Loading...
ST9301-LR050630 i ° 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 236696 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Date of Service: 06/24/2005 Coppell TX 75019 Report Date: 06/30/2005 Project: East Sandy Lake Road ST 93 -01 Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Test Methods: Gauge: Troxler 3430 Moisture Density ASTM D - 2922 ASTM D -3017 Gauge Serial No: 35518 Current: 742 Current: 2730 Test Mode: DT Previous: 740 Previous: 2736 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Reddish Brown Sandy Silty Clay 12.5 116.5 Optimum +5 95 min 1 16,,, I - TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pci) (pcf) (% max) Fill 1 Westbound lane, Station 0 +55, centerline 6" 1 13.0 130.0 115.0 99 left, 1st lift_ Ai / Test results on this report meet project specification. Ro / g Tec hnician: Joe Jernigan Started: 2:30pm Finished: 4:OOpm Report Distribution: (1) City of Coppell — (1 )City of Coppell Clay Stark (1) Tiseo Paving Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing.. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd 07TH Page 1 of 1 8908 Ambassador Row, Dallas, TX 75247 2 696 Gravel Drive, Fort Worth, TX 76118 Q t+ 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 236634 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Date of Service: 06/24/2005 Coppell TX 75019 Report Date: 06/30/2005 Project: East Sandy Lake Road ST 93 -01 rt _ GI° Services: Perform In -Place Density Test in accordance with ASTM Standards. 7f PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Gauge: Troxler 3430 Test Methods: ASTM D -2922 Moisture Density ASTM D -3017 Gauge Serial No: 35518 Current: 742 Current: 2730 Test Mode: DT Previous: 740 Previous: 2736 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Reddish Brown Sandy Silty Clay 12.5 116.5 Optimum +5 95 min FIELD DENSITY TESTS TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pcf) (pct) (% max) Fill 1 Westbound lane, Station 0 +25, 1st lift 6" 1 13.2 128.3 113.3 97 Test results on this report meet project specification. Technician: Joe Jernigan Started: 8:OOam Finished: 9:15am Roy `��t• � g Report Distribution: (1) City of Coppell /i (1) City of Coppell 'Flay Stark (I) Tiseo Paving roject Manager LIMITATIONS. The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 07TM Page 1 of 1 ADne Engineering ` 8908 Ambassador Row, Dallas, TX 75247 =6 - 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630 -9745 REPORT OF IN -PLACE DENSITY CANCELLATION Client: City of Coppell Report No.: 237045 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Date of Service: 06/30/2005 Coppell TX 75019 Report Date: 06/30/2005 Project: East Sandy Lake Road ST 93-01 7_,C) NC: Services: In -Place Density Cancellation Report of Cancellation On this date a Rone Engineers, Ltd. representative arrived on site as scheduled. Upon arrival, our representative was informed that testing /inspection was cancelled for the day. Technician Time: 2:15pm — 3:30pm Rone Engineering Technician: Jason Bartholomew � . Report Distribution: ;- /26 (1) City of Coppell O tY PP el (1) City of copper Clay Stark (1) Tiseo Paving Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 49SS Pate 1 of 1 ° 8908 Ambassador Row, Dallas, TX 15247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Y " , Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 237015 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Date of Service: 06/30/2005 Coppell TX 75019 Report Date: 06/30/2005 Project: East Sandy Lake Road ST 93 -01 Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Test Methods: Gauge: Troxler 3411 -B Moisture Density ASTM D -2922 ASTM D -3017 Gauge Serial No: 4645 Current: 576 Current: 1688 Test Mode: DT Previous: 569 Previous: 1663 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Reddish Brown Sandy Silty Clay 12.5 116.5 Optimum +5 95 min 1 1 TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pcf) (pct) (% max) Embankment 1 Sandy Lake Drive embankment, Station 6" 1 14.8 129.6 112.9 97 28 +00, 2nd lift Embankment 2 Sandy Lake Drive embankment, Station 6" 1 15.2 129.1 112.1 96 33 +50, 1st lift Test results on this report meet project specification. R,e ; eri Technician: Jason Bartholomew Started: 10:30a Finished: 12:15p Report Distribution: NI 1 r (1) City of Coppell (1) City of Coppell CIF y Stark (1) Tiseo Paving Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 07SS Page 1 of 1