Loading...
ST9301-LR050927 REPORT OF 5 LIME PULVERIZATION �� Client: City of Coppell Report No.: 242170 Project No.: 059909 Date of Service 9/27/2005 Project: East Sandy Lake Road Page 2 of 2 Specifications: 100% passing 1 3/4" sieve 60% passing #4" sieve A B C D E Sample Weight Percent Weight Percent Weight Retained Passing Retained Passing 1 3/4" Sieve 1 3/4" Sieve #4 Sieve #4 Sieve Location 1 Sandy Lake Road, Station 49 +50 12.0 0 100 4.0 66.6 2 Sandy Lake Road, Station 46 +50 13.0 0 100 4.5 65.3 3 Sandy Lake Road, Station 42 +00 12.0 0 100 3.5 70.8 4 Sandy Lake Road, Station 39 +00 13.5 0 100 4.0 70.3 5 6 7 8 9 10 11 12 13 Additional Comments: LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. R one Engineering 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 241932 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Date of Service: 09/22/2005 Coppell TX 75019 Report Date: 09/27/2005 Project: East Sandy Lake Road ' I A7 Q9- ST 93-01 I' 2 Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Test Methods: Gauge: Troxler 3430 ASTM D -2922 Moisture Density ASTM D -3017 Gauge Serial No: 35518 Current: 734 Current: 2786 Test Mode: DT Previous: 742 Previous: 2758 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Light Brown Sandy Clay w/ Limestone Fragments 11.0 122.5 Optimum +4 95 min FIELD DENSITY TESTS TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pcf) (pcf) (% max) Fill 1 Sandy Lake Road, westbound lane, 6" 1 11.5 131.7 118.1 96 elevation 449 +25, Station 29 +30, 40' long final Fill 2 Sandy Lake Road, westbound, elevation 6" 1 11.8 132.5 118.5 97 449 +25, Station 27 +00, final Fill 3 Sandy Lake Road, westbound, elevation 6" 1 11.8 132.7 118.7 97 44 +40, 20' long, final Test results on this report meet project specification. i Technician: Joe Jernigan Started: 1:45pm Finished: 3:30pm ��� �^ s Report Distribution: p '� /� '���� (1) City of f (1) City of Coppell K. Scott Watson, AET (1) Tiseo Paving CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 07SS Page 1 of 1 Engineering 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 241891 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Date of Service: 09/22/2005 Coppell TX 75019 Report Date: 09/27/2005 Project: East Sandy Lake Road 20 A O� ST 93 -01 I IV k' Z Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Test Methods: Gauge: Troxler 3430 ASTM D -2922 Moisture Density ASTM D -3017 Gauge Serial No: 35518 Current: 734 Current: 2786 Test Mode: DT Previous: 742 Previous: 2758 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Light Brown Sandy Clay w/ Limestone Fragments 11.0 122.5 Optimum +4 95 min FIELD DENSITY TESTS TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pcf) (pct) (% max) Fill 1 Sandy Lake Road, westbound lane, 6" 1 11.8 132.7 118.7 97 elevation 445 +50, Station 45 +50, 18' left, 1' below grade Fill 2 Sandy Lake Road, westbound lane, 6" 1 12.5 136.8 121.6 99 elevation 444 +50, Station 41 +00, 25' left, 1' below grade Fill 3 Sandy Lake Road, westbound lane, 6" 1 11.1 131.0 117.9 96 elevation 445 +50, Station 41 +00, 25' left, grade Test results on this report meet project specification. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd 07SS Page 1 of 2 Technician: Joe Jernigan Started: $ ;OOam Finished: 10:00a o:• n Report Distribution: � (1 City of Coppell (1) (1) City of Coppell K. Sc Watson, AET (1) Tiseo Paving CMT Operations Manager R one Engineering 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Corporate Phone: s(214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 241845 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Date of Service: 09/21/2005 Coppell TX 75019 Report Date: 09/27/2005 Project: East Sandy Lake Road `, , ik" ST 93 -01 4 --2.2,0 41 o 0 Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Test Methods: Gauge: Troxler 3430 ASTM D -2922 Moisture Density ASTM D -3017 Gauge Serial No: 35518 Current: 746 Current: 2758 Test Mode: DT Previous: 742 Previous: 2762 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Light Brown Sandy Clay w/ Limestone Fragments 11.0 122.5 Optimum +4 95 min FIELD DENSITY TESTS TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pcf) (pct) (% max) Fill 1 Westbound lane, Sandy Lake Road, Station 6" 1 11M 135.4 122.0 100 45 +00, centerline, grade Test results on this report meet project specification. , an Start �t ' i_L Technician: Joe Jerni g 1:45pm Finished: 3:0 0pm /1 / , � i ' �'��� Report Distribution: (1) City of Coppell ,�` /, (1) City of Coppell K. o tt Watson, AET (1) Tiseo Paving CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 07TM Page 1 of 1