Mr. Samaniego,
I spoke to you before the curb construction crew started work at my drive way and voiced my concerns
about the possibility of damaging my cobblestone drive way. It is now apparent as well as during the
process that they damaged (broke) several bricks. The bricks were on the drive way for about a week
before the driveway was reconstructed on one side. They were not put back together in the correct
pattern, the damaged bricks were replaced with bricks that do not match the rest of them, and there are
also several unnecessary gaps between bricks now. I appreciate that you completed both sides of my
driveway instead of just one as originally planned. However, I am not happy overall with the
reconstruction of my driveway that was damaged in the process. I have attached a few pictures of the
driveway before the project began for your review. Please take a look and you will see the difference
between then and now. You can see the driveway in person or I can take some current pictures for your
comparison. Just let me know what works better for you. Please let me know how we can resolve this
issue at your earliest convenience. Thank you.
--
Andrew Harris
Logistics Manager
Direct line: 972-280-0843
Main line: 972-241-1071
Fax: 972-241-0073
Cell: 817-691-0410
aharris@ctaerospace.com
file://C:\Documents and Settings\radloo\Local Settings\Temp\XPgrpwise\4DF8B99CCity_o...7/5/2011