Loading...
ST9301-LR060412 n q G Engineering e rr 8908 Ambassador Row, Dallas, TX 75247 3 2696 Gravel Drive, Fort Worth, TX 76118 a . 7701 W Little York, Ste 600, Houston, TX 77040 Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 254112 Ms. Suzan Taylor Project No.: 0611391 PO Box 9478 Date of Service: 04/07/2006 Coppell TX 75019 Report Date: 04/12/2006 Project: East Sandy Lake Road ST 93 -01 Completion * '?- Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Test Methods: Gauge: Troxler 3430 Moisture Density ASTM D -2922 ASTM D -3017 Gauge Serial No: NA Current: Current: 607 Test Mode: DT Previous: 606 Previous: 2380 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Reddish Brown Clayey Sand w /trace sandstone 14.0 113.0 Optimum +4 95 min FWFJ,D DENSITY TESTS TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pci) (pct) (% max) Roadway 1 Sandy Lake Road, 43' right of Station 6" 1 15.6 128.8 111.4 99 45 +94, elevation 44.00 Roadway 2 Sandy Lake Road, 43' right of Station 6" 1 15.7 129.7 112.1 99 45 +96, elevation 44.50 Roadway 3 Sandy Lake Road, 43' right of Station 6" 1 15.9 127.3 109.8 97 45 +98, elevation 45.00 Roadway 4 Sandy Lake Road, 43' right of Station 6" 1 16.4 128.4 110.3 98 46 +00, elevation 45.50 Roadway 5 Sandy Lake Road, 43' right of Station 6" 1 16.1 129.3 111.4 99 48 +94, elevation 44,00 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 07SS Page 1 of 2 . wu u - .....y.ncc..e. Report No.: 254112 IffilMlat Project No.: 0611391 Client: City of Coppell TEST PROBE MAD MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (lief) (pci) (% max) Roadway 6 Sandy Lake Road, 43' right of Station 6" 1 16.4 129.5 111.3 98 48 +96, elevation 44.50 Roadway 7 Sandy Lake Road, 43' right of Station 6" 1 16.1 129.7 111.7 99 48 +98, elevation 45.00 Roadway 8 Sandy Lake Road, 43' right of Station 6" 1 15.6 128.4 111.1 98 49 +00, elevation 45.50 Test results on this report meet project specification. A l Technician: Julio Perez Started: 12:OOp Finished: 4:OOpm ��� -. Report Distribution: refitit #0,,, (1) City of Coppell 4 (1) City ofcoppell . Scott Watson, AET (1) Tiseo Paving Company CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 07SS Page 2 of 2