Loading...
ST9301-LR060404 R one e r 8908 Ambassador Row, Dallas, TX 75247 [ 2696 Gravel Drive, Fort Worth, TX 76118 7701 W Little York, Ste 600, Houston, TX 77040 €` ` Corporate Phone: (214) 630 -9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Report No.: 251958 Ms. Suzan Taylor Project No.: 0611391 PO Box 9478 Date of Service: 03/02/2006 Coppell TX 75019 Report Date: 04/04/2006 Project: East Sandy Lake Road /� ST 93 -01 Completion 00 Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company MIX DESIGN I.D.: 736 MEASURED SLUMP CONCRETE SUPPLIER: Redi Mix PLACEMENT DATE: 03/02/2006 (inches) PLANT: 1 WEATHER CONDITIONS: Clear 4.0 SPECIFICATION REQUIREMENTS TIME SAMPLED: 8:15am BATCH TIME: NA STRENGTH: 3600 psi @ 28 Days TEMPERATURE (F) - AIR 65 F CONCRETE: 70 F SLUMP (in): 4" maximum TRUCK NO: 1 1 1 TICKET NO: 163456 AIR ( %): NA AIR CONTENT ( %): 4.2 UNIT WEIGHT (pcf): NA TEST METHOD: ASTM C -172 OVERALL PLACEMENT LOCATION: ASTM C -31 except 9.1.2 Paving, stamped concrete, Stations 45 +00 and 45 +50, westbound side of Sandy Lake Road ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -1231 SAMPLE LOCATION: Station 45 +50 ASTM C -39 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (Ibs. force) (Psi) TYPE 1 1 03/09/2006 7 6.00 28.26 125630 4440 Unbonded Cap 1 2 03/30/2006 28 6.00 28.26 161430 5710 Unbonded Cap 1 3 03/30/2006 28 6.00 28.26 164240 5810 Unbonded Cap Average 5760 1 4 Hold Technician: Pat Parks Started: 7:30am Finished: 10:15am tb 04, g Report Distribution: P r (1) City of Coppell �Fll 0 (1) City of Coppell K. Scott Watson, AET (1) Tiseo Paving Company CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd OISS Page l of l Rone i n e ri 8908 Ambassador Row, Dallas, TX 75247 1 2696 Gravel Drive, Fort Worth, TX 76118 ° 7701 W Little York, Ste 600, Houston, TX 77040 Corporate Phone: (214) 630 -9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Report No.: 251871 Ms. Suzan Taylor Project No.: 0611391 PO Box 9478 Date of Service: 03/01/2006 Coppell TX 75019 Report Date: 04/04/2006 Project: East Sandy Lake Road ' O , (p` ST 93 -01 Completion Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company MIX DESIGN I.D.: NA MEASURED SLUMP CONCRETE SUPPLIER: Tiseo PLACEMENT DATE: 03/01/2006 (inches) PLANT: NA WEATHER CONDITIONS: Clear 4.0 SPECIFICATION REQUIREMENTS TIME SAMPLED: 11:3Oam BATCH TIME: NA STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F) - AIR 65 F CONCRETE: 75 F SLUMP (in): 3" - 5" TRUCK NO: 193 TICKET NO: NA AIR ( %): 4% - 6% AIR CONTENT ( %): 4.0 UNIT WEIGHT (pct): NA TEST METHOD: ASTM C -172 OVERALL PLACEMENT LOCATION: ASTM C -31 except 912 Paving, east Sandy Lake Road on westbound lane, Station 25 +00 to 45 +00 ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -1231 SAMPLE LOCATION: Station 35 +00 ASTM C -39 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE 1 1 03/08/2006 7 6.00 28.26 134350 4750 Unbonded Cap 1 2 03/29/2006 28 6.00 28.26 152520 5390 Unbonded Cap 1 3 03/29/2006 28 6.00 28.26 158140 5590 Unbonded Cap Average 5490 1 4 Hold . 4/ ar/ Technician: Jeremy Brimingham Started: 6:30am Finished: 1:OOpm W i%> ' _ In2, Ing Report Distribution: f�� . (1) City of Coppell / � 1 . (1) City of Coppell K. Scott Watson, AET (1) Tiseo Paving Company CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 01SS Page 1 of 1 8908 Ambassador Row, Dallas, TX 75247 Aone 2 696 Gravel Drive, Fort Worth, TX 76118 7701 W Little York, Ste 600, Houston, TX 77040 y Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 253576 Ms. Suzan Taylor Project No.: 0611391 PO Box 9478 Coppell TX 75019 Date of Service: 03/31/2006 Report Date: 04/04/2006 Project: East Sandy Lake Road i0 /„(O'' ST 93 -01 Completion 1UJ w ` Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Test Methods: ASTM D -2922 Gauge: Troxler 3430 Moisture Density ASTM D -3017 Gauge Serial No: 33438 Current: 564 Current: 2539 Test Mode: DT Previous: 572 Previous: 2553 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Reddish Brown Clayey Sand w /trace sandstone 14.0 113.0 Optimum +4 95 min FIELD DENSITY TESTS TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pcf) (pcf) (% max) Roadway 1 Sandy Lake Road, 45 right, elevation 446, 6" 1 17.9 128.7 109.2 97 Station 52 +00 Roadway 2 Sandy Lake Road, 40 right, elevation 447, 6" 1 16.2 130.1 112.0 99 Station 52 +02 Roadway 3 Sandy Lake Road, 43 right, elevation 448, 6" 1 17.0 129.8 110.9 98 Station 52 +04 Roadway 4 Sandy Lake Road, 45 right, elevation 446, 6" 1 17.7 128.6 109.3 97 Station 56 +00 Roadway 5 Sandy Lake Road, 43 right, elevation 447, 6" 1 17.3 128.7 109.7 97 Station 56 +02 Report No.: 253576 Project No.: 0611391 Client: City of Coppell TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pcf) (pcf) (% max) Roadway 6 Sandy Lake Road, 40 right, elevation 448, 6" 1 17.4 128.6 109.5 97 Station 56 +04 Test results on this report meet project specification. 4 Ali Technician: Julio Perez Started: 9:30am Finished: 1:30pm a PO". Report Distribution: , a (1) City of Coppell i� (1) City of Coppell K. Scott Watson, AET (1) Tiseo Paving Company CMT Operations Manager G p� Engineering 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 7701 W Little York, Ste 600, Houston, TX 77040 . Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 253421 Ms. Suzan Taylor Project No.: 0611391 PO Box 9478 Date of Service: 03/29/2006 Coppell TX 75019 Report Date: 04/04/2006 Project: East Sandy Lake Road ' 1 ST 93 -01 Completion 1I (0l Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Test Methods: Gauge: Troxler 3430 Moisture Density ASTM D -2922 ASTM D -3017 Gauge Serial No: 33438 Current: 579 Current: 2561 Test Mode: DT Previous: 574 Previous: 2556 MOISTURE DENSITY RELATIONS Maximum Project Requirements MID No. Description Moisture % Density pcf Moisture Density 1 Reddish Brown Clayey Sand w /trace sandstone 14.0 113.0 Optimum +4 95 min FIELD DENSITY TESTS TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pcf) (pct) (% max) Roadway '�j ' �1Mti�' 1 Sandy Lake Road, ound, Station 6" 1 14.5 125.2 109.3 97 ad y t �1 lift Roadway �� ^-V w (, Roadw a UV�C� 2 Sandy Lake Road, 361st u d, Station 6" 1 14.0 125.1 109.7 97 53 +00, 1st lift Test results on this report meet project specification. Technician: Julio Perez Started: 7:15am Finished: 9:OOam / of Report Distribution: �f /�i PP (1) City ofCo ell , i ( 1 ) City of Coppell K. Scott Watson, AET (1) Tiseo Paving Company CMT Operations Manager LIMITATIONS The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 07TM Page 1 of 1 q K !. Engineering 8908 Ambassador Row, Dallas, TX 75247 1 2696 Gravel Drive, Fort Worth, TX 76118 7701 W Little York, Ste 600, Houston, TX 77040 - Corporate Phone: (214) 630 -9745 CONCRETE COMPRESSIVE STRENGTH TEST Client: City of Coppell Report No.: 251804 Ms. Suzan Taylor Project No.: 0611391 PO Box 9478 Coppell TX 75019 Date of Service: 02/28/2006 Report Date: 04/04/2006 Project: East Sandy Lake Road ► ` rWZ ST 93 -01 Completion Services: Obtain samples of fresh concrete at the placement locations, perform required field testing, cast compressive strength samples and bring samples back to the laboratory for curing and testing in accordance with applicable standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company MIX DESIGN I.D.: 2446 CS MEASURED SLUMP CONCRETE SUPPLIER: Tiseo Paving Company PLACEMENT DATE: 02/28/2006 (inches) PLANT: WEATHER CONDITIONS: Clear /warm 1.75 SPECIFICATION REQUIREMENTS TIME SAMPLED: 3:OSpm BATCH TIME: 2:29pm STRENGTH: 4000 psi @ 28 Days TEMPERATURE (F) - AIR 78 F CONCRETE: 78 F SLUMP (in): 3" - 5" TRUCK NO: 163 TICKET NO: AIR ( %): 2% - 5% AIR CONTENT ( %): 9.0 UNIT WEIGHT (pcf): NA TEST METHOD: ASTM C -172 OVERALL PLACEMENT LOCATION: ASTM C -31 except 9.12 Inside lane, westbound, Sandy Lake Road, Station 42 +50 to 43 +50 ASTM C -143 ASTM C -231 ASTM C -1064 ASTM C -1231 SAMPLE LOCATION: Station 43 +00 ASTM C -39 REPORT OF TESTS Concrete Compressive Cylinder 6" x 12" CYLINDER MAXIMUM COMPRESSIVE MARKED DATE AGE DIAMETER AREA LOAD STRENGTH FRACTURE SET NO. TESTED (days) (inches) (sq.in.) (lbs. force) (psi) TYPE 1 1 03/07/2006 7 6.00 28.26 122460 4330 Unbonded Cap 1 2 03/28/2006 28 6.00 28.26 148710 5260 Unbonded Cap 1 3 03/28/2006 28 6.00 28.26 139010 4920 Unbonded Cap Average 5090 1 4 Hold / , / Technician: Randy Nudge Started: 1:15pm Finished: 4:OOpm 1`�!4. i' gl ' ' i g Report Distribution: Pat" ft (1) City of Coppell L'.! (1) City of Coppell K. Scott Watson, AET (1) Tiseo Paving Company CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. )1 Page 1 of 1