Loading...
Rolling Oaks MC-CS110715 T H E C 1 T Y O F cor'mi 9 el A 8 1 8 July 15, 2011 Larry Frazier The Fain Group PO Box 750 Fort Worth TX 76101 RE: Notification of Repairs Needed / Maintenance Bond Rolling Oaks Memorial Center Dear Mr. Frazier: An inspection of the referenced project has been conducted by representatives of the City of Coppell prior to the expiration of the two -year Maintenance Bond. The following items need to be resolved prior to September 10, 2011: 1. There is excessive pavement cracking in the parking lot at the funeral home. 2. Pavement cracking is occurring and pieces of broken concrete need to be repaired in the pavilion area. Please contact me at 972 - 304 -7090 to inform me of when your company will be on the project to correct the deficiencies. Sincerely, A)(CC"/ta Rick O'Dell Construction Inspector cc: Ken Griffin, P.E., Director of Engineering & Public Works Keith Marvin, P.E., Project Engineer Glenn Hollowell, P.E., Asst. Director of Public Works Brad Reid, Director of Parks & Recreation A FAMILY COMMUNITY FOR A LIFETIME 255 PARKWAY * P.O. BOX 9478 * COPPELL TX 75019 * TEL 972/462 0022 * WWW.COPPELLTX.GOV