Loading...
SW0405-CS050408 i i6 E'FE I :L A. S - , 6 April 8, 2005 Jim Evans Quantum Contracting, Inc. P.O. Box 430 Rockwall, TX 75087 -0430 Re: Sidewalk Replacement Program FY 2004/05 Dear Mr. Evans: Enclosed is the Sidewalk/Curb list and location map for the 2004/05 repair program. As has been discussed with Rick O'Dell, I understand that you will be starting repairs in mid -April. Please contact Rick when you are ready to begin work. • The first Priority 1 project is Allen Rd. at MacArthur Blvd. This location needs to be done first. • The Priority 5's are to be done only if funds, from the budgeted $100,000 for FY 2004/05, are available. Should you have any questions or need any additional information please feel free to contact me at 972/304 -3686 or Rick O'Dell at 972/304 -7090. Sincerely, Paula Crocker Administrative Support Engineering Department cc: Rick O'Dell, Construction Inspector COPPELL 1 1 i9g 255 PARKWAY * P . O . B O X 9478 * COPPELL T X 7 5 0 1 9 * TEL 972/462 0 0 2 2 * FAX 972/304 3 6 7 3 Date 3/7/05 Sidewalk and Curb Repair List for FY 2004/05 Budget (By Priority, Address, Date) Approx Size Priority Date Address Misc. SF 1 12/1/2004 Allen Rd.at MacArthur Install new sidewalk to park 1328 1 10/21/2004 Bethel School E. 500 -504 Sinking at drive approaches 180 1 8/23/2004 Clear Creek 414 Sinking/broken 212 1 9/1/2004 Glendale 148 Sinking 256 1 11/8/2004 Glenwood 140 Sinking 198 1 4/16/2004 Greenridge 431 Sinking/broken 352 1 4/6/2004 Halifax 452 Sinking/broken 144 1 10/14/2004 Halifax 516 Sinking 272 1 10/26/2004 Hartford Cir. 130 Sinking at mailbox area 176 1 6/29/2004 Heatherglen 140 Sinking 91 1 5/10/2004 Lee 579 Sinking 260 1 10/26/2004 MacArthur(btw Cove- Laguna) Sinking 120 1 10/21/2004 Meadowglen Cir. 216 Sinking (temp. ramp installed) 116 1 6/16/2004 Meadowglen Cir. 842 Sinking 2 areas 140 1 8/31/2004 Meadowood 344 Sinking /broken 136 1 4/9/2004 Parkway 437 Sinking (temp. ramp 4/12/04) 77 1 4/23/2004 Parkway E. 584 Sinking /broken 224 1 3/30/2004 Pinyon 230 Sinking/broken 95 1 10/13/2003 Raven 661 Sinking (temp. ramp 10/13/03) 64 1 7/9/2004 Redcedar Way 955 Sinking /broken 288 1 2/24/2004 Sandy Knoll 474 Sinking /broken 80 1 11/11/2004 Shadowcrest 413 Sinking 164 1 9/2/2003 Shorewood 845 Sinking *date wrong appeared on list 6/2004 20 1 4/12/2004 Tara Ct. 203 Sinking/broken 312 1 7/14/2004 Thompson 681 Sinking /manhole (temp.ramps 2) 320 1 7/29/2004 Villawood 729 Sinking /toe stubs 3 panels 64 1 9/22/2004 Windham Cir. 153 Sinking 140 2 6/10/2004 Barclay 283 Sinking 176 2 3/18/2004 Bethel School 603 Sinking 80 2 10/27/2004 Cardinal 709 Sinking 360 2 9/21/2004 Cozby 512 Sinking /broken 160 2 9/23/2004 Denton Tap S. 465 Sinking 140 2 6/22/2004 Dove Circle Sinking at drive approaches 136 2 3/16/2004 Edgewood 231 Sinking /cracked around meter can 152 2 9/1/2004 Harrison 608 Sinking 132 2 8/18/2004 Heartz 343 Sinking w /toe stubs 288 2 8/24/2004 Heartz S. 339 Sinking 384 2 7/30/2004 Highland Meadow 200 Sinking 100 2 9/23/2004 Highland Meadow Cir. 136 Sinking /broken 112 2 3/15/2004 Lodge 284 Sinking /broken 40 2 4/21/2004 Meadowood 325 Sinking 292 1- Top Priority 2 - Medium Priority 3 - Low Priority 4 - Inspector added 5 - Only if funds available 1 Date 3/7/05 Sidewalk and Curb Repair List for FY 2004/05 Budget (By Priority, Address, Date) Approx Size 2 3/30/2004 Oriole 714 Sinking (next to mailbox) 232 2 9/9/2003 Parkway 201 -251 Sinking (next to manhole) 25 2 6/17/2004 Phillips 453 Sinking 184 2 4/8/2004 Sandy Knoll 437 Sinking (temp. ramp 4/9/04) 100 2 2/24/2004 Sandy Knoll 469 Sinking/broken 244 2 8/5/2004 Sparrow 740 -744 Sinking 364 2 9/13/2004 Windham Cir. 134 Sinking 68 3 6/15/2004 Cardinal 764 Sinking 64 3 3/25/2004 Carolina Ct. 221 Sinking /cracked 220 3 7/1/2004 Eagle 736 Flaking 164 3 3/25/2004 Glenwood 220 Sinking 284 3 10/28/2004 Havencrest 6 Sinking /toe stubs 112 3 4/12/2004 Lake Forest 517 Sinking 108 3 10/27/2004 Mullrany 843 Sinking /cracking 52 3 10/22/2004 Newport 131 Sinking north of address 300 3 8/5/2004 Plantation 213 Sinking b y fire hydrant 180 3 3/25/2004 Richmond Ct. 211 Sinking 64 3 2/24/2004 Sandy Knoll 477 Sinking /broken 72 Sidewalk Total in SF 11218 x $5.20 = $58,333.60 Curbs LF C/1 7/9/2004 Beltline /Hackberry Curb lines(N & S medians replace) 12 C/1 3/8/2004 Pinyon 261 Curb broken 10 C/1 3/12/2001 Willow Springs 236 Curb 7 Curb Total in LF 29 x $30.00 = $870.00 Total $59,203.60 1 - Top Priority 2 - Medium Priority 3 - Low Priority 4 - Inspector added 5 - Only if funds available 2 Date 3/7/05 Sidewalk and Curb Repair List for FY 2004/05 Budget (By Priority, Address, Date) Approx Size 4 Inspector Added Sidewalks: 4 Mapleleaf 906 332 4 Mapleleaf 946 76 4 Mapleleaf @ Pinon 432 4 Mapleleaf 1004 164 4 Mapleleaf 1008 196 4 Mapleleaf 1040 228 4 Mapleleaf 1036 196 4 Mapleleaf 1001 120 4 Mapleleaf @ Creekside 204 4 Newport 131 (also listed as #3 priority) 208 4 Newport 136 56 4 Newport 144 108 4 Newport 143 84 4 Parkway 361 424 4 Parkway E. 417 40 4 Parkway E. 433 -437 344 4 Parkway E. 471 344 4 Parkway E. 483 252 4 Parkway E. 479 36 4 Parkway E. 549 184 4 Parkway E. 561 188 4 Parkway E. 628 244 4 Parkway E. 620 -616 447 4 Parkway E. 608 144 4 Parkway E. 500 /w of Phillips 98 4 Parkway E. 580 84 4 Woodhurst PI 336 284 4 Samuel e side /so of Greenway 20 # 4 Sidewalk Total in SF 5537 x $5.20 = $28,792 C/2 Inspector added Curbs: C/2 MacArthur westside so. of Cribbs 10 C/2 MacArthur westside so of Simmons /North of Church 24 Curb Total in LF 34 x $30.00 = $1,020 1 - Top Priority 2 - Medium Priority 3 - Low Priority 4 - Inspector added 5 - Only if funds available 3 Date 3/7/05 Sidewalk and Curb Repair List for FY 2004/05 Budget (Bs Priority, Address, Date) Approx Size Inspector Added Totals $29,812 5 Repair if Funds Available 5 Simmons 100 68 5 Simmons 144 188 5 Simmons 153 160 5 Simmons 152 40 5 Simmons 161 180 5 Simmons 165 116 5 Simmons 169 84 5 Simmons 229 112 5 Simmons 232 80 5 Simmons 228 92 5 Simmons 237 220 5 Simmons 233 52 5 Simmons 249 172 5 Simmons 248 144 5 Simmons 252 120 5 Simmons 257 36 5 Simmons 256 68 #5 Sidewalk Total in SF 1932 x $5.20 = $10,046.00 1 - Top Priority 2 - Medium Priority 3 - Low Priority 4 - Inspector added 5 - Only if funds available 4