Loading...
Northlake WE P1-6-CS031124 November 24, 2003 David Vilbig Vilbig & Associates, Inc. 10132 Monroe Drive Dallas, TX 75229 RE: 775 Pelican Drive Construction Plan Review Comments Dear Mr. Vilbig: The City of Coppell has reviewed the revised plans for the referenced addition and with the following conditions, the plans will be approved. 1.Existing trees must not be damaged or disturbed during or after construction. Please contact John Elias, Parks Operations Manager, at 972-462-5115 to inspect proposed pipe location and to provide a letter of approval for the construction. 2.The applicant must sign an original copy of the Floodplain Development Permit that is available in our office. Please submit revised copies for the City Engineer’s stamp. The City of Coppell requires three sets for its use; your office should submit as many additional sets as necessary for construction operations. All contractors and subcontractors onsite must have a copy of the plans approved by the City of Coppell. All fees must be paid prior to release of this project for construction. These fees consist of construction inspection fees to be paid to this office. The City assesses a 4% inspection fee for all public installations along with a copy of the itemized bid documents. If you have any questions or need any additional information, please contact this office at your convenience. Sincerely, Teresa Turner Graduate Engineer Office Phone: (972) 304-3681 Fax: (972) 304-3570 CC: Brian Dingler, Applicant John Elias, Parks Operations Manager