Loading...
ST9301-LR060317 -,. Engineering �* 8408 Ambassador Row, Dallas, TX 75247 / / 2696 Gravel Drive, Fort Worth, TX 76118 7701 W Little York, Ste 600, Houston, TX 77040 Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 252656 Ms. Suzan Taylor Project No.: 0611391 PO Box 9478 Date of Service: 03/15/2006 Coppell TX 75019 Report Date: 03/17/2006 Project: East Sandy Lake Road ST 93 -01 Completion `W , Con Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Test Methods: ASTM D - 2922 Gauge: Troxler 3430 Moisture Density ASTM D -3017 Gauge Serial No: 33438 Current: 570 Current: 2556 Test Mode: DT Previous: 513 Previous: 2555 MOISTURE DENSITY RELATIONS Maximum Project Requirements M!D No. Description Moisture % Density pcf Moisture Density 1 Reddish Brown Clayey Sand w /trace sandstone 14.0 113.0 Optimum +5 95 min FIELD DENSITY TESTS TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pci) (pcf) (% max) Roadway 1 Approach at St. Joseph driveway and Sandy 6" 1 14.5 129.1 112.8 100 Lake Road, 1st lift Roadway 2 Approach at St. Joseph driveway and Sandy 6" 1 14.3 128.8 112.7 100 Lake Road, 2nd lift Roadway 3 Approach at St. Joseph driveway and Sandy 6" 1 14.6 125.5 109.5 97 Lake Road, 3rd lift Roadway 4 Median approach at University Academy 6" 1 15.4 127.6 110.6 98 and Sandy Lake Road, 1st lift Roadway 5 Median approach at University Academy 6" 1 14.2 127.2 111.4 99 and Sandy Lake Road, 2nd lift LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 07TM Page 1 of 2 x ! E 8908 Ambassador Row, Dallas, TX 75247 1 2696 Gravel Drive, Fort Worth, TX 76118 7701 W Little York, Ste 600, Houston, TX 77040 Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 252581 Ms. Suzan Taylor Project No.: 0611391 PO Box 9478 Coppell TX 75019 Date of Service: 03/14/2006 Report Date: 03/17/2006 Project: East Sandy Lake Road ` t �{ ST 93 -01 Completion ` Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Test Methods: ASTM D - 2922 Gauge: Troxler 3430 Moisture Density Gauge Serial No: 33438 ASTM D -3017 Current: 513 Current: 2555 Test Mode: DT Previous: 521 Previous: 2566 MOISTURE DENSITY RELATIONS Maximum Project Requirements MID No. Description Moisture % Density pcf Moisture Density 1 Reddish Brown Clayey Sand w /trace sandstone 14.0 113.0 Optimum +5 95 min FIELD DENSITY TESTS TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pcf) (pcf) (% max) Roadway 1 Approach on River Chase and Sandy Lake 6" 1 19.6* 133.2 111.4 99 Road, northbound lane, 1st lift Roadway 2 Approach on River Chase and Sandy Lake 6" 1 18.4 132.3 111.7 99 Road, southbound lane, 1st lift Roadway 3 Approach on River Chase and Sandy Lake 6" 1 20.9* 131.2 108.5 96 Road, northbound lane, 2nd lift Roadway 4 Approach on River Chase and Sandy Lake 6" 1 18.4 132.9 112.2 99 Road, southbound lane, 2nd lift Roadway 5 Approach on River Chase and Sandy Lake 6" 1 19.9* 133.9 111.7 99 Road, northbound lane, 3rd lift LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 07TM Page 1 of 2 Gt f. Report No.: 252581 �MEM Project No.: 0611391 Client: City of Coppell TEST PROBE MID MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pcf) (pct) (% max) Roadway 6 Approach on River Chase and Sandy Lake 6" 1 20.3* 133.1 110.6 98 Road, southbound lane, 3rd lift Roadway 7 Approach on Starleaf and Sandy Lake 6" 1 17.9 133.8 113.5 100 Road, 1st lift Roadway 8 Approach on Starleaf and Sandy Lake 6" 1 18.2 129.7 109.7 97 Road, 2nd lift Roadway 9 Approach on Starleaf and Sandy Lake 6" 1 16.5 127.0 109.0 96 Road, 3rd lift An asterisk ( *) appears next to test results which do NOT meet the project specifications. Note: Garreth Campbell, with the City of Coppell, approved the moisture % results. Technician: Julio Perez Started: 9:30am Finished: 6:00 pm Ro . . Report Distribution: ' J /j (I) City of Coppell (1) City of Coppell . cott Watson, AET (1) Tiseo Paving Company CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 07TM Page 2 of 2