Loading...
ST9301-LR050901 y o n Q Engineering 8908 Ambassador Row, Dallas, TX 75247 a Lf / V 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 , V Corporate Phone: (214) 630 -9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Report No.: 238878 Ms. Suzan Taylor PO Box 9478 Project No.: 059909 Coppell TX 75019 Date of Service: 08/02/2005 Report Date: 09/01/2005 Project: East Sandy Lake Road i 1 - (h - 2204 Aj ST 93 -01' Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company MIX DESIGN LD.: 9616 -B MEASURED SLUMP CONCRETE SUPPLIER: Southern Star PLACEMENT DATE: 08/02/2005 (inches) PLANT: 29 WEATHER CONDITIONS: Sunny 3.5 SPECIFICATION REQUIREMENTS TIME SAMPLED: 2:3Opm BATCH TIME: NA STRENGTH: 0 psi @ 0 Days TEMPERATURE (F) - AIR 95 F CONCRETE: 90 F SLUMP (in): NA TRUCK NO: 95 TICKET NO: 1030372 AIR ( %): NA AIR CONTENT ( %): NA UNIT WEIGHT (pcf): NA TEST METHOD: ASTM C -172 OVERALL PLACEMENT LOCATION: ASTM C -31 except 9.1.2 Manhole ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -1231 SAMPLE LOCATION: Line F, Station 40 +00 ASTM C -39 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE 1 1 08/09/2005 7 6.00 28.26 108580 3840 Unbonded Cap 1 2 08/30/2005 28 6.00 28.26 149740 5300 Unbonded Cap 1 3 08/30/2005 28 6.00 28.26 147730 5220 Unbonded Cap Average 5260 1 4 Hold Ai Technician: Julio Perez Started: 12:30pm Finished: 3:30pm . in ./ Report Distribution: I (1) City of Coppell i/ (1) City of Coppell K. Scott Watson, AET (1) Tiseo Paving CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 11SS Page 1 of 1 Fl one Engineering 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 r 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630 -9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Report No.: 238625 Ms. Suzan Taylor * Project No.: 059909 PO Box 9478 Coppell TX 75019 )0 Date of Service: 07/29/2005 ( . � Report Date: 09/01/2005 Project: East Sandy Lake Road ST 93 -01 Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company MIX DESIGN I.D.: 9616 -B MEASURED SLUMP CONCRETE SUPPLIER: Southern Star PLACEMENT DATE: 07/29/2005 (inches) PLANT: 29 WEATHER CONDITIONS: Sunny 3.0 SPECIFICATION REQUIREMENTS TIME SAMPLED: 2:45pm BATCH TIME: NA STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 94 F CONCRETE: 92 F SLUMP (in): 4" maximum TRUCK NO: 1029 TICKET NO: 1030201 AIR ( %): NA AIR CONTENT ( %): NA UNIT WEIGHT (pcf): NA TEST METHOD: ASTM C -172 OVERALL PLACEMENT LOCATION: ASTM C -31 except 9.1.2 Inlet ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -1231 SAMPLE LOCATION: Inlet walls, Station 45 +98 +50 on , ASTM C -39 REPORT OF TESTS westbound Sandy Lake Road Concrete Compressive Cylinder 6" x 12" CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (Ibs. force) (psi) TYPE 1 1 08/05/2005 7 6.00 28.26 110860 3920 Unbonded Cap 1 2 08/26/2005 28 6.00 28.26 140200 4960 Unbonded Cap 1 3 08/26/2005 28 6.00 28.26 144850 5120 Unbonded Cap Average 5040 1 4 Hold See Report #238624 for technician time. Technician: Julio Perez Started: Finished: Ro , e Engi iring Report Distribution: 1 / (1) City of Coppell Ap A . ` (1) City of Coppell 411K.son Creasy, AET (1) Tiseo Paving Project Manage LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 0 1SS Page 1 of 1