Loading...
ST9301-LR060901 a n e Engineering 8908 Ambassador Row, Dallas, TX 75247 4221 Freidrich Lane, Ste 195, Austin, TX 78744 7701 W Little York, Ste 600, Houston, TX 77040 Corporate Phone: (214) 630 -9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Report No.: 262645 Ms. Suzan Taylor PO Box 9478 Project No.: 0611391 Coppell TX 75019 Date of Service: 08/01/2006 Report Date: 09/01/2006 Project: East Sandy Lake Road ST 93 -01 Completion Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company MIX DESIGN I.D.: 2446M MEASURED SLUMP CONCRETE SUPPLIER: Tiseo Paving PLACEMENT DATE: 08/01/2006 (inches) PLANT: NA WEATHER CONDITIONS: Clear 3.25 SPECIFICATION REQUIREMENTS TIME SAMPLED: 9 :SOam BATCH TIME: 9:38am STRENGTH: 3600 psi @ 28 Days TEMPERATURE (F) - AIR 87 F CONCRETE: 92 F SLUMP (in): 3" - 5" TRUCK NO: 165 TICKET NO: 10 AIR ( %): 4% - 6% AIR CONTENT ( %): 4.75 UNIT WEIGHT (pct): NA TEST METHOD: ASTM C -172 OVERALL PLACEMENT LOCATION: ASTM C -31 except 9.1.2 Paving, east and westbound turning lanes of Sandy Lake Road ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -1231 SAMPLE LOCATION: Eastbound lane of Sandy Lake Road ASTM C -39 REPORT OF TESTS from Riverchase Drive, 80' south Concrete Compressive Cylinder 6" x 12" CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (Ibs. force) (psi) TYPE 1 1 08/08/2006 7 5.99 28.17 84720 3010 Unbonded Cap 1 2 08/29/2006 28 6.00 28.26 109330 3870 Unbonded Cap 1 3 08/29/2006 28 6.00 28.26 110240 3900 Unbonded Cap Average 3890 1 4 Hold LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 01TM Page 1 of 2 one Engineering 8908 Ambassador Row, Dallas, TX 75247 V V 4221 Freidrich Lane, Ste 195, Austin, TX 78744 7701 W Little York, Ste 600, Houston, TX 77040 Corporate Phone: (214) 630 -9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Report No.: 262645 Ms. Suzan Taylor Project No.: 0611391 PO Box 9478 Date of Service: 08/01/2006 Coppell TX 75019 Report Date: 09/01/2006 Project: East Sandy Lake Road ST 93 -01 Completion Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company MIX DESIGN I.D.: 2446M MEASURED SLUMP CONCRETE SUPPLIER: Tiseo Paving PLACEMENT DATE: 08/01/2006 (inches) PLANT: NA WEATHER CONDITIONS: Clear 4.0 SPECIFICATION REQUIREMENTS TIME SAMPLED: 1 1:45am BATCH TIME: 1 1:O7am STRENGTH: 3600 psi @ 28 Days TEMPERATURE (F) - AIR 89 F CONCRETE: 90 F SLUMP (in): 3" - 5" TRUCK NO: 163 TICKET NO: 17 AIR ( %): 4% - 6% AIR CONTENT ( %): 4.25 UNIT WEIGHT (pcf): NA TEST METHOD: ASTM C -172 OVERALL PLACEMENT LOCATION: ASTM C -31 except 9.1.2 Paving, east and westbound turning lanes of Sandy Lake Road ASTM C -143 ASTM C-23 1 ASTM C -1064 ASTM C-123 1 SAMPLE LOCATION: 10' north from eastbound lane on ASTM C -39 REPORT OF TESTS Riverchase Drive Concrete Compressive Cylinder 6" x 12" CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE 2 1 08/08/2006 7 5.99 28.17 104030 3690 Unbonded Cap 2 2 08/29/2006 28 6.00 28.26 131080 4640 Unbonded Cap 2 3 08/29/2006 28 6.00 28.26 127130 4500 Unbonded Cap Average 4570 2 4 Hold Technician: Korey Neal Started: 8:30am Finished: 12:45pm R I 1 ' r ng'n • . 1 g Report Distribution: / (1) City of Coppell (1) City of Coppell ... K. Scott Watson, AET (1) Tiseo Paving Company Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. OITM Page 2 of 2