Vistas of C P1-CS040203
PRESS RELEASE
DATE: February 3, 2004
CONTACT: Ken Griffin, P.E.
Director of Engineering/Public Works
FOUR-WAY STOP SIGNS INSTALLED
The intersection of Waterview Drive and Lyndsie Drive will
change from a two-way stop to a four-way stop controlled
intersection the week of February 9, 2004. According to Ken
Griffin, Director of Engineering and Public Works, the
intersection “met the requirements for a four-way stop to be
installed”.
Anyone having any questions concerning the installation of the
signs may call the Engineering Department at 972/304-3679.
###