Loading...
ST9301-LR060612 Rone 8908 Ambassador Row, Dallas, TX 75247 c Engineering 4221 Freidrich Lane, Ste 195, Austin, TX 78744 7701 W Little York, Ste 600, Houston, TX 77040 Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 258096 Ms. Suzan Taylor Project No.: 0611391 PO Box 9478 Date of Service: 06/05/2006 Coppell TX 75019 Report Date: 06/12/2006 Project: East Sandy Lake Road ST 93 -01 Completion l N l7 (q 9 Z Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Test Methods: Gauge: Troxler 3430 Moisture Density ASTM D - 2922 ASTM D -3017 Gauge Serial No: 36438 Current: 702 Current: 2673 Test Mode: DT Previous: 717 Previous: 2764 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Brown Sandy Clay w/ Gravel 16.0 113.5 Optimum +4 95 min FIELD DENSITY TESTS TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pct) (pcf) (% max) Paving subgrade 1 Longmeade Drive, northbound lane, Station 6" 1 17.4 130.8 111.4 98 10 +50, final Test results on this report meet project specification. / ' Technician: Chris Currier Started: 2:OOpm Finished: 3:45pm JA/ � r ' i Report Distribution: /:!/ � ` (1) City of Coppell ii , — — (1) City of Coppell K. Scott Watson, AET (I) Tiseo Paving Company Project Manager • LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 07TM Page 1 of 1 one Engineering 8908 Ambassador Row, Dallas, TX 75247 V 1 Engineering 4221 Freidrich Lane, Ste 195, Austin, TX 78744 i 7701 W Little York, Ste 600, Houston, TX 77040 ; Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 257975 Ms. Suzan Taylor Project No.: 0611391 PO Box 9478 Date of Service: 06/02/2006 Coppell TX 75019 Report Date: 06/12/2006 Project: East Sandy Lake Road , , 9 '> . 0 / 4.7 ST 93 -01 Completion W �` V Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Test Methods: ASTM D -2922 Gauge: Troxler 3430 Moisture Density ASTM D -3017 Gau Serial No: 35518 Current: 740 Current: 2537 Test Mode: DT Previous: 738 Previous: 2536 MOISTURE DENSITY RELATIONS Maximum Project Requirements MID No. Description Moisture % Density pcf Moisture Density 1 Light Brown Clayey Sand w /Trace Limestone 10.0 117.5 Optimum +4 95 min Fragments FIELD DENSITY TESTS TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pcf) (pct) (% max) Backfill 1 60' from east end of south wall, 2nd lift 6" 1 11.6 126.1 113.0 96 Backfill 2 60' from west end of south wall, 2nd lift 6" 1 12.8 127.5 113.0 96 Test results on this report meet project specification. Technician: Joe Jernigan Started: 3:15pm Finished: 4:45pm i�� Report Distribution: , /T�P - , i (1) City of Coppell [ (1) City of Coppell K. Scott Watson, AET (1) Tiseo Paving Company Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 07SS Page 1 of 1