Loading...
ST9301-LR060517 ' n Engineering 8908 Ambassador Row, Dallas, TX 75247 4 221 Freidrich Lane, Ste 195, Austin, TX 78744 7701 W Little York, Ste 600, Houston, TX 77040 a Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 255749 Ms. Suzan Taylor Project No.: 0611391 PO Box 9478 Date of Service: 05/03/2006 Coppell TX 75019 Report Date: 05/17/2006 Project: East Sandy Lake Road .( ST 93 -01 Completion IN) * Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Gauge: Troxler 3430 Test Methods: M Density ASTM D - 2922 ty ASTM D - 3017 Gauge Serial No: 35518 Current: 744 Current: 2588 Test Mode: DT Previous: 739 Previous: 2571 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Reddish Brown Clayey Sand w /trace sandstone 14.0 113.0 Optimum +4 95 min FIELD DENSITY TESTS TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pct) (pcf) (% max) Fill 1 Sandy Lake Road, eastbound lane, Station 6" 1 14.5 126.8 110.7 98 27 +50, 3rd lift Fill 2 Sandy Lake Road, eastbound lane, Station 6" 1 14.4 126.9 110.9 98 27 +55, 4th lift Fill 3 Box culvert, west wing wall, inside, 1st lift 6" 1 15.6 125.3 108.4 96 Test results on this report meet project specification. g p p r4. Afi' �`� ' ,0 Technician: Joe Jernl an Started: 1:00 m Finished: 3:00 m Report Distribution: �` (1) City of Coppell (1) City of Coppell K. Scott Watson, AET (1) Tiseo Paving Company Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd 07TM Page 1 of 1 one Engineering 8908 Ambassador Row, Dallas, TX 75247 4221 Freidrich Lane, Ste 195, Austin, TX 78744 7701 W Little York, Ste 600, Houston, TX 77040 t, a Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 255789 Ms. Suzan Taylor Project No.: 0611391 PO Box 9478 Date of Service: 05/04/2006 Coppell TX 75019 Report Date: 05/17/2006 Project: East Sandy Lake Road ST 93 -01 Completion It 0 it Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Test Methods: Gauge: Troxler 3430 ASTM D - 2922 Moisture Density ASTM D -3017 Gauge Serial No: 36440 Current: 674 Current: 2844 Test Mode: DT Previous: 672 Previous: 2931 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Reddish Brown Clayey Sand w /trace sandstone 14.0 113.0 Optimum +4 95 min 1 ■ TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pct) (pct) (% max) Wing wall backfill 1 Sandy Lake Road, box culvert, east side, 6" 1 16.0 130.0 112.1 99 2nd lift Wing wall backfill 2 Sandy Lake Road, box culvert, west side, 6" 1 14.3 126.0 110.2 98 2nd lift Test results on this report meet project specification. ,, / Technician: Julio Perez Started: 9:OOam Finished: 11:OOa PO Report Distribution: �r j y , (1) City of Coppell /���� (1) City of Coppell K. Scott Watson, AET (1) Tiseo Paving Company Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 07TM Page 1 of 1 R one Engineering 8908 Ambassador Row, Dallas, TX 75247 v 4221 Freidrich Lane, Ste 195, Austin, TX 78744 7701 W Little York, Ste 600, Houston, TX 77040 . W Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 255809 Ms. Suzan Taylor Project No.: 0611391 PO Box 9478 Date of Service: 05/04/2006 Coppell TX 75019 Report Date: 05/17/2006 Project: East Sandy Lake Road G ,� ST 93 -01 Completion \ J (� Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Test Methods: Gauge: Troxler 3430 ASTM D -2922 Moisture Density ASTM D -3017 Gauge Serial No: 36440 Current: 674 Current: 2844 Test Mode: DT Previous: 672 Previous: 2931 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Reddish Brown Clayey Sand w /trace sandstone 14.0 113.0 Optimum +4 95 min FIELD DENSITY TESTS TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pct) (pct) (% max) Wing wall backfill 1 Box culvert, wing wall, Sandy Lake Road, 6" 1 14.6 125.1 109.2 97 east side, 3rd lift Wing wall backfill 2 Box culvert, wing wall, Sandy Lake Road, 6" 1 14.0 125.2 109.8 97 west side, 3rd lift Wing wall backfill 3 Box culvert, wing wall, Sandy Lake Road, 6" 1 15.2 125.7 109.1 97 east side, 4th lift Wing wall backfill 4 Box culvert, wing wall, Sandy Lake Road, 6" 1 15.0 126.2 109.7 97 west side, 4th lift Wing wall backfill 5 Box culvert, wing wall, Sandy Lake Road, 6" 1 14.4 126.1 110.2 98 east side, 5th lift LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 07TM Page 1 of 2 Report No.: 255809 MINNIE ____"`_ Project No.: 0611391 Client: City of Coppell TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pci) (pct) (% max) Wing wall backfill 6 Box culvert, wing wall, Sandy Lake Road, 6" 1 14.6 126.2 110.1 97 west side, 5th lift Test results on this report meet project specification. df ( if" Technician: Julio Perez Started: 12:30p Finished: 3:15pm r��l Report Distribution: /: (1) City of Coppell (1) City of Coppell K. Scott Watson, AET (1) Tiseo Paving Company Project Manager • LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 07TM Page 2 of 2 o ne Engineering (e) 8908 Ambassador Row, Dallas, TX 75247 4221 Freidrich Lane, Ste 195, Austin, TX 78744 7701 W Little York, Ste 600, Houston, TX 77040 Corporate Phone: (214) 630 -9745 REPORT OF IN -PLACE DENSITY CANCELLATION Client: City of Coppell Report No.: 255845 Ms. Suzan Taylor Project No.: 0611391 PO Box 9478 Date of Service: 05/05/2006 Coppell TX 75019 Report Date: 05/17/2006 Project: East Sandy Lake Road ST 93 -01 Completion (96ALP i� Services: In -Place Density Cancellation Report of Cancellation On this date a Rone Engineering Services, Ltd. representative arrived on site as scheduled. Upon arrival, our representative was informed that testing /inspection was cancelled for the day. 9 5A 2VVC51 o Technician Time: 6:45am — 8:15am Rone Engineering Technician: Julio Perez Report Distribution: (1) City of Coppell ( Q , (1) City of Coppell ' K. Scott Watson, AET (1) Tiseo Paving Company Project Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 99SS Page 1 of 1