Loading...
ST9301-LR050721 one Engineering 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothwav, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630 -9745 REPORT OF CANCELLATION OF IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 237989 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Coppell TX 75019 Date of Service: 07/19/2005 Report Date: 07/21/2005 Project: East Sandy Lake Road } `,,� ST 93-01 `�'�t� 1 �C Services: Cancellation of In -Place Density Testing Report of Cancellation On this date a Rone Engineers, Ltd. representative arrived on site as scheduled. Upon arrival, our representative was informed that testing /inspection was cancelled for the day. Technician Time: 12:OOpm - 2:30pm Page 1 of 1 Rone Engineering Technician: Julio Perez Report Distribution: (1) City of Coppell �"'z (1) City of Coppell Clay Stark (1) Tiseo Paving Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. )9TM Pau 1 of 1 8908 Ambassador Row, Dallas, TX 75247 4 Engineering 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 1- .V.--;.- _ , , Corporate Phone: (214) 630 - 9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 237942 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Coppell TX 75019 Date of Service: 07/18/2005 Report Date: 07/21/2005 Project: East Sandy Lake Road ST 93 -01 .Z Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Gauge: Troxler 3430 Test Methods: ASTM D -2922 Moisture Density ASTM D -3017 Gauge Serial No: 35519 Current: 674 Current: 2580 Test Mode: DT Previous: 673 Previous: 2596 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Reddish Brown Sandy Silty Clay 12.5 116.5 Optimum +5 95 min FIELD DENSITY TESTS TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pcf) (pcf) (% max) Backfill 1 Wire wall, Station 32 +00, 2nd lift 6" 1 14.1 129.6 113.6 98 Backfill 2 Wire wall, Station 29 +75, 2nd lift 6" 1 15.5 129.0 111.7 96 Subgrade 3 East Sandy Lake Road, elevation 448.0, 6" 1 13.6 129.9 114.3 98 Station 41 +00, 4th lift Subgrade 4 East Sandy Lake Road, elevation 447.5, 6" 1 13.8 129.6 113.9 98 Station 38+00, 4th lift Subgrade 5 East Sandy Lake Road, elevation 447.5, 6" 1 15.0 129.8 112.9 97 Station 33 +00, 4th lift Subgrade LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd )7TM Page 1 of 2 aeport No.: 237942 ig iiroject No.: 059909 Client: City of Coppell TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pcf) (pcf) (% max) 6 East Sandy Lake Road, elevation 447.0, 6" 1 14.6 130.3 113.7 98 Station 32 +00, 4th lift Subgrade 7 East Sandy Lake Road, elevation 449.0, 6" 1 15.3 129.2 112.1 96 Station 29 +00, 4th lift Test results on this report meet project specification. . , 44 Technician: Julio Perez Started: 12:30p Finished: 4:15pm Rone r n _ Report Distribution: (1) City of Coppell (1) City of Coppell (Fry Stark (1) Tiseo Paving Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 07TM Page 2 of 2