Loading...
ST9301-LR060626 Rone E ng i neer i ng 8908 Ambassador Row, Dallas, TX 75247 ,r 4221 Freidrich Lane, Ste 195, Austin, TX 78744 7701 W Little York, Ste 600, Houston, TX 77040 Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 258825 Ms. Suzan Taylor Project No.: 0611391 PO Box 9478 Coppell TX 75019 Date of Service: 06/13/2006 Report Date: 06/26/2006 Project: East Sandy Lake Road : ) ,6' (9c-1477 ST 93 -01 Completion Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Gauge: Troxler 3430 Test Methods: Moisture Density ASTM D -2922 t3' ASTM D -3017 Gauge Serial No: 35558 Current: 611 Current: 2388 Test Mode: DT Previous: 613 Previous: 2402 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Reddish Brown Clayey Sand w /trace sandstone 14.0 113.0 Optimum +5 95 min FIELD DENSITY TESTS TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pct) (pct) (% max) Paving fill 1 Eastbound, Sandy Lake R ', Station 6" 1 15.1 124.6 108.3 96 193 +50, 1.5' below gradk Paving fill 2 Eastbound, Sandy Lake Road, Station 6" 1 15.0 124.2 108.0 96 194 +50, 1.5' below grade Paving fill 3 Eastbound, Sandy Lake Road, Station 6" 1 15.2 127.0 110.2 98 193 +00, 1' below grade Test results on this report meet project specification. Technician: Dan Rogers Started: 12:30p Finished: 3:45pm •1 Oa" ! al . � " Report Distribution: L AP, . (1) City of Coppell (1) City of Coppell K. Scott Watson, AET (1) Tiseo Paving Company Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.