Loading...
Sales Tax 10C-CS110502 Page 1 of 3 George Marshall - RE: Schedule for Belt Line Road Pavement Investigation From:   George Marshall To:   Doug Ziolkowski Date:   5/2/2011 11:45 AM Subject:   RE: Schedule for Belt Line Road Pavement Investigation   http://www.txdot.gov/insdtdot/orgchart/cmd/cserve/standard/toc.htm   >>> "Doug Ziolkowski" <DZiolkowski@gmeconsult.com> 5/2/2011 11:18 AM >>> George: Do you have a copy of TxDOT detail TCP 1-4a. I am not familiar with this since we don't often drill in roads. Doug! From: George Marshall [mailto:gmarshall@coppelltx.gov] Sent: Monday, May 02, 2011 11:18 AM To: Doug Ziolkowski Cc: Per Birdsall Subject: Re: Schedule for Belt Line Road Pavement Investigation Doug,   Thank You for the schedule.  We will make sure the arrow board is available for use.  As called for in the contract, you will be providing the temporary traffic control.  I would like to point to the TxDOT detail TCP 1-4a to be used as a guide.  Belt Line road is posted at 45 MPH.  For file purposes, I would like to have you fill out a permit & attach your TCP. (See attached).  Please ignore the fee.  This form was developed for franchise utilities. What time tomorrow were you thinking about meeting? I have a 9:30 meeting that will last till 12 or so.  I would like for Per to be at this meeting if available.   Thank You, George   George Marshall, PE City of Coppell Engineering 972-304-3562 >>> "Doug Ziolkowski" <DZiolkowski@gmeconsult.com> 5/2/2011 10:03 AM >>> Good morning George: I was able to get a lot of work caught up last week and should now be able to devote the proper energy to the Belt Line Road pavement investigation. As you requested, I have determined a preliminary schedule of work that GME will perform:   Proposed Work Schedule:   Item No.      Work Activity                                                    Duration of Work                                            Proposed Work Dates   file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4DBE994BCity_...6/17/2011 Page 2 of 3 1)                Determine Boring Locations on Plans                    2 hours                                                       May 2, 2011   2)                Meet with City of Coppell (George)                    to approve boring locations                                   2 hours                                                       May 3, 2011   3)                Mark boring locations on Belt Line Road                6 hours                                                       May 4, 2011   4)                Call Digtess for Utility locates and markings          2 Working Days                                           May 4 through May 6, 2011   5)                Core Pavement and Drill Test Borings                   3 Working Days (or less)                              May 10 through May 12, 2011   6)                Assign Lab Tests and Perform Lab Testing            10 Working Days (or less)                            May 13 through May 26,2011   7)                Anaylyze Data and Prepare Report                       10 Working Days (or less)                            May 27  through June 10, 2011   The schedule of work described above is in accordance with our project schedule as outlined in our proposal P11.04.0030 dated March 3, 2011.   I have the drilling subcontractors notifed of the schedule and they are checking to be sure it works with them. We will need to have the traffic board signs available during the time period proposed.     Please review the schedule and provide any comments.   Thanks Doug!   Douglas P. Ziolkowski, P.E. President   GME Consulting Services, Inc. 2530 Electronic Lane, Suite 710 Dallas, Texas   Phone: 214-351-5633 Fax: 214-351-5680   __________ Information from ESET NOD32 Antivirus, version of virus signature database 6088 (20110502) __________ The message was checked by ESET NOD32 Antivirus. http://www.eset.com __________ Information from ESET NOD32 Antivirus, version of virus signature database 6088 (20110502) __________ file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4DBE994BCity_...6/17/2011 Page 3 of 3 The message was checked by ESET NOD32 Antivirus. http://www.eset.com __________ Information from ESET NOD32 Antivirus, version of virus signature database 6088 (20110502) __________ The message was checked by ESET NOD32 Antivirus. http://www.eset.com file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4DBE994BCity_...6/17/2011