Loading...
ST9301-LR060629 Engineering Rone 8908 Ambassador Row Dallas, Texas 75247 214.630.9745 FAX 214.630.9819 REPORT OF LIME PULVERIZATION Client: City of Coppell Report No.: 260155 Project No.: 0611391 Project: East Sandy Lake Road Date of Service 6/29/2006 ST 93 -01 Completion Page 2 of 2 Specifications: 100% passing 1 1/2" sieve 60% passing #4 sieve A B C D E Location Weight Percent Weight Percent Sample Retained Passing Retained Passing Weight 1 1/2" Sieve 1 1/2" Sieve #4 Sieve #4 Sieve Sandy Lake Road, eastbound Station 1 56 +50 13.5 0 100% 4.5 66.6% Sandy Lake Road, eastbound Station 2 53 +50 17.0 0 100% 5.5 73.5% Sandy Lake Road, eastbound Station 3 51 +00 17.5 0 100% 6.0 65.7% Sandy Lake Road, eastbound Station 4 48 +00 17.5 0 100% 5.0 71.4% Riverchase Drive, southbound, Station 5 1 +50 16.5 0 100% 1.5 90.9% 6 7 8 9 10 11 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, performance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd.