 1 15.7 124.7 107.8 95 elevation 442 Roadway 6 Retaining wall on eastbound Sandy Lake 6" 2 14.1 128.9 113.0 100 Road, Station 28_65, elevation 46 Roadway 7 Retaining wall on eastbound Sandy Lake 6" 2 16.3 128.4 110.4 98 Road, Station 29 +40, elevation 46.5 Test results on this report meet project specification. or i ' r i . i Technician: Julio Perez Started: 7:30am Finished: 5:45pm .... 1- ` 1 Report Distribution: �i"�� (1) City of Coppell 4� /' ir (1) City of Coppell K. Scott Watson, AET (1) Tiseo Paving CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 37TM Page 2 of 2 tne Engineering o Ambassador Row, Dallas, TX 75247 2 696 Gravel Drive, Fort Worth, TX 76118 ,� -1' 1 7701 W Little York, Ste 600, Houston, TX 77040 7 Corporate Phone: (214) 630 -9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Report No.: 244328 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Coppell TX 75019 Date of Service: 10/28/2005 Report Date: 12/01/2005 Project: East Sandy Lake Road ST 93 -01 09b4 1 Services: Test Compressive Strength Samples made by others and picked up at the jobsite. PROJECT DATA CONTRACTOR: Tiseo Paving Company MIX DESIGN I.D.: 9616 -B MEASURED SLUMP CONCRETE SUPPLIER: Southern Star PLACEMENT DATE: 10/27/2005 (inches) PLANT: 22 WEATHER CONDITIONS: NA NA SPECIFICATION REQUIREMENTS TIME SAMPLED: NA BATCH TIME: 1:42pm STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR NA F CONCRETE: NA F SLUMP (in): NA TRUCK NO: 114 TICKET NO: 842573 AIR ( %): NA AIR CONTENT ( %): NA UNIT WEIGHT (pcf): NA TEST METHOD: ASTM C -172 OVERALL PLACEMENT LOCATION: ASTM C -31 except 9.1 2 Inlet top, Stations 39±6832 and _58 +30 . ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -1231 SAMPLE LOCATION: Same as above ASTM C -39 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE 1 1 11/03/2005 7 6.00 28.26 98010 3470 Unbonded Cap 1 2 11/24/2005 28 6.00 28.26 122940 4350 Unbonded Cap 1 3 11/24/2005 28 6.00 28.26 120020 4240 Unbonded Cap Average 4300 1 4 Hold All information other than test results was provided by the contractor and assumed to be correct. 1\ :4 ' 0 4 le LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. r? SS Page 1 of 2 ",; 8908 Ambassador Row, DaI1as, TX 75247 2 696 Gravel Drive, Fort Worth, TX 76138 7701 W Little York, Ste 600, Houston, TX 77040 . °z:; s ` ,' ... a' , Corporate Phone: (214) 630 -9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Report No.: 244306 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Coppell TX 75019 Date of Service: 10/28/2005 Report Date: 12/01/2005 • Project: East Sandy Lake Road A°I ST 93-01 \t t. Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company MIX DESIGN I.D.: 9616 -B MEASURED SLUMP CONCRETE SUPPLIER: Southern Star PLACEMENT DATE: 10/28/2005 (inches) PLANT: 27 WEATHER CONDITIONS: Clear 3.75 SPECIFICATION REQUIREMENTS TIME SAMPLED: 2:15pm , BATCH TIME: NA STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 75 F CONCRETE: 69 F SLUMP (in): 3 n - 5 tt TRUCK NO: 8822 TICKET NO: 1013188 AIR ( %): 4% - 6% AIR CONTENT ( %): 4.7 UNIT WEIGHT (pcf): NA TEST METHOD: ASTM C -172 OVERALL PLACEMENT LOCATION: ASTM C -31 except 9.12 Inlet top /curb at Station 0 +74 ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -1231 SAMPLE LOCATION: Same as above ASTM C -39 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE 1 1 11/04/2005 7 6.00 28.26 123540 4370 Unbonded Cap 1 2 11/25/2005 28 6.00 28.26 143720 5080 Unbonded Cap 1 3 11/25/2005 28 6.00 28.26 145630 5150 Unbonded Cap Average 5120 1 4 Hold Water added at site: 5 gallons Technician: Jeremy Watts Started: 12:30pm Finished: 3:OOpm � If, gO u g Report Distribution: , ��' ` (1) City of Coppell (1) City of Coppell K. Scott Watson, AET (1) Tiseo Paving CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. OiSS Page 1 of 1 Engineering '' 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 i a �, k , '' 7701 W Little York, Ste 600, Houston, TX 77040 _ � :' 1 < L ' . ", Corporate Phone: (214) 630 -9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Report No.: 244126 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Date of Service: 10/26/2005 Coppell TX 75019 Report Date: 12/01/2005 Project: East Sandy Lake Road 1 7 ST 93 -01 \ t Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company MIX DESIGN LD.: 1703 MEASURED SLUMP CONCRETE SUPPLIER: LMC PLACEMENT DATE: 10/26/2005 (inches) PLANT: 7 WEATHER CONDITIONS: Clear 4.5 SPECIFICATION REQUIREMENTS TIME SAMPLED: 3 :15pm BATCH TIME: NA STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 65 F CONCRETE: 76 F SLUMP (in): 3" - 5" TRUCK NO: 1045 TICKET NO: 7157757 AIR ( %): 3% - 6% AIR CONTENT ( %): 5.8 UNIT WEIGHT (pct): NA TEST METHOD: ASTM C -172 OVERALL PLACEMENT LOCATION: ASTM C -31 except 9.1.2 Box culvert cast in place retaining wall #2, Station 43 +75 ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C - 1231 SAMPLE LOCATION: 10' southwest of northeast corner ASTM C - 39 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi TYPE 1 1 11/02/2005 7 6.00 28.26 83380 2950 Unbonded Cap 1 2 11/23/2005 28 6.00 28.26 108800 3850 Unbonded Cap 1 3 11/23/2005 28 6.00 28.26 112810 3990 Unbonded Cap Average 3920 1 4 Hold Technician: Dane Campbell Started: 2 :45 m Finished: 4:45 m ¶k4 : g p P p Off ` Re ort Distribution: f // P (1) City of Coppell r A _ ( 1) City of Coppell K. Scott Watson, AET (1) Tiseo Paving CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. °ISS Page 1 of 1 •` ne Engineering 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 j 7701 W Little York, Ste 600, Houston, TX 77040 ;,,,�"� � � - � , � xf -...9 Fn , ,74,,I,,,, , : ' F �% Corporate Phone: (214) 630 -9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Report No.: 244125 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Coppell TX 75019 Date of Service: 10/26/2005 k x Report Date: 12/01/2005 Project: East Sandy Lake Road Q c-? ST 93-01 4, 0 NC) Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company MIX DESIGN ID.: 9616 -B MEASURED SLUMP CONCRETE SUPPLIER: Southern Star PLACEMENT DATE: 10/26/2005 (inches) PLANT: 27 WEATHER CONDITIONS: Clear 3.5 SPECIFICATION REQUIREMENTS TIME SAMPLED: 2:15pm BATCH TIME: NA STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 64 F CONCRETE: 78 F SLUMP (in): 3. - 5" TRUCK NO: 922 TICKET NO: 1013162 AIR ( %): 3% - 6% AIR CONTENT ( %): 4.0 UNIT WEIGHT (pcf): NA TEST METHOD: ASTM C -172 OVERALL PLACEMENT LOCATION: ASTM C -31 except 9 1 .2 Inlet top and threshold I -5, Station 51 +70, 38.25 left ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -1231 SAMPLE LOCATION: Inlet I -5 top ASTM C -39 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE 1 1 11/02/2005 7 6.00 28.26 128580 4550 Unbonded Cap 1 2 11/23/2005 28 6.00 28.26 155170 5490 Unbonded Cap 1 3 11/23/2005 28 6.00 28.26 154380 5460 Unbonded Cap Average 5480 1 4 Hold Aft. � . Technician: Dane Campbell Started: 1:OOpm Finished: 2:45pm � ; � _ Report Distribution: �� ' (1) City of Coppell �lv•'" (1) City of Coppell K. Scott Watson, AET (1) Tiseo Paving CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 01SS Page 1 of 1 R '� ` �`[ 8908 Ambassador Row, Dallas, TX 75247 one [ 2696 Gravel Drive, Fort Worth, TX 76118 7701 W Little York, Corporate Phone: (214) 630-9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Report No.: 244036 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Date of Service: 10/25/2005 Coppell TX 75019 Report Date: 12/01/2005 Project: East Sandy Lake Road AC61‘ IA ST 93-01 kli SIP Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company MIX DESIGN I.D.: 9616 -B MEASURED SLUMP CONCRETE SUPPLIER: Southern STar PLACEMENT DATE: 10/25/2005 (inches) PLANT: 27 WEATHER CONDITIONS: Clear 4.5 SPECIFICATION REQUIREMENTS TIME SAMPLED: 2:15am BATCH TIME: 1:3Oam STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 70 F CONCRETE: 80 F SLUMP (in): NA TRUCK NO: 648 TICKET NO: 1013105 AIR ( %): NA AIR CONTENT ( %): 3.9 UNIT WEIGHT (pcf): NA TEST METHOD: ASTM C -172 OVERALL PLACEMENT LOCATION: ASTM C -31 Inlet I -10 and I -5A, Sandy Lake Road, Stations 49 +97 and 38 +25, left except 9.1.2 ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -1231 SAMPLE LOCATION: Station 49 +97 ASTM C -39 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (Ibs. force) (psi) TYPE 1 1 11/01/2005 7 6.00 28.26 89540 3170 Unbonded Cap 1 2 11/22/2005 28 6.00 28.26 123560 4370 Unbonded Cap 1 3 11/22/2005 28 6.00 28.26 124800 4410 Unbonded Cap Average 4390 1 4 Hold , Technician: Joe Espinoza Started: 1:30pm Finished: 3:15pm ' ! . ' / leigal Report Distribution: � � WAN, ( 1 ) City of Coppell L f - (1) City of Coppell K. Scott Watson, AET (1) Tiseo Paving CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. OISS Page 1 of 1