MA1006-CS110713
MEMORANDUM
FROM THE
DEPARTMENT OF PUBLIC WORKS
To: Rick O’Dell, Construction Inspector Engineering
From: Frank Garza, Streets Department
Date: July 13, 2011
RE: Walk-thru Paver Replacement Project Denton Tap/Beltline
1. Need to seal joints on curb on northwest corner, west median, southwest corner,
south median and northeast corner.
2. Need to rout and seal cracks on south median on left lane. Marked with green
paint.
3. Need to rout and seal crack on northwest corner on right lane. Marked with green
paint.
4. Need to seal redwood on sidewalks.
5. Need to repair marking around walk path that is damaged.
6. Need to seal curb on median across entrance on Chevron on Beltline.
CITY OF COPPELL PUBLIC WORKS DEPARTMENT