Loading...
ST9301-LR050926 REPORT OF LIME PULVERIZATION utn Client: City of Coppell Report No.: 242105 Project No.: 059909 Date of Service 9/26/2005 Project: East Sandy Lake Road Page 2 of 2 Specifications: 100% passing 1 1/2" sieve 60% passing #4" sieve A B C D E Sample Weight Percent Weight Percent Weight Retained Passing Retained Passing 1 1/2" Sieve 1 1/2" Sieve #4 Sieve #4 Sieve Location Sandy Lake Road, westbound lane, Station 66 +00, 1 15' north of centerline 10.0 0 100 3.5 65 Sandy Lake Road, westbound lane, Station 63 +00, 2 12' north of centerline 10.0 0 100 2.0 80 Sandy Lake Road, westbound lane, Station 60 +00, 3 17' north of centerline 10.0 0 100 3.0 70 Sandy Lake Road, westbound lane, Station 57 +00, 4 20' north of centerline 10.0 0 100 2.5 75 Sandy Lake Road, westbound lane, Station 54 +00, 5 22' north of centerline 10.0 0 100 3.0 70 Sandy Lake Road, westbound lane, Station 52 +50, 6 23' north of centerline 10.0 0 100 3.1 69 7 8 9 10 11 12 13 Additional Comments: LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed.