Loading...
ST9301-LR050816 g S90S Ambassador Row, Dallas, Ty: 71247 Aone 2 696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 ' , : Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 239219 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Date of Service: 08/09/2005 Coppell TX 75019 Report Date: 08/16/2005 Project: East Sandy Lake Road 1110 * 2» (4 13 ST 93 -01 Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Test Methods: Gauge: Troxler 3430 Moisture Density ASTM D -2922 ASTM D -3017 Gauge Serial No: 25249 Current: 666 Current: 2435 Test Mode: DT Previous: 662 Previous: 2423 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Reddish Brown Clayey Sand w /trace sandstone 14.0 113.0 Optimum +5 95 min 2 Reddish Brown Sandy Silty Clay 12.5 116.5 Optimum +5 95 min FIELD DENSITY TESTS TEST PROBE MAD MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pcf) (pcf) (% max) Manhole backfill 1 Station 46 +22, west, 5' below grade 6" 2 16.0 133.6 115.2 99 Manhole backfill 2 Station 46 +22, north, 4' below grade 6" 1 17.7 131.4 111.6 99 Manhole backfill 3 Station 46 +22, south, 3' below grade 6" 2 14.8 130.6 113.8 98 Manhole backfill 4 Station 46 +22, east, 2' below grade 6" 2 14.8 132.1 115.1 99 Manhole backfill 5 Station 46 +22, west, l' below grade 6" 2 16.4 131.5 113.0 97 Manhole backfill 6 Station 55 +39, north, 5' below grade 6" 1 17.2 131.4 112.1 99 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rope Engineering, Services, Ltd 0 7TM Page 1 of 2 Report No.: 239219 u Project No.: 059909 Project Client: City of Coppell TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pcf) (pcf) (% max) Manhole backfill 7 Station 55 +39, south, 4' below grade 6" 1 17.2 131.6 112.3 99 Test results on this report meet project specification. i Technician: Jack Roberts Started: $:OOam Finished: 1:OOpm Rone , g'; . _o. Report Distribution: (1) City of Coppel] (1) City of Coppell C A Stark (1) Tiseo Paving Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. )7TM Page 2 of 2