ST9904-CS 970313
March 13, 1997
Claude P. Elsom III P.E., Area Engineer
TxDOT
2624 W. Prairie
Denton, TX 76201
RE: S.H. 121 Bypass
Dear Mr. Elsom:
This letter is in reference to a conversation with Chris Behnke regarding Street Cut Permits along the
S.H. 121 Bypass between Denton Tap Road and MacArthur Blvd. I explained to Mr. Behnke that
there is a proposed residential development in the City of Coppell that will have streets intersecting the
eastbound frontage road in the City of Lewisville (see attached preliminary plats). I asked Mr. Behnke
if it would be possible for the City of Coppell to submit the Street Cut Permits to TxDOT even though
the streets will be intersecting in the City of Lewisville. He stated that he did not think it would be a
problem but that the City of Lewisville will need to be kept informed of all street intersections in their
City.
Enclosed are two copies of preliminary plats for the Vistas of Coppell Phases 2A, 2B & 2C. On the
plats three streets, which intersect Vista Ridge Blvd./eastbound frontage road of S.H. 121 Bypass, have
been circled and labeled as A, B, & C.
As of this date, the engineering firm, Carter-Burgess has received a Street Cut Permit for intersection B
(Crestwood Drive/Vista Ridge Blvd.). In this submittal, Carter-Burgess is requesting a Street Cut
Permit for intersection A (Bella Vista Dr./Vista Ridge Blvd). I have provided construction plans and
traffic control plans as requested by TxDOT. It is expected that a Street Cut Permit will be requested
for intersection C (Lydse Dr./Vista Ridge Blvd.) when construction plans are completed.
If you should have any questions or comments please contact me at (972)304-3679.
Sincerely
Michael A. Martin, P.E.
Assistant City Engineer