ST9301-LR050926 REPORT OF
LIME PULVERIZATION utn
Client: City of Coppell Report No.: 242105
Project No.: 059909
Date of Service 9/26/2005
Project: East Sandy Lake Road Page 2 of 2
Specifications:
100% passing 1 1/2" sieve
60% passing #4" sieve
A B C D E
Sample Weight Percent Weight Percent
Weight Retained Passing Retained Passing
1 1/2" Sieve 1 1/2" Sieve #4 Sieve #4 Sieve
Location
Sandy Lake Road, westbound lane, Station 66 +00,
1 15' north of centerline 10.0 0 100 3.5 65
Sandy Lake Road, westbound lane, Station 63 +00,
2 12' north of centerline 10.0 0 100 2.0 80
Sandy Lake Road, westbound lane, Station 60 +00,
3 17' north of centerline 10.0 0 100 3.0 70
Sandy Lake Road, westbound lane, Station 57 +00,
4 20' north of centerline 10.0 0 100 2.5 75
Sandy Lake Road, westbound lane, Station 54 +00,
5 22' north of centerline 10.0 0 100 3.0 70
Sandy Lake Road, westbound lane, Station 52 +50,
6 23' north of centerline 10.0 0 100 3.1 69
7
8
9
10
11
12
13
Additional Comments:
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no
responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by
persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed.