Loading...
ST9301-LR050608 one 8908 Ambassador Row, Dallas, TX 75247 Engineering 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630 -9745 MOISTURE DENSITY RELATIONS Client: City of Coppell Report No.: 235239 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Date of Service: 06/06/2005 Coppell TX 75019 Report Date: 06/08/2005 Project: East Sandy Lake Road �� � sal 6 ST 93 -01!- Services: Test a sample of material delivered to our laboratory by others to perform a moisture density relationship test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company DATE SAMPLED: 06/06/2005 TEST FOR: Embankment fill MATERIAL PREPARATION: Moist MATERIAL: Reddish Brown Sandy Silty Clay RAMMER TYPE: Mechanical SAMPLED BY: Client CLASSIFICATION: Embankment fill SAMPLE LOCATION: Wier Bros. off site, Dallas II TEST METHOD: ASTM D -698 ASTM D -4318 Method A REPORT OF TEST MAXIMUM DRY DENSITY, pcf: 116.5 MOISTURE DENSITY RELATIONS OPTIMUM MOISTURE CONTENT, %: 120 12.5 Zero air v ids ' 2.7 Specific Gravity 2.70 REQUIREMENTS LIQUID LIMIT: 41 118 Dry PLASTIC LIMIT: 17 Density (pcf) PLASTICITY INDEX: 24 116 % PASSING #200: 51.1* Maximum 35.0 114 An asterisk ( *) appears next to test results 112 which do NOT meet the project specifications as notes above. 8 10 12 14 16 18 20 MOISTURE CONTENT ( %) 11 Ron, i g {eer Technician: Clay Stark Report Distribution: (1) City of Coppell (1) City of Coppell Clay Stark (1) Tiseo Paving Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. ..6 Page 1 of 1