Loading...
ST9301-LR050425 R one Engineering 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630 -9745 MOISTURE DENSITY RELATIONS Client: City of Coppell Report No.: 232291 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 c Date of Service: 04/21/2005 Coppell TX 75019 i �.1 Sol Report Date: 04/25/2005 Project: East Sandy Lake Road �� �� ST 93 -01 Services: Obtain a sample of material from the bring the sample back to the laboratory and perform a moisture density relationship test in accordance \ with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company DATE SAMPLED: 04/21/2005 TEST FOR: General Fill MATERIAL PREPARATION: Moist MATERIAL: Light Brown Sandy Clay w/ RAMMERTYPE: Mechanical Limestone Fragments SAMPLED BY: J. Jernigan CLASSIFICATION: General Fill SAMPLE LOCATION: Contractor Supplied Sample TEST METHOD: ASTM D -698 ASTM D -4318 Method B REPORT OF TEST MAXIMUM DRY DENSITY, pcf: 122.5 MOISTURE DENSITY RELATIONS 123 Zero air voids curve OPTIMUM MOISTURE CONTENT, %: 1 1 .0 Specific Gravity 2.70 LIQUID LIMIT: 33 1 Dry PLASTIC LIMIT: ] 6 Density (pcf) PLASTICITY INDEX: 17 119 / ti 117 i t :ti I 1 115 's 1 it 6 8 10 12 14 • 16 18 MOISTURE CONTENT ( %) - if Technician: Joe Jernigan neering Report Distribution: fi - (1) City ofCoppell (1) City of Coppel l Clay Stark Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 06 Page 1 of 1 Rime Engineering 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 6300 Rothway, Ste. 150, Houston, TX 77040 Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 231704 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 �� Coppell TX 75019 Date of Service: 04/13/2005 �� ���0 Report Date: 04/25/2005 Project: East Sandy Lake Road Z ST 93 -01 Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Gauge: Troxler 3430 Standard Counts Test Methods: ASTM D -2922 Moisture Density ASTM D -3017 Gauge Serial No: 35558 Current: 610 Current: 2430 Test Mode: DT Previous: 609 Previous: 2491 MOISTURE DENSITY RELATIONS Maximum Project Requirements MAD No. Description Moisture % Density pcf Moisture Density 1 Brown Sandy Clay w/ limestone fragments & 10.5 122.0 Optimum +4 95 min Organics FIELD DENSITY TESTS TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pci) (pci) (% max) Paving subgrade 1 East Sandy Lake Road, Station 55 +75 6" 1 12.3 135.5 120.7 99 Paving subgrade 2 East Sandy Lake Road, Station 58 +75 6" 1 13.2 134.9 119.2 98 Paving subgrade 3 East Sandy Lake Road, Station 61 +50 6" 1 12.0 133.6 119.3 98 Test results on this report meet project specification. •�i�/ ' • Technician: Julio Perez Started: 8 :00am Finished: 10:15a Ro 1 I i er _ Report Distribution: ,P/ (I) City of Coppell (1) City of Coppell Wlay Stark Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd 07TM Page 1 of 1