Loading...
ST9301-LR060803 n e Engineering 8908 Ambassador Row, Dallas, TX 75247 �+ VV 4221 Freidrich Lane, Ste 195, Austin, TX 78744 7701 W Little York, Ste 600, Houston, TX 77040 Corporate Phone: (214) 630 -9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Report No.: 261876 Ms. Suzan Taylor Project No.: 0611391 PO Box 9478 Date of Service: 07/24/2006 Coppell TX 75019 Report Date: 08/03/2006 Project: East Sandy Lake Road ST 93 -01 Completion Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company MIX DESIGN I.D.: NA MEASURED SLUMP CONCRETE SUPPLIER: Tiseo Paving PLACEMENT DATE: 07/24/2006 (inches) PLANT: On site WEATHER CONDITIONS: Partly cloudy 2.0 SPECIFICATION REQUIREMENTS TIME SAMPLED: 9:16am BATCH TIME: 9 :1 Oam STRENGTH: 3600 psi @ 28 Days TEMPERATURE (F) - AIR 86 F CONCRETE: 95 F SLUMP (in): 1" - 3" TRUCK NO: 161 TICKET NO: NA AIR ( %): 4% - 6% AIR CONTENT ( %): 5.2 UNIT WEIGHT (pcf): NA TEST METHOD: ASTM C -172 OVERALL PLACEMENT LOCATION: ASTM C -31 Paving, crossover on Sandy Lake Road, Station 24 +10 to 25+50; westbound turn lane, except 9.12 Station 29 +00 to 30 +90; eastbound turn lane, Station 30 +00 to 34 +00 ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -1231 SAMPLE LOCATION: Westbound turn lane, Station 29 +20 ASTM C -39 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.i� (Ibs. force) .si) _ TYPE 1 1 07/27/2006 3 6.00 ' 8.26 106640 3770 Unbonded Cap 1 2 07/31/2006 7 5.99 28.17 125380 4450 Unbonded Cap 1 3 08/21/2006 28 0.00 0.00 Unbonded Cap 1 4 08/21/2006 28 0.00 0.00 Unbonded Cap 1 5 Hold Notified leader of crew of test results. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. i1SS Page 1 of 3 Report No.: 261876 Rone Engineering Project No.: 0611391 Client: City of Coppell Notified John with Tiseo of concrete temperature. Technician: Javier Martinez Started: 8:15am Finished: 3:15pm on: n eering Report Distribution: / (1) City of Coppell (1) City of Coppell � K. Scott Watson, AET (1) Tiseo Paving Company Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 1SS Page 3 of 3 one Engineering 8908 Ambassador w, , TX 7547 2 4221 Freidrich Lane Ste Ro 195 Austin TX 78744 7701 W Little York, Ste 600, Houston, TX 77040 - Corporate Phone: (214) 630 -9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Report No.: 261876 Ms. Suzan Taylor Project No.: 0611391 PO Box 9478 Date of Service: 07/24/2006 Coppell TX 75019 Report Date: 08/03/2006 Project: East Sandy Lake Road ST 93 -01 Completion Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company MIX DESIGN I.D.: NA MEASURED SLUMP CONCRETE SUPPLIER: Tiseo Paving PLACEMENT DATE: 07/24/2006 (inches) PLANT: On site WEATHER CONDITIONS: Partly cloudy 2.75 SPECIFICATION REQUIREMENTS TIME SAMPLED: 1 1:39am BATCH TIME: 1 1:3Oam STRENGTH: 3 600 psi @ 28 Days TEMPERATURE (F) - AIR 93 F CONCRETE: 96 F SLUMP (in): 1" - 3" TRUCK NO: 162 TICKET NO: NA AIR ( %): 4% - 6% AIR CONTENT ( %): 5.9 UNIT WEIGHT (pcf): NA TEST METHOD: ASTM C -172 OVERALL PLACEMENT LOCATION: ASTM C -31 Paving, Sandy Lake Road, Station 35 +00; drive -in, Station 35 +00 to address 1101 -1269 except 9.12 Sandy Lake Road; noses, Station 28 +00 and 35 +00 ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -1231 SAMPLE LOCATION: Eastbound turn lane, Station 33 +00 ASTM C -39 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) - (S9114 (Ibs. force) (p )-- TYPE 2 1 07/27/2006 3 6.00 %28.26 102000 ( Unbonded Cap / 2 2 07/31/2006 7 5.99 :. 7 117090 4150 Unbonded Cap 2 3 08/21/2006 28 0.00 0.00 Unbonded Cap 2 4 08/21/2006 28 0.00 0.00 Unbonded Cap 2 5 Hold Notified leader of crew of test results. LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. i1SS Page 2 of 3