Loading...
ST9301-LR051031 � Engineering 8908 Ambassador Row, Dallas, TX 75247 1 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630 -9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Report No.: 242368 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Date of Service: 09/29/2005 Coppell TX 75019 Report Date: 10/31/2005 Project: East Sandy Lake Road 'f1 V- "� 41 Q e ST 93 -01 i l Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company MIX DESIGN LD.: 6.5 Sack MEASURED SLUMP CONCRETE SUPPLIER: Tiseo PLACEMENT DATE: 09/29/2005 (inches) PLANT: NA WEATHER CONDITIONS: Clear 2.75 SPECIFICATION REQUIREMENTS TIME SAMPLED: 3:45pm BATCH TIME: 2:30pm STRENGTH: 3600 psi @ 28 Days TEMPERATURE (F) - AIR 90 F CONCRETE: 95 F SLUMP (in): 4" maximum TRUCK NO: NA TICKET NO: 166 AIR ( %): 5% - 6% AIR CONTENT ( %): 6.1 UNIT WEIGHT (pci): NA TEST METHOD: ASTM C -172 OVERALL PLACEMENT LOCATION: ASTM C -31 except 9. ] .2 North side of approach to Nursery from Sandy Lake ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -1231 SAMPLE LOCATION: Southest corner ASTM C -39 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE 1 1 10/03/2005 4 6.00 28.26 115210 4070 Unbonded Cap 1 2 10/06/2005 7 6.00 28.26 126690 4480 Unbonded Cap 1 3 10/27/2005 28 6.00 28.26 159890 5650 Unbonded Cap 1 4 10/27/2005 28 6.00 28.26 148930 5270 Unbonded Cap Average 5460 1 5 Hold