Loading...
ST9301-LR060628 Rone Engineering 8908 Ambassador Row, Dallas, TX 75247 4221 Freidrich Lane, Ste 195, Austin, TX 78744 ._,.> 7701 W Little York, Ste 600, Houston, TX 77040 Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 258976 Ms. Suzan Taylor Project No.: 0611391 PO Box 9478 Date of Service: 06/15/2006 Coppell TX 75019 Report Date: 06/28/2006 Project: East Sandy Lake Road ST 93 -01 Completion Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Test Methods: Gauge: Troxler 3430 Moisture Density ASTM D -2922 ASTM D -3017 Gauge Serial No: 36440 Current: 669 Current: 2854 Test Mode: DT Previous: 663 Previous: 2806 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Reddish Brown Clayey Sand w /trace sandstone 14.0 113.0 -21 +4 95 min FIELD DENSITY TESTS TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pcf) (pct) (% max) Roadway 1 Westbound Sandy Lake Road, 10' right of 6" 1 16.2 126.9 109.2 97 center lane, Station 43 +40 Roadway 2 Westbound Sandy Lake Road, 15' right of 6" 1 14.5 124.1 108.4 96 center lane, Station 42 +50 Roadway 3 Westbound Sandy Lake Road, 10' right of 6" 1 14.8 127.8 111.3 98 center lane, Station 41 +50 Test results on this report meet project specification. Technician: Julio Perez Started: 7:15am Finished: 9:45am t • �1 . A If Report Distribution: �, ' i �j l (1) City of Coppell ' rr (1) City of Coppell ' . Scott Watson, AET (1) Tiseo Paving Company Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. Page 1 of 1 REPORT OF LIME PULVERIZATION Client: City of Coppell Report No.: 260060 Project No.: 0611391 Date of Service 6/28/2006 Project: East Sandy Lake Road Page 2 of 2 Specifications: 100% passing 1 1/2" sieve 60% passing #4" sieve A B C D E Sample Weight Percent Weight Percent Weight Retained Passing Retained Passing 1 1/2" 1 1/2" Sieve #4 Sieve #4 Sieve Location Sieve 1 Sandy Lake Road, westbound lane, Station 64 +30 14.0 0 100 4.5 67.8 2 Sandy Lake Road, westbound lane, Station 61 +00 15.0 0 100 3.5 76.6 3 Sandy Lake Road, westbound lane, Station 58 +00 13.5 0 100 3.5 74.1 Additional Comments: LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed. and shall not be reproduced in full without written approval of Rone Engineering Services, Ltd.