Loading...
ST9301-LR060914 Roane Engineering 8908 Ambassador Row, Dallas, TX 75247 4221 Freidrich Lane, Ste 195, Austin, TX 78744 LI 7701 W Little York, Ste 600, Houston, TX 77040 Corporate Phone: (214) 630 -9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Report No.: 263454 Ms. Suzan Taylor Project No.: 0611391 PO Box 9478 Coppell TX 75019 Date of Service: 08/10/2006 Report Date: 09/14/2006 Project: East Sandy Lake Road ST 93 -01 Completion Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company MIX DESIGN LD.: 2446 MEASURED SLUMP CONCRETE SUPPLIER: Tiseo PLACEMENT DATE: 08/10/2006 (inches) PLANT: 011 site WEATHER CONDITIONS: Clear 2.0 SPECIFICATION REQUIREMENTS TIME SAMPLED: 8 :25am BATCH TIME: 7:56am STRENGTH: 3600 psi @ 28 Days TEMPERATURE (F) - AIR 89 F CONCRETE: 94 F SLUMP (in): 4" - 6" TRUCK NO: 166 TICKET NO: 6 AIR ( %): 4% - 6% AIR CONTENT ( %): 4.2 UNIT WEIGHT (pcf): NA TEST METHOD: ASTM C -172 OVERALL PLACEMENT LOCATION: ASTM C -31 Paving by hand, noses at intersection Riverview and Sandy Lake Road, Trinity Court and e `�y` 9.12 Sandy Lake Road, east and west, Riverchase Drive and Sandy Lake Road, east of crossover ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -1231 SAMPLE LOCATION: Riverchase Drive and Sandy Lake ASTM C -39 REPORT OF TESTS Road, east side of crossover Concrete Compressive Cylinder 6" x 12" CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE 1 1 08/17/2006 7 6.00 28.26 126610 4480 Unbonded Cap 1 2 09/07/2006 28 6.00 28.26 148260 5240 Unbonded Cap 1 3 09/07/2006 28 6.00 28.26 148390 5250 Unbonded Cap Average 5250 1 4 Hold A%4 0.1111P Technician: Javier Martinez Started: 7:45am Finished: 9:30am `' »/ 1' Report Distribution: / 1 ? 4/ 1 - (1) City of Coppell (1) City of Coppell K. Scott Watson, AET (1) Tiseo Paving Company Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 1TM Page 1 of 1