Loading...
ST9301-CN041105 BID PROPOSAL ADDENDA NO. 1 ADDENDUM NO: ONE ISSUE DATE: Nov. 5, 2004 PROJECT NAME: SANDY LAKE ROAD BID DATE: Nov. 16, 2004 (from Kimbel Kourt to east City Limits) ST 93 -01 Bid No. Q 1004 -01 LOCATION: COPPELL, TEXAS ISSUED BY: City of Coppell On November 2, 2004 a Pre -bid meeting was held. Numerous items were discussed during the meeting. However, only those items addressed by this addendum will be considered as changes to the project. 1. This addendum modifies and extends the requirements of the plans and construction specifications for the above referenced project. 2. Staple these addenda to the inside of the rear cover of the construction specifications or bind it into the construction specifications at the end of the Bid Proposal. 3. Note receipt of all addenda on the Bid Form located in the Bidding Documents, and also on the outside cover of the envelope containing the Bid Documents. CONSTRUCTION SPECIFICATIONS Item No. 1 Pages 5 -3 & 5 -4 The following sentence should be added to the end of the paragraph for Pay Items #2 & 7: "Any asphalt removed under Pay Item #2, that is utilized under Pay Item #7 for borrow or embankment, shall be pulverized so that no portion of the asphalt is larger than a 4" diameter. Any asphalt desired to be utilized for the borrow embankment, shall also only be used in the lower sections of the embankment at locations approved by the Engineer. The pulverized asphalt shall be thoroughly mixed with the earth embankment. Material imported for use in the embankment • •-. -v. - :. tible with the existing embankment material and should have a PI range betw: en 8 and 20.' Item No. 2 Pages 5 -4 & 5 -5 The following sentence should be added to the end of the first paragraph for Pay Item #8: "Material secured from the site and meeting NCTCOG Specification Item #3.8 ,Topsoil, may be used for this item. It will be the contractor's responsibility to find a suitable site for stockpiling such material." Item No. 3 Page 5 - 8 & 5 - 9 The following change should be made in the fourth line of the first paragraph for Pay Items #17, 20, & 25: Delete: All concrete for construction shall be Class `A' I/ Add: "All concrete for construction shall be Class `C' The following sentence should be added at the end of the first paragraph: "Particular attention should be paid to how the proposed culverts will temporarily tie into the existing culverts during construction." Item No. 4 Page 5 - 13 The following sentences should be added to the end of the first paragraph under Pay Item # 58: "This pay item shall also include the placement and removal of all required work zone pavement markings. Pay Items #74, 75, 76, & 82 are considered subsidiary to this pay item." Item No. 5 Page 5 - 13 The following sentences should be added to the end of the first paragraph for Pay Item #59: "The 1 1/4" asphalt overlay over the existing asphalt, as shown in Section A -A on Sheet 6 of 94 of the Construction Plans, is considered subsidiary to this pay item. The 1 %2" overlay shall also be maintained in a safe driveable condition at all times during construction. Actual measurement for pay will begin at the outside edge of the existing asphalt." Item No. 6 Page 5 - 14 The following clarification addresses Pay Items #60, 61, & 62: "In order to mitigate the effect of striking the end of a temporary traffic barrier, the end shall be installed in accordance with AASHTO's "Roadside Design Guide" (see Section 1A.11) by flaring until the end is outside the acceptable clear zone or by providing crashworthy end treatments." Item No. 7 Page 5 - 17 & 5 - 18 The following sentence should be added to the end of the first paragraph for Pay Items #74, 75, 76, & 82: "These pay items are considered subsidiary to Pay Item #58 and no separate payment will be made for these pay items." The last paragraph in Pay Items #74, 75, 76, & 82 that begins with "This is a `plans quantity' measurement item ... ." should be eliminated in its entirety. Item No. 8 Page 5 - 21 The following sentence should be added to the end of the first paragraph for Pay Item #104: "Because of changing soil conditions, a site specific geotechnical evaluation will be required to verify that the pier sizing and locations shown on Sheet S -1 is adequate for the proposed entry sign. Geotechnical evaluation will be paid for by the Contractor. Also, conduit fore should be provided to the site." e LZ Item No. 9 Pages 1 - 33, 1 - 34 & 1 - 35 The unit price for Pay Items I -74, I -75, I -76, & I -82 shall be "N /A ". Also, the total price for those four bid items should state "subsidiary to Pay Item #58 ". Item No. 10 Page 2 - 5 Delete: 8.5. Part 1: General Provisions of the Standard Specifications for Public Works Construction, NCTCOG, latest edition. Add: 8.5. Part 1: General Provisions of the Standard Specifications for Public Works Construction - North Central Texas Third Addition. Item No. 11 Page 3 - 3 & 3 - 4 Special Conditions The following sentence should be added to the end of the first paragraph of 1.20.5: "Any loss of existing landscaping, due to damage to an existing irrigation system, shall be replaced at the sole cost of the contractor. This requirement is made to insure that any damaged irrigation systems are repaired as expeditiously as possible so that the surrounding landscaping can continue to thrive." Item No. 12 Page 3 -9 CONSTRUCTION METHODS The last sentence in 5.8.2 (1) Expansion Joints: Delete: "Expansion joints shall be equally spaced between intersections with not less than one every 200 linear feet of pavement, unless otherwise specified on the Plans or directed by the Engineer." Add: "Expansion joints shall be equally spaced between intersections with not less than one every 500 linear feet of pavement, unless otherwise specified on the Plans or directed by the Engineer." Item No. 13 All stormdrain embedment on this project shall be Class B +, as defined in the Standard Specifications for Public Works Construction - North Central Texas Third Addition, as prepared by the North Central Texas Council of Governments. Item No. 14 The traffic control plan shows constructing one -half of what is referred to as driveways #3,5, 7, and 9. Please be advised that those four driveways will still need to be wide enough to provide adequate access to the adjacent property. This may require the addition of temporary asphalt adjacent to the driveway to provide adequate access. It will be the contractor's responsibility to work directly with the adjacent property owners during those driveway reconstructions. There will be no separate pay item for any additional asphalt required. It will be considered subsidiary to Pay Item I -63. Item No. 15 Batch plant locations should comply with any requirements from the TECQ. In addition to those requirements, any batch plants proposed to be used for greater than 90 -days requires a Special Use Permit from the City of Coppell. Item No. 16 The existing brick sign at approximately Sta. 57 +50 will need to be removed with the dirt work associated with this project. Payment shall be subsidiary to Bid Item #1. Item No. 17 Any conflicts between the plans and specifications will be decided in favor of the specifications on this project. BID PROPOSAL ADDENDA NO. 2 ADDENDUM NO: TWO ISSUE DATE: Nov. 12, 2004 PROJECT NAME: SANDY LAKE ROAD BID DATE: Nov. 16, 2004 (from Kimbel Kourt to east City Limits) ST 93 -01 Bid No. Q 1004 -01 LOCATION: COPPELL, TEXAS ISSUED BY: City of Coppell On November 2, 2004 a Pre -bid meeting was held. Subsequent to the pre -bid meeting, the City of Coppell has received several inquiries concerning the referenced project. Listed below for your review are the questions and our responses. Those items addressed by this addendum will be considered as changes to the project. 1. This addendum modifies and extends the requirements of the plans and construction specifications for the above referenced project. 2. Staple these addenda to the inside of the rear cover of the construction specifications or bind it into the construction specifications at the end of the Bid Proposal. 3. Note receipt of all addenda on the Bid Form located in the Bidding Documents, and also on the outside cover of the envelope containing the Bid Documents. CONSTRUCTION SPECIFICATIONS 1. Can office space be used in the vacant retail center at the southeast corner of Sandy Lake Rd. and MacArthur Blvd. in lieu of a job trailer? • Acceptable, but doubtful. The owner is an out of state owner and has been hard to deal with. If permission is obtained, all utilities would need to be provided and a guarantee that it would be available for the duration of the project. 2. Item #88 Finishing and placing stamped concrete is paid by the square yard. The specifications state that payment shall be made on the basis of price bid per SY of stamped concrete of thickness specified. • All stamped concrete in streets will be 8 ". All stamped concrete in the medians and driveways will be 6 ". The stamped concrete shown on the ramps is a separate bid item. Our calculations indicate about 1,375 SY of 6" stamped concrete and 1,008 SY of 8" stamped concrete. These quantities will be lumped together and bid at one price. 3. Will the successful bidder be allowed to use a cofferdam or sheet piling for dewatering? • You must meet the requirements of you own SWPPP plan, TCEQ requirements and the requirements of Nationwide Permit 14, which is included in the specifications. If you propose to place a cofferdam upstream of the construction, that could be constructed of raw dirt, provided that the upstream cofferdam is removed prior to removal of the downstream facility. The use of unstabilized or uncontained raw dirt downstream will not be permitted. The Contractor will be required to adhere to any agreements, mitigation plans and standard best management practices required for the NWP14. If the Contractor makes changes in the project construction method that would result in changes of project impacts to waters of the U.S., the Contractor will be responsible for any new Section 404 permit. 4. Plan Sheet 55 of 94, note #3 references TxDOT standard drawing PC -5 for reinforcing and joint details. • Note #3 on Sheet 55 of 94, should reference TxDOT 11C -10 -23 dated December 2003. 5. There have been several inquiries concerning the sequencing of the multiple box culverts. • The City will consider any sequencing of the construction of the box culverts that meets the safety standards, traffic control standards, SWPPP standards, TCEQ standards, Nationwide Permit 14 requirements, and the integrity of the box culvert or the roadway design is not compromised. Any sequencing must also maintain two lanes of traffic. 6. Delete: Item Quantity Unit Description and Price in Words Unit Total No. Price Price I -79 424 EA Raised Pavement Marker P -15 W Complete in Place • Add: Item Quantity Unit Description and Price in Words Unit Total No. Price Price I -79 677 EA Raised Pavement Marker P -15 W Complete in Place 7. Delete: Item Quantity Unit Description and Price in Words Unit Total No. Price Price I -80 424 1 EA Raised Pavement Marker P -7 W Complete in Place • Add: Item Quantity Unit Description and Price in Words Unit Total No. Price Price I -80 376 EA Raised Pavement Marker P -7 W Complete in Place 8. Delete: Item Quantity Unit Description and Price in Words Unit Total No. Price Price 1 -81 480 EA 4" Round, White Acrylic, Double Reflective Traffic Buttons P 117Y Complete in Place • Add: Item Quantity Unit Description and Price in Words Unit Total No. Price Price 1 -81 131 EA 4" Round, White Acrylic, Double Reflective (Clear & Red) Traffic Buttons Complete in Place