Loading...
ST9301-LR050811 w. i 8908 Ambassador Row, Dallas, TA 75247 2696 Gravel Drive, Fort worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 r ? Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 239250 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Date of Service: 08/09/2005 Coppell TX 75019 Report Date: 08/11/2005 Project: East Sandy Lake Road } M ''l ST 93-01 V' ` // Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Gauge: Troxler 3430 Test Methods: ASTM D -2922 Moisture Density ASTM D -3017 Gauge Serial No: 24675 Current: 580 Current: 2782 Test Mode: DT Previous: 611 Previous: 2800 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Reddish Brown Clayey Sand w /trace sandstone 14.0 113.0 Optimum +5 95 min 2 Reddish Brown Sandy Silty Clay 12.5 116.5 Optimum +5 95 min 1 1 _∎ - - - - TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pcf) (pcf) (% max) Manhole backfill 101 1 Station 55 +39, 50' left, 3' below grade 6" 1 15.0 131.3 114.2 Manhole backfill 101 2 Station 55 +39, 50' left, 2' below grade 6" 1 14.6 130.5 113.9 Manhole backfill 97 3 Station 55 +39, 50' left, 1' below grade 6" 1 16.3 127.4 109., Test results on this report meet project specification. Ron e S tarted: 12:30 d. Technician: Dan Rogers p Finished: 5:45pm Report Distribution: (1) City of Coppell Clay Stark P (1) City of Coppell Project Manager (1) Tiseo Paving LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be ape 1 of 1 except in full without the written approval of Rone Engineering Services, Ltd n �cc t Engineering [ e r 8908 Ambassador Row, Dallas, TX 75247 4 I I 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 41 - , . Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 239058 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Date of Service: 08/05/2005 Coppell TX 75019 Report Date: 08/11/2005 Project: East Sandy Lake Road ' ',� i�11 vv ST 93 -01 k" 9 4171 Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Test Methods: ASTM D - 2922 Gauge: Troxler 3430 Moisture Density ASTM D -3017 Gauge Serial No: 25249 Current: 664 Current: 2424 Test Mode: DT Previous: 658 Previous: 2426 MOISTURE DENSITY RELATIONS Maximum Project Requirements MID No. Description Moisture % Density pcf Moisture Density 1 Reddish Brown Clayey Sand w /trace sandstone 14.0 113.0 Optimum +5 95 min 2 Reddish Brown Sandy Silty Clay 12.5 116.5 Optimum +5 95 min FIELD DENSITY TESTS TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pcf) (pcf) (% max) Manhole 1 Manhole, Station 31 +40, east side, 7' below 6" 1 15.9 127.8 110.3 98 grade Manhole 2 Manhole, Station 31 +40, north side, 6' 6" 1 17.8 129.9 110.3 98 below grade Manhole 3 Manhole, Station 31 +40, west side, 5' below 6" 1 16.2 125.0 107.6 95 grade Manhole 4 Manhole, Station 31 +40, south side, 4' 6" 2 15.1 133.3 115.8 99 below grade LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 07SS Page 1 of 2 Report No.: 239058 111111111=12 ..___. Project No.: 059909 Client: City of Coppell TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pcf) (pcf) (% max) Manhole 5 Manhole, Station 31 +40, east side, 3' below 6" 2 13.1 129.2 114.2 98 grade Manhole 6 Manhole, Station 31 +40, north side, 2' 6" 2 12.6 130.3 115.7 99 below grade Manhole 7 Manhole, Station 31 +40, west side, 1' below 6" 2 13.0 131.6 116.5 100 grade Paving subgrade 8 Station 46 +25, westbound, subgrade 6" 1 10.7* 117.3 106.0 94* Manhole 9 Manhole, Station 41 +10 westbound, east 6" 2 12.8 130.1 115.3 99 side, 7' below grade Manhole 10 Manhole, Station 41 +10 westbound, west 6" 2 15.1 131.1 113.9 98 side, 6' below grade Manhole 11 Manhole, Station 41 +10 westbound, north 6" 2 13.9 131.9 115.8 99 side, 5' below grade Manhole 12 Manhole, Station 41 +10 westbound, south 6" 2 13.9 132.7 116.5 100 side, 4' below grade Manhole 13 Manhole, Station 41 +10 westbound, east 6" 2 16.1 129.9 111.9 96 side, 3' below grade Manhole 14 Manhole, Station 41 +10 westbound, north 6" 2 14.0 131.1 115.0 99 side, 2' below grade Manhole 15 Manhole, Station 41 +10 westbound, west 6" 2 13.0 128.3 113.5 97 side, 1' below grade An asterisk ( *) appears next to test results which do NOT meet the project specification Technician: Jack Roberts Started: 7:30am Finished: 5:30pm Rone i/' rin Report Distribution: F op/ (1) City of Coppell II (1) City of Coppell C ay Stark (1) Tiseo Paving Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 07SS Page 2 of 2 u ■ i 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 238997 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Date of Service: 08/04/2005 Coppell TX 75019 Report Date: 08 Project: East Sandy Lake Road ���" ST 93 -01 � zo(, - A ' Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Test Methods: Gauge: Troxler 3430 Moisture Density ASTM D -2922 ASTM D -3017 Gauge Serial No: 25249 Current: 658 Current: 2426 Test Mode: DT Previous: 654 Previous: 2431 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Reddish Brown Clayey Sand w /trace sandstone 14.0 113.0 Optimum +5 95 min TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. (%) (pcf) (pcf) (% max) Manholes 1 Station 38 +53, 7' below grade 6" 1 17.3 128.1 109.2 97 Manholes 2 Station 38 +53, 6' below grade 6" 1 17.4 128.6 109.5 97 Manholes 3 Station 38 +53, 5' below grade 6" 1 16.7 130.5 111.8 99 Manholes 4 Station 38 +53, 4' below grade 6" 1 16.9 128.2 109.7 97 Manholes 5 Station 38 +53, 3' below grade 6" 1 15.1 126.7 110.1 97 Manholes 6 Station 38 +53, 2' below grade 6" 1 16.2 125.5 108.0 96 Manholes 7 Station 38 +53, 1' below grade 6" 1 17.7 127.1 108.0 96 Manholes LI1vIITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 07SS Page 1 of 2 :R.eport No.: 238997 ? roject No.: 059909 Client: City of Coppell TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (Pcf) (Pef) (% max) 8 Station 33 +60, 7' below grade 6" 1 17.6 127.8 108.7 96 Manholes 9 Station 33 +60, 6' below grade 6" 1 18.5 129.5 109.3 97 Manholes 10 Station 33 +60, 5' below grade 6" 1 15.0 126.2 109.7 97 Manholes 11 Station 33 +60, 4' below grade 6" 1 15.2 128.7 111.7 99 Manholes 12 Station 33 +60, 3' below grade 6" 1 16.1 128.3 110.5 98 Manholes 13 Station 33 +60, 2' below grade 6" 1 18.1 127.9 108.3 96 Manholes 14 Station 33 +60, l' below grade 6" 1 17.2 132.1 112.7 100 Test results on this report meet project specification. Manholes on westbound Sandy Lake Road. Ro il • mg Technician: Jack Roberts Started: 9 :3Oam Finished: 3:30pm Report Distribution: tri re- (1) City of Coppell ' Clay Stark P (1) City of Coppell Project Manager (1) Tiseo Paving LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance. etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be ap 2 of reproduced except in full without the written approval of Rone Engineering Services, Ltd. u7SS � 8908 Ambassador Raw, Dallas, TX 15247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150. Houston, TX 77040 f" 2 s t . „ Corporate Phone: (214) 630 -9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Report No.: 237708 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Coppell TX 75019 Date of Service: 07/13/2005 Report Date: 08/11/2005 Project: East Sandy Lake Road �� 4 ST 93 -01 Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company MIX DESIGN LD.: 9616B MEASURED SLUMP CONCRETE SUPPLIER: Southern Star PLACEMENT DATE: 07/13/2005 (inches) PLANT: 29 WEATHER CONDITIONS: Cloudy 4.0 SPECIFICATION REQUIREMENTS TIME SAMPLED: 2:25pm BATCH TIME: NA STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 93 F CONCRETE: 94 F SLUMP (in): 4" maximum TRUCK NO: 1029 TICKET NO: 974424 AIR ( %): NA AIR CONTENT ( %): NA UNIT WEIGHT (pcf): NA TEST METHOD: ASTM C -172 OVERALL PLACEMENT LOCATION: ASTM C-31 except 9.12 Manhole ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -1231 SAMPLE LOCATION: Manhole at Station 1-1-54 on ASTM C -39 REPORT OF TESTS eastbound Sandy Lake Road Concrete Compressive Cylinder 6" x 12" CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (Ibs. force) (psi) TYPE 1 1 07/20/2005 7 6.00 28.26 105780 3740 Unbonded Cap 1 2 08/10/2005 28 6.00 28.26 124860 4420 Unbonded Cap 1 3 08/10/2005 28 6.00 28.26 123870 4380 Unbonded Cap Average 4400 1 4 Hold A / See Report #237707 for technician time. ei / hn' i n Started: Finished: R ona ' r i n Tec tc a Jullo Per g Report Distribution: (1) City of Coppell (1) City of Coppell Clay Stark (1) Tiseo Paving Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc ) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. CISS Page 1 of 1