Loading...
ST9301-LR060821 e f1 n Engineering 8908 Ambassador Row, Dallas TX 75247 V V 4221 Freidrich Lane, Ste 195, Austin TX 78744 ;. 7701 W Little York, Ste 600, Houston TX 77040 u- '' Corporate Phone: (214) 630 -9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Report No.: 260651 Ms. Suzan Taylor Project No.: 0611391 PO Box 9478 Coppell TX 75019 Date of Service: 07/07/2006 Report Date: 08/21/2006 Project: East Sandy Lake Road ST 93 -01 Completion Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company MIX DESIGN I.D.: 2446M MEASURED SLUMP CONCRETE SUPPLIER: Tiseo Paving PLACEMENT DATE: 07/07/2006 (inches) PLANT: NA WEATHER CONDITIONS: Clear 2.75 SPECIFICATION REQUIREMENTS TIME SAMPLED: 2:1 Opm BATCH TIME: NA STRENGTH: 3600 psi @ 28 Days TEMPERATURE (F) - AIR 93 F CONCRETE: 94 F SLUMP (in): 3" maximum TRUCK NO: 166 TICKET NO: 73 AIR ( %): 4% - 6% AIR CONTENT ( %): 4.5 UNIT WEIGHT (pcf): NA TEST METHOD: ASTM C -172 OVERALL PLACEMENT LOCATION: ASTM C -31 except 9.1.2 Pavement, eastbond Sandy Lake Road ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -1231 SAMPLE LOCATION: From Saint Joseph Apartment ASTM C -39 REPORT OF TESTS entrance 120' east Concrete Compressive Cylinder 6" x 12" CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (Ibs. force) (psi) TYPE 1 1 07/10/2006 3 6.00 28.26 88530 3130 Unbonded Cap 1 2 07/14/2006 7 5.99 28.17 97710 3470 Unbonded Cap 1 3 07/14/2006 7 5.99 28.17 99890 3540 Unbonded Cap Average 3510 1 4 08/04/2006 28 6.00 28.26 130490 4610 Unbonded Cap 1 5 08/04/2006 28 6.00 28.26 126290 4470 Unbonded Cap Average 4540 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. OISS Page 1 of 2 Report No.: 260651 RoRo ®ineering Project No.: 0611391 Client: City of Coppell CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (Ibs. force) (psi) TYPE 1 6 Hold Technician: Korey Neal Started: 1:30pm Finished: 3:30pm Ro Engineering Report Distribution: (1) City of Coppell (1) City of Coppell K. Scott Watson, AET (I) Tiseo Paving Company i J Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 01SS Page 2 of 2 R one Engineering 8908 Ambassador Row, Dallas TX 75247 4221 Freidrich Lane, Ste 195, Austin TX 78744 7701 W Little York, Ste 600, Houston TX 77040 Corporate Phone: (214) 630 -9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Report No.: 260633 Ms. Suzan Taylor Project No.: 0611391 PO Box 9478 Date of Service: 07/07/2006 Coppell TX 75019 Report Date: 08/21/2006 Project: East Sandy Lake Road ST 93 -01 Completion Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company MIX DESIGN 1.D.: 2446M MEASURED SLUMP CONCRETE SUPPLIER: Tiseo PLACEMENT DATE: 07/07/2006 (inches) PLANT: NA WEATHER CONDITIONS: Clear 2.5 SPECIFICATION REQUIREMENTS TIME SAMPLED: 11:OOam BATCH TIME: NA STRENGTH: 3600 psi @ 28 Days TEMPERATURE (F) - AIR 87 F CONCRETE: 91 F SLUMP (in): 3" maximum TRUCK NO: 162 TICKET NO: 50 AIR ( %): 4% - 6% AIR CONTENT ( %): 5.25 UNIT WEIGHT (pc1): NA TEST METHOD: ASTM C -172 OVERALL PLACEMENT LOCATION: ASTM C -31 except 9.1.2 Pavement, eastbound lane of Sandy Lake Road ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -1231 SAMPLE LOCATION: Southeast comer of Riverchase ASTM C -39 REPORT OF TESTS and Sandy Lake Road Concrete Compressive Cylinder 6" x 12" CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STREN FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) .si) TYPE • 1 1 07/10/2006 3 6.00 28.26 94760 3350 Unbonded Cap 1 2 07/14/2006 7 5.99- 28.17 ? 100480 3570 Unbonded Cap 1 3 07/14/2006 7 5.99 28.17 104120 3690 ) Unbonded Cap Average 3630 / 1 4 08/04/2006 28 6.00 28.26 127260 4500 Unbonded Cap 1 5 08/04/2006 28 6.00 28.26 123450 4370 Unbonded Cap Average 4440 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. (PISS Page 1 of 2 Report No.: 260633 Rone Engineering Project No.: 0611391 Project Client: City of Coppell CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (Ibs. force) (psi) TYPE 1 6 Hold Technician: Korey Neal Started: 9:OOam Finished: 12:00pm one gineering Report Distribution: (1) City of Coppell (1) City of Coppell K./ cott Watson, AET (1) Tiseo Paving Company Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. o1SS Page 2 of 2