Loading...
ST9301-LR050929 Rone E n g i n a e r i n g 8908 Ambassador Row, Dallas, TX 75247 V y 1 I 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630 -9745 MOISTURE DENSITY RELATIONS Client: City of Coppell Report No.: 242109 Ms. Suzan Taylor PO Box 9478 Project No.: 059909 Coppell TX 75019 Date of Service: 09/26/2005 Report Date: 09/29/2005 Project: East Sandy Lake Road �( t ST 93 -01 tit Z04 1, 6 ( ) Services: Obtain a sample of material from the jobsite, bring the sample back to the laboratory and perform a moisture density relationship test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company DATE SAMPLED: 09/26/2005 TEST FOR: L/T Paving Subgrade MATERIAL PREPARATION: Moist NIATERIAL: Lime Treated Medium Brown RAMMER TYPE: Mechanical Sandy Silty Clay w/ Limestone SANIPLED BY: K. Brimingham CLASSIFICATION: L/T Paving Subgrade SAMPLE LOCATION: On Site, Station 66 +10 TEST METHOD: ASTM D -698 ASTM D -4318 Method B REPORT OF TEST MAXIMUM DRY DENSITY, pcf: 109.0 MOISTURE DENSITY RELATIONS 112 Zero air voids curve OPTIMUM MOISTURE CONTENT, %: 16.5 Specific Gravity 2.70 LIQUID LIMIT: 110 Dry PLASTIC LIMIT: Density (pct) PLASTICITY INDEX: Non - plastic 108 106 • 104 12 14 16 18 20 22 24 MOISTURE CONTENT ( %) 4 O F Technician: Ken Br11nin ham � ' Report Distribution: EPA �, 4 (1) City of Coppell i ( l ) City of Coppell K. Scott Watson, AET (1) Tiseo Paving CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 06 Page 1 of 1 Rone Engineering 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630 -9745 MOISTURE DENSITY RELATIONS Client: City of Coppell Report No.: 242108 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Date of Service: 09/26/2005 Coppell TX 75019 Report Date: 09/29/2005 Project: East Sandy Lake Road ST 93 -01 " Zk10 2 Services: Obtain a sample of material from the jobsite, bring the sample back to the laboratory and perform a moisture density relationship test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company DATE SAMPLED: 09/26/2005 TEST FOR: L/T Paving Subgrade MATERIAL PREPARATION: Moist MATERIAL: Lime Treated Tan & Reddish RAMMER TYPE: Mechanical Brown Sandy Clay w/ Limestone SAMPLED BV: K. Brimingham CLASSIFICATION: L/T Paving Subgrade SAMPLE LOCATION: On Site, Station 64 +00 TEST METHOD: ASTM D -698 ASTM D -4318 Method B REPORT OF TEST MAXIMUM DRY DENSITY, pcf: 100,0 MOISTURE DENSITY RELATIONS 109 Zero air voids curve OPTIMUM MOISTURE CONTENT, %: 17.5 Specific Gravity 2.70 LIQUID LIMIT: 107 Dry PLASTIC LIMIT: Density (pct) PLASTICITY INDEX: Non- plastic 105 103 101 12 14 16 18 20 22 24 MOISTURE CONTENT ( %) Technician: Ken Brimingham CAI Report Distpp ution: , a / f (1) Cit of Coppell �� (I) City of Coppell K. Scott Watson, AET (1) Tiseo Paving CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 06 Page 1 of 1 Rone Engineering 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630 -9745 MOISTURE DENSITY RELATIONS Client: City of Coppell Report No.: 242107 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Date of Service: 09/26/2005 Coppell TX 75019 Report Date: 09/29/2005 Project: East Sandy Lake Road 1 1 ST 93 -01 L�� Z L� Services: Obtain a sample of material from the jobsite, bring the sample back to the laboratory and perform a moisture density relationship test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company DATE SAMPLED: 09/26/2005 TEST FOR: L/T Paving Subgrade MATERIAL PREPARATION: Moist MATERIAL: Lime Treated Light Reddish RAMMER TYPE: Mechanical Brown Sandy Clay SAMPLED BY: K. Brimingham CLASSIFICATION: L/T Paving Subgrade SAMPLE LOCATION: On Site, Station 60 +90 TEST METHOD: ASTM D -698 ASTM D -4318 Method A REPORT OF TEST MAXIMUM DRY DENSITY, pcf: ,1 12.5 MOISTURE DENSITY RELATIONS OPTIMUM MOISTURE CONTENT, %: 113 Zero'air voids curve 14.5 Specific Gravity 2.70 LIQUID LIMIT: 111 Dry 1 PLASTIC LIMIT: Density (pci) PLASTICITY INDEX: Non- plastic 109 107 I -e. 1 . :_ __. at 105 r t • ,. 1 10 12 14 16 18 20 22 MOISTURE CONTENT ( %) �PA / _ j g �i Technician: Ken Brimingham ` // Report Distribution: �' j I (I) City of Coppell / el ( 1 ) City of Coppell K. Scott Watson, AET (1) Tiseo Paving CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 06 Page 1 of 1 R one Engineering 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630 -9745 MOISTURE DENSITY RELATIONS Client: City of Coppell Report No.: 242106 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Date of Service: 09/26/2005 Coppell TX 75019 Report Date: 09/29/2005 Project: East Sandy Lake Road ,_OF C AI� v ST 93 -01 Services: Obtain a sample of material from the bring the sample back to the laboratory and perform a moisture density relationship test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company DATE SAMPLED: 09/26/2005 TEST FOR: L/T Paving Subgrade MATERIAL PREPARATION: Moist MATERIAL: Lime Treated Reddish & Medium RAMMERTYPE: Mechanical Brown Sandy Clay w/ Limestone SAMPLED BY: K. Brimingham CLASSIFICATION: L/T Paving Subgrade SAMPLE LOCATION: On Site, Station 59 +20 TEST METHOD: ASTM D -698 ASTM D -4318 Method B REPORT OF TEST MAXIMUM DRY DENSITY, pcf: 108.0 MOISTURE DENSITY RELATIONS 112 Zero air voids curve OPTIMUM MOISTURE CONTENT, %: 16.0 Specific Gravity 2.70 LIQUID LIMIT: 26 110 Dry PLASTIC LIMIT: 25 Density (Pct) PLASTICITY INDEX: 1 108 106 104 11 13 15 17 19 21 23 MOISTURE CONTENT ( %) Alr Technician: Ken Brui nmgham ' �,� f i� Report Distribution: i'' , r (I) City of Coppell / ' � r (1) City of Coppell (1) Tiseo Paving K. Scott Watson, AET CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 06 Page 1 of 1