Loading...
ST9301-LR060215 ?�, � �rr`„ 8908 Ambassador Row, Dallas, TX 75247 € ' 1 ! i 2696 Gravel Drive, Fort Worth, TX 76118 t ... 7701 W Little York, Ste 600, Houston, TX 77040 'it"; ) ggi Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 250680 Ms. Suzan Taylor Project No.: 0611391 PO Box 9478 Date of Service: 02/08/2006 Coppell TX 75019 Report Date: 02/15/2006 Project: East Sandy Lake Road ST 93 -01 Completion (4) ' IO Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Test Methods: Gauge: Troxler 3430 Moisture Density ASTM D - 2922 ASTM D -3017 Gauge Serial No: 33438 Current: 577 Current: NA Test Mode: DT Previous: 577 Previous: 2579 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Reddish Brown Clayey Sand w /trace sandstone 14.0 113.0 Optimum +4 95 min 2 Reddish Brown Silty Sand w/ Sandstone & Gravel 11.0 98.0 Optimum +4 98 min FIELD DENSITY TESTS TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pct) (pcf) (% max) Wall backfill 1 Sandy Lake Road, Station 31 +00, 45' left, 6" 1 14.0 122.4 107.4 95 elevation 449 Wall backfill 2 Sandy Lake Road, Station 30 +90, 44' left, 6" 1 14.0 124.1 108.9 96 elevation 450 Wall backfill 3 Sandy Lake Road, Station 44 +10, 45' left, 6" 2 14.0 109.3 95.9 98 elevation 490.5 Wall backfill 4 Sandy Lake Road, Station 44 +15, 43' left, 6" 2 13.5 110.1 97.0 99 elevation 441 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 07TM Page 1 of 2 Report No.: 250680 Project No.: 0611391 Client: City of Coppell TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pci) (pcf) (% max) Wall backfill 5 Sandy Lake Road, Station 44 +20, 41' left, 6" 2 14.3 110.3 96.5 98 elevation 441.5 Wall backfill 6 Sandy Lake Road, Station 44 +25, 44' left, 6" 2 14.5 109.8 95.9 98 elevation 442 Test results on this report meet project specification. . / 1 ► e, /411 Technician: Julio Perez Started: 7:30am Finished: 6:30pm Report Distribution: tirigrAle / (1) City of Coppell J — A (1) City of Coppell . Scott Watson, AET (1) Tiseo Paving Company CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 07TM Page 2 of 2 :' . e Engineering 8908 Ambassador Row, Dallas, TX 75247 2696 Gravel Drive, Fort Worth, TX 76118 7701 W Little York, Ste 600, Houston, TX 77040 '1. - Corporate Phone: (214) 630 -9745 IN -PLACE DENSITY TESTING Client: City of Coppell Report No.: 250580 Ms. Suzan Taylor PO Box 9478 Project No.: 059909 Coppell TX 75019 Date of Service: 02/07/2006 Report Date: 02/15/2006 Project: East Sandy Lake Road (OZ ST 93 -01 Services: Perform In -Place Density Test in accordance with ASTM Standards. PROJECT DATA CONTRACTOR: Tiseo Paving Company Standard Counts Test Methods: Gauge: Troxler 3430 ASTM D -2922 Moisture Density ASTM D - 3017 Gau Serial No: 33438 Current: 577 Current: 2579 Test Mode: DT Previous: 577 Previous: 2545 MOISTURE DENSITY RELATIONS Maximum Project Requirements M/D No. Description Moisture % Density pcf Moisture Density 1 Reddish Brown Silty Sand w/ Sandstone & Gravel 11.0 98.0 Optimum +4 98 min FIELD DENSITY TESTS TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pcf) (pcf) (% max) Wall backfill 1 Sandy Lake Road, Station 30 +80, 45' left, 6" 1 12.6 108.2 96.1 98 elevation 446 Wall backfill 2 Sandy Lake Road, Station 30 +85, 43' left, 6" 1 12.6 107.8 95.7 98 elevation 446.5 Wall backfill 3 Sandy Lake Road, Station 30 +80, 44' left, 6" 1 11.1 108.7 97.8 100 elevation 447 Wall backfill 4 Sandy Lake Road, Station 30 +95, 42' left, 6" 1 12.9 108.4 96.0 98 elevation 447.5 Wall backfill 5 Sandy Lake Road, Station 31 +00, 40' left, 6" 1 11.8 108.7 97.2 99 elevation 448 LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 07TM Page 1 of 2 Report No.: 250580 AMINE IL, '" " ""'_ Project No.: 059909 Client: City of Coppell TEST PROBE M/D MOISTURE WET DENSITY DRY DENSITY DENSITY NO TEST LOCATION DEPTH No. ( %) (pct) (pcf) (% max) Wall backfill 6 Sandy Lake Road, Station 31 +05, 43' left, 6" 1 11.4 108.7 97.6 100 elevation 448.5 Test results on this report meet project specification. Technician: Julio Perez Started: 7:15am Finished: 6:15pm ` eri Report Distribution. t � �� (1) City of Coppell A .■ _ (1) City ofCoppell K. Scott Watson, AET (1) Tiseo Paving CMT Operations Manager LIMITATIONS: The test results presented herein were prepared based upon the specific samples provided for testing. We assume no responsibility for variation in quality (composition, appearance, etc.) or any other feature of similar subject matter provided by persons or conditions over which we have no control. Our letters and reports are for the exclusive use of the clients to whom they are addressed and shall not be reproduced except in full without the written approval of Rone Engineering Services, Ltd. 07TM Page 2 of 2