Loading...
MA1006-CS110706 T H E • C 1 T Y O F COPPELL 4, C;; 40 "' : s J 9 July 6, 2011 Adrian Bowman Jim Bowman Construction Co. 2716 S. Rigsbee Dr. Plano TX 75074 RE: Belt Line / Denton Tap Brick Paver Replacement Project #MA 10 -06 Final Walk -thru Dear Mr. Bowman: Please be advised that a walk - through has been scheduled for Monday, July 11 at 10:00 a.m. for the paving improvements for the referenced project. Please ensure that all facilities are clean and accessible at that time and that contractor's representatives are present to assist with the inspection. We also request that your water truck be on hand during the inspection. Your cooperation in this effort is greatly appreciated. If you have any questions, please call 972- 304 -7090 at your earliest convenience. Sincerely, gjA * vier_ Rick O'Dell Construction Inspector Office Phone: (972) 304 -7090 Fax: (972) 304 -3570 cc: George Marshall, P.E., Civil Engineer Ken Griffin, P.E., Dir. of Engineering & Public Works Glenn Hollowell, P.E., Asst. Dir. of Public Works Utility Department Streets Department A FAMILY COMMUNITY FOR A LIFETIME 255 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * WWW.COPPELLTX.GOV