MA1006-CS110601
(7/8/2011) George Marshall - Re: Video DetectionPage 1
From:
Per Birdsall
To:
johnny@melselectric.com
CC:
George Marshall, adrian@bowmanconstruction.com
Date:
6/1/2011 4:41 PM
Subject:
Re: Video Detection
That is what I just recently checked with the Engineer on. It's good. Thanks, Per
-----Original Message-----
From: Johnny Heine <johnny@melselectric.com>
Cc: Adrian Bowman <adrian@bowmanconstruction.com>
To: Per Birdsall <PBIRDSALL@coppelltx.gov>
Sent: 6/1/2011 3:16:57 PM
Subject: RE: Video Detection
We have schedule Paradigm for next Monday at 9:00 am to switch over to
the temp signals. Is this date and time ok?
From: Per Birdsall [mailto:pbirdsall@coppelltx.gov]
Sent: Thursday, May 26, 2011 3:58 PM
To: Johnny Heine
Cc: Brent Adams; Larry Morton
Subject: Video Detection
We have two cameras and the associated components (borrowing one
component from Southwestern). I'll need to check further if all the
hardware is present for mounting. We also have several old Opticom heads
that I believe are operational which can be verified next week. We
should still have some span wire mounts for the Opticom. More
information next week on the minor hardware issues. Thanks, Per
(7/8/2011) George Marshall - Re: Video & LoopsPage 1
From:
Per Birdsall
To:
khiggins@paradigmtraffic.com
CC:
George Marshall, Brent Adams, Cody Wildoner
Date:
6/1/2011 4:35 PM
Subject:
Re: Video & Loops
Thanks. That is the way I thought it should work. I heard from Mel's about Monday. You should prime your
tech that this is what will need to be done. All the video equipment will be there and the initial programming
of the Naztec controller with the new phase sequence will be ready. I'll have a tech there too if anything
else is needed. Thanks again. Per
-----Original Message-----
From: "Keith Higgins" <KHiggins@paradigmtraffic.com>
To: Per Birdsall <PBIRDSALL@coppelltx.gov>
Sent: 6/1/2011 4:08:29 PM
Subject: RE: Video & Loops
Not a problem Per,
There are 16 logic ground/true inputs on the front of the tap. They are
pins 1 -16
The outputs of the loops can be run from the detector panel into the
input pins. Then in the detector file the inputs can be tied with logic
to the TS2 output pins and the inputs can be passed through the sdlc bus
to the controller... is that what you have in mind.
By the way, Johnny with Mel's scheduled for one of my guys to be at this
Monday...
Thanks,
Keith Higgins
Field Service Manager
Paradigm Traffic Systems
817-247-6023
________________________________
From: Per Birdsall [mailto:pbirdsall@coppelltx.gov]
Sent: Wednesday, June 01, 2011 12:52 PM
To: Keith Higgins
Subject: Video & Loops
(7/8/2011) George Marshall - Re: Video & LoopsPage 2
Hate to keep asking but I'll have a situation come Monday if not.
According to literature there are 16 TS1 inputs on the front of the TAP.
If I understood it, the pins would be 16 thru 32. The output from the
detector rack would need to be routed to one of these inputs? I need a
little more step by step. Has this been done anywhere else?
Thanks, Per
Per Birdsall, Traffic Control / Streets Operations Manager
City of Coppell
816 S. Coppell Rd.
P.O. Box 9478
Coppell, Texas 75019
972-462-5150
972-462-5199 fax
pbirdsall@coppelltx.gov