Loading...
ST9301-LR050804 8908 Ambassador Row, Dallas, TX 75247 k ilo n e Engineering 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 vii, Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 238311 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Date of Service: 07/25/2005 Coppell TX 75019 Report Date: 08/04/2005 Project: East Sandy Lake Road 'o-i 2Ab ST 93-01 I , e�-t Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Test Methods: ASTM D -2922 Gauge: Troxler 3430 Moisture Density ASTM D -3017 Gauge Serial No: 35519 Current: 678 Current: 2561 Test Mode: DT Previous: 671 Previous: 2563 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Reddish Brown Sandy Silty Clay 12.5 116.5 Optimum +5 95 min FIELD DENSITY TESTS TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pcf) (pcf) (% max) Backfill 1 Wire wall, Station 34 +00 6" 1 13.4 130.5 115.1 99 Backfill 2 Wire wall, Station 38 +00 6" 1 13.1 129.1 114.1 98 Backfill 3 8" water line, Station 35 +13, 4' below grade 6" 1 13.0 129.3 114.4 98 Backfill 4 8" water line, Station 35 +13, 3' below grade 6" 1 13.0 130.0 115.0 99 Backfill 5 8" water line, Station 35 +13, 2' below grade 6" 1 14.4 129.5 113.2 97 Backfill 6 8" water line, Station 35 +13, 1' below grade 6" 1 13.1 130.1 115.0 99 Backfill 7 8" water line, Station 35 +13, final 6" 1 14.2 128.7 112.7 97 Backfill LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 17TM Page 1 of 2 Report No.: 238311 Ns Project No.: 059909 Client: City of Coppell TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pci) (pcf) (% max) 8 8" water line, Station 39 +00, 4' below grade 6" 1 16.2 133.6 115.0 99 Backfill 9 8" water line, Station 39 +00, 3' below grade 6" 1 15.0 134.3 116.8 100 Backfill 10 8" water line, Station 39 +00, 2' below grade 6" 1 13.7 128.4 112.9 97 Backfill 11 8" water line, Station 39 +00, 1' below grade 6" 1 14.3 130.5 114.2 98 Backfill 12 8" water line, Station 39 +00, grade 6" 1 15.1 131.6 114.3 98 Backfill 13 8" water line, Station 49 +39, 2' below grade 6" 1 16.3 131.9 113.4 97 Backfill 14 8" water line, Station 49 +39, 1' below grade 6" 1 14.3 131.1 114.7 98 Backfill 15 8" water line, Station 49 +39, final 6" 1 14.3 130.9 114.5 98 Backfill 16 8" water line, Station 50 +50, 3' below grade 6" 1 15.0 134.3 116.8 100 Backfill 17 8" water line, Station 50 +50, 2' below grade 6" 1 14.2 131.0 114.7 98 Backfill 18 8" water line, Station 50 +50, l' below grade 6" 1 13.3 129.0 113.9 98 Backfill 19 8" water line, Station 50 +50, grade 6" 1 13.2 128.4 1 ..4 97 Test results on this report meet project specification. Roi 'n.>In •gig Technician: Julio Perez Started: 1:15am Finished: 5:45pm �� 128.4 Report Distribution: (1) City of Coppell Wir (1) City of Coppell lay Stark (I) Tiseo Paving Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance. etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 1 J7TM Page 2 of 2 5908 ambassador Row, Dallas, TX 75247 2 696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 , 4 Corporate Phone: (214) 630 -9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Report No.: 237321 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Coppell TX 75019 Date of Service: 07/06/2005 Report Date: 08/04/2005 Project: East Sandy Lake Road \VL ST 93 -01 Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company MIX DESIGN I.D.: 9616 -B MEASURED SLUMP CONCRETE SUPPLIER: Southern Star PLACEMENT DATE: 07/06/2005 (inches) PLANT: 29 WEATHER CONDITIONS: Partly cloudy 4.0 SPECIFICATION REQUIREMENTS TIME SAMPLED: 3:05pm BATCH TIME: NA STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 91 F CONCRETE: 90 F SLUMP (in): 3" - 5" TRUCK NO: 1092 TICKET NO: 974034 AIR ( %): NA AIR CONTENT ( %): NA UNIT WEIGHT (pcf): NA TEST METHOD: ASTM C -172 OVERALL PLACEMENT LOCATION: ASTM C -3 1 except 9 12 Inlet ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -1231 SAMPLE LOCATION: Inlet walls, Sandy Lake Road, ASTM C -39 REPORT OF TESTS Station 1 +19 Concrete Compressive Cylinder 6" x 12" CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (Ibs. force) (psi) TYPE 1 1 07/13/2005 7 6.00 28.26 102440 3620 Unbonded Cap 1 2 08/03/2005 28 6.00 28.26 123940 4380 Unbonded Cap 1 3 08/03/2005 28 6.00 28.26 122640 4340 Unbonded Cap Average 4360 1 4 Hold / d Technician: Julio Perez Started: 12:OOpm Finished: 4:OOpm Ro' ' i , . 1 ering Report Distribution: (1) City of Coppell (1) City of Coppell Clay Stark (1) Tiseo Paving Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd 01SS Page 1 of 1