Loading...
ST9301-LR060214 r Engineering 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 u 7701 W Little York, Ste 600, Houston, TX 77040 ,, Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 250780 Ms. Suzan Taylor Project No.: 059909 PO Box 9478 Date of Service: 02/09/2006 Coppell TX 75019 Report Date: 02/14/2006 Project: East Sandy Lake Road ST 93 -01 0 4- ol' Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Test Methods: ASTM D -2922 Gauge: Troxler 3430 Moisture Density ASTM D -3017 Gau Serial No: 33438 Current: 573 Current: 2552 Test Mode: DT Previous: 577 Previous: 2594 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Reddish Brown Silty Sand w/ Sandstone & Gravel 11.0 98.0 Optimum +4 98 min FIELD DENSITY TESTS TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pcf) (pcf) (% max) Wall backfill 1 Sandy Lake Road, Station 44 +50, 45' left, 6" 1 15.0 112.6 97.9 100 elevation 438 Wall backfill 2 Sandy Lake Road, Station 44 +50, 44' left, 6" 1 12.0 108.5 96.9 99 elevation 439 Wall backfill 3 Sandy Lake Road, Station 44 +50, 44' left, 6" 1 13.1 110.0 97.3 99 elevation 440 Wall backfill 4 Sandy Lake Road, Station 44' left, elevation 6" 1 12.4 108.9 96.9 99 439 Wall backfill 5 Sandy Lake Road, Station 44 +60, 45' left, 6" 1 11.1 108.0 97.2 99 elevation 440 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd 17TM Page 1 of 2 Report No.: 250780 11111111111111 t MOM= Project No.: 059909 Client: City of Coppell Test results on this report meet project specification. All i Technician: Julio Perez Started: $ :OOam Finished: 5:00pm ftli i i / g Report Distribution: ' +� (1) City of Coppell • - (1) City of Coppell K. Scott Watson, AET (1) Tiseo Paving CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. D7TM Page 2 of 2