ST9301-LR050701 Done Engineering
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630 -9745
REPORT OF IN -PLACE DENSITY CANCELLATION
Client: City of Coppell Report No.: 236962
Ms. Suzan Taylor Project No.: 059909
PO Box 9478 Date of Service: 06/29/2005
Coppell TX 75019
Report Date: 07/01/2005
Project: East Sandy Lake Road
ST 93-01
(
Services: In -Place Density Cancellation N � (�
Report of Cancellation
On this date a Rone Engineers, Ltd. representative arrived on site as scheduled.
Upon arrival, our representative was informed that testing /inspection was
cancelled for the day.
Technician Time: 3:15 pm to 4:30 pm
Page 1 of 1
Rone Engineering
Technician: Bobby Robinson
Report Distribution: (Ai 4'(;
(1) City of Coppell
(1) City of Coppell Clay Stark
(1) Tiseo Paving Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
99 Page 1 of 1
vzone Engineering
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630 -9745
REPORT OF CANCELLATION OF IN -PLACE DENSITY
Client: City of Coppell Report No.: 236575
Ms. Suzan Taylor Project No.: 059909
PO Box 9478 Date of Service: 06/23/2005
Coppell TX 75019 Report Date: 07/01/2005
Project: East Sandy Lake Road
ST 93 -01
()g
Services: Cancellation of In Place Density 1;2
Report of Cancellation
On this date a Rone Engineers, Ltd. representative arrived on site as scheduled.
Upon arrival, our representative was informed that testing /inspection was
cancelled for the day.
Technician Time: 1:45pm — 2:30pm
Page 1 of 1
Rone Engineering
Technician: Joe Jernigan
Report Distribution: ////C'
(1) City of Coppell
(1) City of Coppell 7 Clay Stark
(1) Tiseo Paving Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
99TM Page 1 of 1
Rone Engineering
8908 Ambassador Row, Dallas, TX 75247
2696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630 -9745
REPORT OF IN -PLACE DENSITY CANCELLATION
Client: City of Coppell Report No.: 236874
Ms. Suzan Taylor Project No.: 059909
PO Box 9478 Date of Service: 06/28/2005
Coppell TX 75019 Report Date: 07/01/2005
Project: East Sandy Lake Road
ST 93 -01
Services: In -Place Density Cancellation 2
Add Trip
Report of Cancellation
On this date a Rone Engineers, Ltd. representative arrived on site as scheduled.
Upon arrival, our representative was informed that testing /inspection was
cancelled for the day.
Technician Time: 2:30 pm to 2:45 pm
Page 1 of 1
Rone Engineering
Technician: Scott Fagan
Report Distribution: r z "mil a22. .44
(�_
(l) City of Coppell `�
(I) City of Coppell /T Clay Stark
(1) Tiseo Paving Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
99 Paee 1 of 1
8908 Ambassador Row, Dallas, TX 75247
2 696 Gravel Drive, Fort Worth, TX 76118
6300 Rothway, Ste. 150, Houston, TX 77040
Corporate Phone: (214) 630 -9745
IN -PLACE DENSITY TESTING
Client: City of Coppell Report No.: 236801
Ms. Suzan Taylor Project No.: 059909
PO Box 9478 Date of Service: 06/27/2005
Coppell TX 75019 Report Date: 07/01/2005
Project: East Sandy Lake Road Z\,'
ST 93 -01
Services: Perform In -Place Density Test in accordance with ASTM Standards. 2
PROJECT DATA
CONTRACTOR: Tiseo Paving Company Standard Counts
Test Methods: Gauge: Troxler 3430 Moisture Density
ASTM D -2922
ASTM D -3017 Gauge Serial No: 35518 Current: 744 Current: 2742
Test Mode: DT Previous: 742 Previous: 2730
MOISTURE DENSITY RELATIONS
Maximum Project Requirements
M/D No. Description Moisture % Density pcf Moisture Density
1 Reddish Brown Sandy Silty Clay 12.5 116.5 Optimum +5 95 min
1 1 ■
TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY
NO TEST LOCATION DEPTH No. ( %) (pcf) (pct) (% max)
Fill
1 WB2, Station 4 +25, centerline 6" 1 13.0 130.0 115.0 99
Test results on this report meet project specification.
Technician: Joe Jernigan Started: 2:OOpm Finished: 3:15pm
Rone �,��
Report Distribution:
Jr
(1) City of Coppell
(I) City of Coppell W+ay'Stark
(1) Tiseo Paving Project Manager
LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality
(composition, appearance. etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are
for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.
07SS Page 1 of 1