Loading...
ST9301-LR050526 Rone Engineering 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 233945 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 / U Date of Service: 05/17/2005 Coppell TX 75019 2W 341 Report Date: 05/26/2005 Project: East Sandy Lake Road ST 93 -01 Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Test Methods: ASTM D -2922 Gauge: Troxler 3430 Moisture Density ASTM D -3017 Gauge Serial No: 33438 Current: 584 Current: 2717 Test Mode: DT Previous: 538 Previous: 2757 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Brown Sandy Clay w/ limestone fragments & 10.5 122.0 Optimum +5 95 min Organics 2 Light Brown Sandy Clay w/ Limestone Fragments 11.0 122.5 Optimum +5 95 min 3 Tan crushed limestone w/ Sandy Clay 14.5 115.5 Optimum +5 95 min FIELD DENSITY TESTS TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pcf) (pct) (% max) Paving 1 East Sandy Lake Road, westbound, 35' 6" 1 15.5 134.2 116.2 95 north of centerline, Station 64 +75, 1st lift Paving 2 East Sandy Lake Road, westbound, 40' 6" 2 11.2 129.9 116.8 95 north of centerline, Station 62 +50, 1st lift Paving 3 East Sandy Lake Road, westbound, 37' 6" 2 14.8 134.6 117.2 96 north of centerline, Station 60 +50, 1st lift Paving LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. D 7TM Page 1 of 2 �..y...w.=.... Report No.: 233945 MEOWS williiiildEl Project No.: 059909 Client: City of Coppell TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pcf) (pcf) (% max) 4 East Sandy Lake Road, westbound, 37' 6" 3 14.6 126.5 110.4 96 north of centerline, Station 58 +00, 1st lift Paving 5 East Sandy Lake Road, westbound, 37' 6" 3 16.3 129.6 111.4 96 north of centerline, Station 55 +00, 1st lift Paving 6 East Sandy Lake Road, westbound, 42' 6" 3 17.7 133.0 113.0 98 north of centerline, Station 52 +00, 1st lift Paving 7 East Sandy Lake Road, westbound, 40' 6" 2 11.5 132.9 119.2 97 north of centerline, Station 49 +00, 1st lift Test results on this report meet project specification. 4, �� g - • Technician: Ken Brimingham Started: 6:45am Finished: 10:15a Report Distribution: �j (1) City of Coppell m' (1) City of Coppell clay Stark (1) Tiseo Paving Project Manager LINIITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 07TM Page 2 of 2 e n n Engineering 8908 Ambassador Row, Dallas, TX 75247 Rone 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630 -9745 MOISTURE DENSITY RELATIONS Client: City of Coppell, i 0 Report No.: 234427 Ms. Suzan Taylor j G��� Project No.: 059909 Box Co TX 7 Cam' �J� 39 Coppell TX 75019 Date of Service: 05/24/2005 Report Date: 05/26/2005 Project: East Sandy Lake Road ST 93 -01 Services: Obtain a sample of material from the jobsite, bring the sample back to the laboratory and perform a moisture density relationship test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company DATE SAMPLED: 05/24/2005 TEST FOR: Fill MATERIAL PREPARATION: Moist MATERIAL: Medium Brown Clayey Sand RAMMERTYPE: Mechanical SAMPLED BY: Joe Jernigan CLASSIFICATION: Fill SAMPLE LOCATION: Imported TEST METHOD: ASTM D -698 ASTM D -4318 Method A REPORT OF TEST MAXIMUM DRY DENSITY, per: 123.5 MOISTURE DENSITY RELATIONS 125 Zero air voids curve OPTIMUM MOISTURE CONTENT, %: 10.5 Specific Gravity 2.65 REQUIREMENTS 123 i_ _ LIQUID LIMIT: 29 Dry PLASTIC LIMIT: 14 Density (Pet) 1 PLASTICITY INDEX: 15 121 f % PASSING #200: 31.9 Maximum 35.0 119 , ' � , 1. Test results on this report meet project 117 specifications as noted above. 6 8 10 12 14 16 18 MOISTURE CONTENT ( %) o RI e r4 ' Technician: Joe Jerni frr ,r Report Distribution: (1) City of Coppell (1) City of Coppell Clay Stark Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rorie Engineering Services, Ltd. 06 Page 1 of 1