Loading...
ST9301-LR061226 o n Engineering i ri 8908 Ambassador Row, Dallas, TX 75247 V 7701 W. Little York, Suite 600, Houston, TX 77040 4221 Freidrich Lane, Suite 195, Austin, TX 78744 Corporate Phone: (214) 630 -9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Report No.: 271198 Ms. Suzan Taylor Project No.: 0611391 PO Box 9478 Coppell TX 75019 Date of Service: 11/09/2006 Report Date: 12/26/2006 Project: East Sandy Lake Road ST 93 -01 Completion Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company MIX DESIGN I.D.: 724 MEASURED SLUMP CONCRETE SUPPLIER: Redi Mix PLACEMENT DATE: 11/09/2006 (inches) PLANT: 1 WEATHER CONDITIONS: Clear 2.5 SPECIFICATION REQUIREMENTS TIME SAMPLED: 3:1 Spm BATCH TIME: 1:36pm STRENGTH: 0 psi @ 0 Days TEMPERATURE (F) - AIR 80 F CONCRETE: 84 F SLUMP (in): 4" maximum TRUCK NO: 306 TICKET NO: 179824 AIR ( %): NA AIR CONTENT ( %): 1.9 UNIT WEIGHT (pc!): NA TEST METHOD: ASTM C -172 OVERALL PLACEMENT LOCATION: ASTM C -3 1 Sign base piers, Sandy Lake Road and Trinity Court except 9. ] 2 ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -1231 SAMPLE LOCATION: Same as above ASTM C -39 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (Ibs. force) (psi) TYPE 1 1 11/16/2006 7 5.99 28.17 85860 3050 Unbonded Cap 1 2 12/07/2006 28 5.98 28.07 113230 4030 Unbonded Cap 1 3 12/07/2006 28 5.98 28.07 112170 3990 Unbonded Cap Average 4010 1 4 Hold See report #271197 for technician time. 410 / i lle Technician: Pat Parks Started: Finished: � '� �' Report Distribution: ". (1) City of Coppell if �.�� (1) City of Coppell K. Scott Watson, AET (I) Tiseo Paving Company Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. IBS Page 1 of 1 Rone Engineering 8908 Ambassador Row, Dallas, TX 75247 7701 W. Little York, Suite 600, Houston, TX 77040 4221 Freidrich Lane, Suite 195, Austin, TX 78744 Corporate Phone: (214) 630 -9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Report No.: 271197 Ms. Suzan Taylor Project No.: 0611391 PO Box 9478 Date of Service: 11/09/2006 Coppell TX 75019 Report Date: 12/26/2006 Project: East Sandy Lake Road ST 93 -01 Completion Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company MIX DESIGN I.D.: 1851 MEASURE D CONCRETE SUPPLIER: LMC PLACEMENT DATE: 11/09/2006 (inches) PLANT: 7 WEATHER CONDITIONS: Clear 4.0 SPECIFICATION REQUIREMENTS TIME SAMPLED: 2:2Opm BATCH TIME: 1:34pm STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F) - AIR 78 F CONCRETE: 80 F SLUMP (in): 4" maximum TRUCK NO: 1045 TICKET NO: 7173024 AIR ( %): NA AIR CONTENT ( %): 4.4 UNIT WEIGHT (pct): NA TEST METHOD: ASTM C -172 OVERALL PLACEMENT LOCATION: ASTM C-31 1 for bridge railing., 1200 block of westbound Sandy Lake Road except 9. ] 2 y ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -1231 SAMPLE LOCATION: 30' west of east end of footing ASTM C -39 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (Ibs. force) (psi) TYPE 1 1 11/16/2006 7 5.99 28.17 94890 3370 Unbonded Cap 1 2 12/07/2,006 28 5.98 28.07 123440 4390 Unbonded Cap 1 3 12/07/2006 28 5.98 28.07 118420 4220 Unbonded Cap Average 4310 1 4 Hold Water added at site: 5 gallons !! ,, Technician: Pat Parks Started: 1:30pm Finished: 4:OOpm , � A ∎Ar /- ' °' /— Report Distribution: , I � I (1) City of Coppell • J (1) City of Coppell K. Scott Watson, AET (1) Tiseo Paving Company Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. HSS Page 1 of 1