Loading...
ST9301-LR060331 p. H w y i n [ �r i ny 8908 Ambassador Row, Dallas, TX 75247 r 1 Engine 2696 Gravel Drive, Fort Worth, TX 76118 7701 W Little York, Ste 600, Houston, TX 77040 Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 253279 Ms. Suzan Taylor Project No.: 0611391 PO Box 9478 Date of Service: 03/27/2006 Coppell TX 75019 Report Date: 03/31/2006 Project: East Sandy Lake Road ST 93 -01 Completion la) 4 on Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Test Methods: Gauge: Troxler 3430 Moisture Density ASTM D -2922 ASTM D -3017 Gauge Serial No: 33438 Current: 571 Current: 2541 Test Mode: DT Previous: 577 Previous: 2547 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Reddish Brown Clayey Sand w /trace sandstone 14.0 113.0 Optimum +4 95 min FIELD DENSITY TESTS TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pcf) (pci) (% max) Roadway 1 Sandy Lake Road, westbound, Station 6" 1 15.8 129.3 111.7 99 59 +00, 4th lift Roadway 2 Sandy Lake Road, westbound, Station 6" 1 14.5 129.3 112.9 100 62 +00, 4th lift Test results on this report meet project specification. Ae s, 4/ / Technician: Julio Perez ,,. Started: 11:30a Finishe 2:00pm �. . , Report Distribution: 1% (1) City of Coppell l (1) City of Coppell K. Scott Watson, AET (1) Tiseo Paving Company CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 07TM Page 1 of 1 r ! 1 Engineering 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort worth, TX 7611.8 7701 W Little York, Ste 600, Houston, TX 77040 Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 253197 Ms. Suzan Taylor Project No.: 0611391 PO Box 9478 Date of Service: 03/24/2006 Coppell TX 75019 Report Date: 03/31/2006 Project: East Sandy Lake Road ST 93 -01 Completion t1`t)4- (D (Q' Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Test Methods: Gauge: Troxler 3430 Moisture Density ASTM D -2922 h' ASTM D -3017 Gauge Serial No: 33438 Current: 577 Current: 2547 Test Mode: DT Previous: 570 Previous: 2546 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Reddish Brown Clayey Sand w /trace sandstone 14.0 113.0 Optimum +4 95 min 11 h TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pci) (pct) (% max) Roadway 1 Eastbound, Sandy Lake Road, Station 6" 1 15.2 127.9 111.0 98 59 +50, 2nd lift Roadway 2 Eastbound, Sandy Lake Road, Station 6" 1 16.2 127.7 109.9 97 62 +50, 2nd lift Roadway 3 Eastbound, Sandy Lake Road, Station 6" 1 15.7 128.4 111.0 98 60 +00, 3rd lift Roadway 4 Eastbound, Sandy Lake Road, Station 6" 1 15.4 128.6 111.4 99 63 +00, 3rd lift Test results on this report meet project specification. Technician: Julio Perez Started: p p 3:00 m Finished: 5:30 m ��"��•� ' 1 ' fir Report Distribution: rlii i (1) City of Coppell (1) City of Coppell K. Scott Watson, AET (1) Tiseo Paving Company CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 07TM Page 1 of 1 Rone 3908 Ambassador Row, Dallas, TX 75247 Engineering 2696 Gravel Drive, Fort Worth, TX 76118 7701 W Little York, Ste 600, Houston, TX 77040 Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 253128 Ms. Suzan Taylor Project No.: 0611391 PO Box 9478 Date of Service: 03/24/2006 Coppell TX 75019 Report Date: 03/31/2006 Project: East Sandy Lake Road ST 93-01 Completion � fey • Services: Perform In -Place Density Test in accordance with ASTM Standards. ton PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Gauge: Troxler 3430 Test Methods: M oisture Density ASTM D -2922 h' ASTM D -3017 Gauge Serial No: 33438 Current: 577 Current: 2547 Test Mode: DT Previous: 570 Previous: 2546 MOISTURE DENSITY RELATIONS Maximum Project Requirements 117JD No. Description Moisture % Density pcf Moisture Density 1 Reddish Brown Clayey Sand w /trace sandstone 14.0 113.0 Optimum +4 95 min FIELD DENSITY TESTS TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pcf) (pcf) (% max) Roadway 1 Sandy Lake Road, Station 59 +00, 1st lift 6" 1 15.8 130.6 112.8 100 Roadway 2 Sandy Lake Road, Station 63 +00, 1st lift 6" 1 16.0 131.1 113.0 100 Test results on this report meet project specification. 10 i `t, _ ie,'ng Technician: Julio Perez Started: 9:00am Finished: 10:45a i Report Distribution: v�, i (1 City of Coppell ' (1) City of Coppell K. Scott Watson, AET (1) Tiseo Paving Company CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 07TM Page 1 of 1