Loading...
ST9301-LR050718 Q f h' S ir n n n ..L n ��gg 2 2` 9 r , - -ONE tti'�,.�JE , .i��N X14 , 9S19 0. ; � 1 . dor1_ F �./ _ - ��� „ � ■■ ■ 84 :..,. alias, TX 75247 11.11=111 W ` 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 130, Houston, TX 77040 Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Ms. Suzan Taylor Report No.: 237635 PO Box 9478 project No.; 059909 CoppeII x 75019 Date of Service: 07/12/2005 Report Date: 07/18/2005 Project: East Sandy Lake Road I � .t Z 01{240 ST 93 -01 Services: Perform In -Place Density Test in accordance with ASTM Standards. ROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Test Methods: Age ]:3_2922 Gauge: Troxler 3430 Moisture Gauge Serial No: 35519 Density ASTM D -3017 Current: 620 Current: 2578 Test Mode: DT Previous: 687 Previous: 2600 MOISTT_TRE DENSITY RELATIONS NUD No. Maximum Project Requirements Description Moisture % Density per Moisture Density t 3' 1 Reddish Brown Sandy Silty Clay 12.5 116.5 Optimum +5 95 min FIE D D N &TTV TE,ST,S l'1 ST PROBE MID MOISTURE WET DENSITY T)RY DENSITY DENSITY NO TEST )LOCATION DEPTH No. % � ) (Per) (Pct (/o max) Paving fill 1 East Sandy Lake Road, Station 42 +00, 6" 1 12.5 128.9 114.6 98 elevation 448', 3rd lift Paving fill 2 East Sandy Lake Road, Station 41+50, 6" 1 13.7 128.5 113.0 97 elevation 443', 3rd lift Paving fill 3 East Sandy Lake Road, Station 41 +00, 6" 1 13.0 127.0 112.4 96 elevation 448', 3rd lift Paving fill 4 East Sandy Lake Road, Station 39+50, 6" 1 12.6 127.0 112.8 97 elevation 446', 3rd lift Test results on this report meet project specification. Technician: Julio Perez Started: 12 :00p Finished: 4:45 m R�4/49,1 Report Distribution: r !.) Cite of Coppell p � 1) City of Coppcll ' . Scott Watson, .A,ET l} Tisco Paving CMT Operations Manager LIMITATIONS' The test results presented herein were prepared based upon the speciE& samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc ) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Ronc Engineering Services, Ltd. TM Page 1 of 1 i i 8908 Ambassador Row, Dallas, TX 75247 2 696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 i ' - Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Report No.: 237496 Ms. . Suzan Taylor Client: s Coppell Project No.: 059909 Ms. PO Box 9478 Date of Service: 07/09/2005 Coppell TX 75019 Report Date: 07/18/2005 Project: East Sandy Lake Road ST 93 -01 Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA Standard Counts CONTRACTOR: Tiseo Paving Company Gauge: Troxler 3430 Moisture Density Test Methods: ASTM D - 2922 Gauge Serial No: 24875 Current: 611 Current: 2800 ASTM D -3017 Test Mode: DT Previous: 603 Previous: 2803 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Reddish Brown Clay with gravel & asphalt 7.5 124.5 Optimum +5 95 min 2 Reddish Brown Sandy Silty Clay 12.5 116.5 Optimum +5 95 min 3 Light Brown Sandy Clay w/ Limestone Fragments 11.0 122.5 Optimum +5 95 min PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY TEST NO TEST LOCATION DEPTH No. ( %) (Pcf) (Pct) (% max) Paving fill 1 7 9 134.3 124.5 100 1 Westbound, Station 28 +50, 30' left of 6" centerline, elevation 445.0 Paving fill 2 Westbound, Station 34 +00, 45' left of 6" 2 11.5* 120.8 108.3 93* centerline, elevation 445.0 Paving fill 13 2 130.1 114.9 99 3 Westbound, Station 37 +00, 50' left of 6" 2 centerline, elevation 445.0 Paving fill LIMITATIONS. The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality for t e use of the clients to whom they are addressed and shall not of be except in conditions ulll without he written approval Our letters and oval of Rone Engineering Servies. reports d Page 1 of 2 2eport No.: 237496 ?roject No.: 059909 Client: City of Coppell PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY TEST NO TEST LOCATION DEPTH No. ( %) (pcf) (pcf) (% max) 4 Westbound, Station 37 +00, 30' left of 6 " 2 14.0 124.2 108.9 93* centerline, elevation 445.0 Paving fill 8.2* 125.3 115.8 95 5 Westbound, Station 40 +00, 30' left of 6" 3 centerline, elevation 446.0 Paving fill 6 Westbound, Station 40 +00, 45' left of 6" 3 8.8* 126.5 116.3 centerline, elevation 443.0 An asterisk ( *) appears next to test results which do NOT meet the project speci c do .________ 01 Ron r,, i f ieeri Technician: Dan Rogers Started: 2:45pm Finished: 6:OOpm , Report Distribution: _ • (1) City of Coppell Clay Stark P (1) City of Coppell Project Manager (1) Tiseo Paving LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality for (composition, e exclusive eof the clients to whom they are addressed and sha matter l not be except in full the written approval Our letters and oval of Rone Engineering Services, Ltd. for Page 2 of 2