Loading...
ST8805-CS 890315'4P Jerry Parch Consulting Engineers March 14, 1989 Mr. Joe Phelps James B. Arnold Construction Inc. P O Box 153045 Irving, Texas 75061 214/263-4097 RE: JP No. 88023; Site Grading; Parkway Boulevard and High School Access Road; Parks of Coppell; Coppell, Texas Dear Joe: ~.o~_~ /,~//~ Quantities listed in the referenced contract are ba ~ ..,~ ,}~ sub~rade levels inproposed street areas as follows'. Parkways_ .~'~,~,' ' Bouievard - 14 inches below tod of curb grade; High School ~ . Access Road - 13 inches below top of curb grade. Top of curb <~" grade is shown on sheet numbers 3 and 4 of the plans. Pavement cross sections are shown on sheet number 6 of the plans. The paving and utility contractor has indicated that he will use six inch concrete pavement in both streets in accordance with City of Coppell requirements. Therefore, please adjust street subgrade levels to one foot below top of curb grade. Contract Adjustments: Item No. 2 Excavation: Additional Quantity 336 c.y. Additional Amount $336.00 Total amount of Contract Adjustment Total amount of Contract as Adjusted + $336.00 $18,122.00 320 Vv'estway Place, Suite 501 · Arlington, Texas 76018 · Metro {817) 467-2418 · 18171 465-0259 Hr. Joe Phelps JP No. 88023 March 14, 1989 Page 2 of 2 Revised copies of the questions, please call. Sincerely~ ,. JP:ch plans will follow. If you have any cc: Mr. Jay Chester, P.E./ABQ Development Corporation r. David stanfield/Coppell Independent School DistriCt r Russell Doyle, P.E./City of Coppell Mr. Steve Morton/City of Coppell Mr. Jack Crawford/Brittain & Crawford