Loading...
ST9301-LR060720 Rone Engine ring 8908 Ambassador Row, Dallas, TX 75247 V E Engineering 4221 Freidrich Lane, Ste 195, Austin, TX 78744 7„ , 7701 W Little York, Ste 600, Houston, TX 77040 ` ` Corporate Phone: (214) 630 -9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Report No.: 260633 Ms. Suzan Taylor Project No.: 0611391 PO Box 9478 Coppell TX 75019 Date of Service: 07/07/2006 Report Date: 07/20/2006 Project: East Sandy Lake Road ST 93 -01 Completion Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company MIX DESIGN LD.: 2446M MEASURED SLUMP CONCRETE SUPPLIER: Tiseo PLACEMENT DATE: 07/07/2006 (inches) PLANT: NA WEATHER CONDITIONS: Clear 2.5 SPECIFICATION REQUIREMENTS TIME SAMPLED: 1 1:OOam BATCH TIME: NA STRENGTH: 3600 psi @ 28 Days TEMPERATURE (F) - AIR 87 F CONCRETE: 91 F SLUMP (in): 3" maximum TRUCK NO: 162 TICKET NO: 50 AM ( %): 4% - 6% AIR CONTENT ( %): 5.25 UNIT WEIGHT (pcf): NA TEST METHOD: ASTM C -172 OVERALL PLACEMENT LOCATION: ASTM C -31 Pavement, eastbound lane of Sandy Lake Road except 9.1.2 ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -1231 SAMPLE LOCATION: Southeast comer of Riverchase ASTM C -39 REPORT OF TESTS and Sandy Lake Road Concrete Compressive Cylinder 6" x 12" CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGT FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (Ibs. force) (psi )__ TYPE 1 1 07/10/2006 3 6.00 28.26 94760 350 `� Unbonded Cap 1 2 07/14/2006 7 6.00 28.26 100480 3550 Unbonded Cap 1 3 07/14/2006 7 6.00 28.26 104120 3680 Unbonded Cap Average \ 3620 1 4 08/04/2006 28 0.00 0.00 Unbonded Cap 1 5 08/04/2006 28 0.00 0.00 Unbonded Cap 1 6 Hold LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. nlcc POOP 1 of 7 Report No.: 260633 Rorie Engineering MIME V 1111111111111111 Project No.: 0611391 Client: City of Coppell CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (Ibs. force) (psi) TYPE Technician: Korey Neal Started: 9:OOam Finished: 12:OOp arngi a ring Report Distribution: — (1) City of Coppell (1) City of Coppell tt Watson, AET (1) Tiseo Paving Company �o ( Project Manager • LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. A, cc Porn:. 1 of 7 n e Engineering g i n e e r i n 8908 Ambassador Row, Dallas, TX 75247 v V V ■ 4221 Freidrich Lane, Ste 195, Austin, TX 78744 7701 W Little York, Ste 600, Houston, TX 77040 ` ea Corporate Phone: (214) 630 -9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Report No.: 260651 Ms. Suzan Taylor Project No.: 0611391 PO Box 9478 Date of Service: 07/07/2006 Coppell TX 75019 Report Date: 07/20/2006 Project: East Sandy Lake Road ST 93 -01 Completion Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company MIX DESIGN I.D.: 2446M MEASURED SLUMP CONCRETE SUPPLIER: Tiseo Paving PLACEMENT DATE: 07/07/2006 (inches) PLANT: NA WEATHER CONDITIONS: Clear 2.75 SPECIFICATION REQUIREMENTS TIME SAMPLED: 2 :1 Opm BATCH TIME: NA STRENGTH: 3600 psi @ 28 Days TEMPERATURE (F) - AIR 93 F CONCRETE: 94 F SLUMP (in): 3" maximum TRUCK NO: 166 TICKET NO: 73 AIR ( %): 4% - 6% AIR CONTENT ( %): 4.5 UNIT WEIGHT (pcf): NA TEST METHOD: ASTM C -172 OVERALL PLACEMENT LOCATION: ASTM C -31 except 9.1.2 Pavement, eastbond Sandy Lake Road ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -1231 SAMPLE LOCATION: From Saint Joseph Apartment ASTM C -39 REPORT OF TESTS entrance 120' east Concrete Compressive Cylinder 6" x 12" CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (Ibs. force) (psi) TYPE 1 1 07/10/2006 3 6.00 28.26 88530 3130 Unbonded Cap 1 2 07/14/2006 7 6.00 28.26 97710 3460 Unbonded Cap 1 3 07/14/2006 7 6.00 28.26 99890 3530 Unbonded Cap Average 3500 1 4 08/04/2006 28 0.00 0.00 Unbonded Cap 1 5 08/04/2006 28 0.00 0.00 Unbonded Cap 1 6 Hold LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. MCC Poop nf7. Report No.: 260651 Rone Engineering Project No.: 0611391 Client: City of Coppell CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (Ibs. force) (psi) TYPE Technician: Korey Neal Started: 1:30pm Finished: 3:30p i i: i e E 'lie ring Report Distribution: (I) City of Coppell ' 4 (1) City of Coppell r K. Scott Watson, AET (1) Tiseo Paving Company Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 1ISS Page 2 of 2 n e A Engineering 8908 Ambassador Row, Dallas, TX 75247 V. v 4221 Freidrich Lane, Ste 195, Austin, TX 78744 7701 W Little York, Ste 600, Houston, TX 77040 Corporate Phone: (214) 630 -9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Report No.: 256878 Ms. Suzan Taylor Project No.: 0611391 PO Box 9478 Date of Service: 05/19/2006 Coppell TX 75019 Report Date: 07/20/2006 Project: East Sandy Lake Road ST 93 -01 Completion \I �hCk Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company MIX DESIGN I.D.: 1261 MEASURED SLUMP CONCRETE SUPPLIER: LMC PLACEMENT DATE: 05/19/2006 (inches) PLANT: 7 WEATHER CONDITIONS: Clear 4.25 SPECIFICATION REQUIREMENTS TIME SAMPLED: 1:27pm BATCH TIME: 12:23pm STRENGTH: 3000 psi @ 28 Days TEMPERATURE (F) - AIR 90 F CONCRETE: 95 F SLUMP (in): 4" maximum TRUCK NO: 972 TICKET NO: 7164714 AIR ( %): NA AIR CONTENT ( %): NA UNIT WEIGHT (pct): NA TEST METHOD: ASTM C -172 OVERALL PLACEMENT LOCATION: ASTM C -3 1 except 9.1 2 Rip rap, northeast corner of box culvert ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -1231 SAMPLE LOCATION: 10' east, 7' north from southwest ASTM C -39 REPORT OF TESTS corner Concrete Compressive Cylinder 6" x 12" CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE 1 1 05/26/2006 7 6.00 28.26 51410 1820 Unbonded Cap 1 2 06/16/2006 28 6.00 28.26 87030 3080 Unbonded Cap 1 3 06/16/2006 28 6.00 28.26 77290 2730 * Unbonded Cap Average 2910 1 4 07/14/2006 56 6.00 28.26 103400 3660 Unbonded Cap * Does not comply with specified strength. Technician: Ken Brimingham Started: 12 :OOp m Finished: 1:3/ph R ng E 1 gi 1 eering Report Distribution: J / (1) City of Coppell _ _ _ (1) City of Coppell l K. Scott Watson, AET (1) Tiseo Paving Company Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. MSS Page 1 of 1