ST9904-CS 990202 (2)
February 2, 1999
Mr. David Hensley, P.E.
TxDOT
2624 W. Prairie
Denton, TX 76201
RE: S.H. 121 at Corporate Drive/Coppell Road
Dear Mr. Hensley:
This letter is written as a follow-up to our previous meeting concerning the entrance ramp to S.H.
121 in the general vicinity of Corporate Drive and Coppell Road. The engineering consultant for
the GTE site has provided a modified ramp access drawing showing a future ramp north of
Corporate Drive. You may recall that the current plan for a ramp in the area is south of Corporate
Drive. During our discussion, it was noted that it is important for the vehicles exiting the site to
have the opportunity to enter onto northbound S.H. 121 in the future once the highway takes on
freeway status. The driving force for this submittal at this time is the overriding need for the GTE
site to have driveway access to the current frontage road. With the submittal of this plan, I am
requesting that TxDOT expeditiously review the modified ramp location and make a determination
on the purposed location of the driveways to service the GTE site.
I will be contacting you in a few days to arrange a time when Gillett Berger, with Beck Realty
Group, Jim Riley, with Brockett, Davis and Drake and myself can meet with you concerning this
proposal.
If you should have any questions please feel free to contact me at your convenience.
Sincerely,
Kenneth M. Griffin, P.E.
Director of Engineering/Public Works