ST9304-CS 860708
CITY-DEVELOPER AGREEMENT
THIS AGREEMENT is entered into as of the ~'7';~day of 1986,
by the City of Coppell, Dallas County, Texas ("City") a'nd
Venture ("Develope~").
The following recitals form the basis for and are part of this Agreement:
A. Developer is the owner and developer of a project known as
Riverchase, A Master Planned Community in Coppell, Texas ("Riverchase").
B. Developer has agreed, as outlined in t~ z~in~I~'~dl'~n~~ for
Riverchase, tq pay all the expense for traffic signalization (as described in
~£xh. lblt A ) and to pay ~ 1/2~J~)~,~ .e~n~e of permanent improvements (as
~[..~eScribed in Exhibit "B") to the lntersectl~r~ of MacArthur Boulevard and Belt
~ne Road, in the Ct'tY of Coppell. If WOrk is to begin at this time, other
additional improvements will be necessary (including fill, temporary storm
-sewer, temporary pavement transitions to the east, west and south of the
intersection, etc.). The above described items are collectively referred to
" rk" -
herein as the ~ The Work is fully described lnplaas an~specifi¢~ttons~
prepared by Nathan D. Maier Consulting Engineers, Inc. an~d SighaltZatt°h~
specifications attached.
C. After considering possible relocation of Belt Line Road, City has
notified Dallas County that it is the present desire of the City that Belt
Line Road be improved within its preSent~.and in reliance upon
such notice and the actions of Dallas CoUntF,~~has ~'reedt° Procee~
with the ~rk.
D. City and Developer agree that if the NoFK is done at this time (prior
to reconstruction of Belt Line Road)~ tt ulti~te)Y wlll~ chea~¢~and: saree
to rebuild Belt Line Road and will lessen interference caUsed by traffiE
diversion.
NOW THEREFORE, in consideration of the mutual promises in this Agreement
and the mutual benefits to be obtained from the Work, the adequacy of which is
~eFeby acknowledged, City and Developer agree as follows:
Q~,'~ 1. DeVet~er to Cause Completion 9fF t~~k;, Notwithstanding
Developer's' 66libation to pay only for t'raf~ic"S'~'g'nalization and l~2Of th~
c~st o~ the permanent Intersection, Developer at its expense agrees ~o cause:
awarding of a contract for all of the Work to a contractor reasonably
acceptable to the Cityl the issuance of a work order to commence all of the
Work; and completion of all of the Work. Developer shall provide~City wtth~a"
executed copy of its contract and such other documentation as is reasonably
requested by City. Developer shall be responsible for all contract
administration and construction management. Developer shall use reasonable
efforts to cause the Work to proceed as quickly as practicable. Developer and
its contractor are hereby given a temporary construction easement over all
public right-of-ways reasonably necessary for conducting the Work and City
agrees to execute such further instruments as may be reasonably necessary and
shall otherwise reasonably cooperate to effect completion of the Work.
7/07/8U --1--
OlqiF
2. Requirements of Contractor. Developer shal!~.require the contractor
to furnish a performance bond and a payl~e~t?l~bh~ complying with the
requirements of the McGregor Act. The bonds shall be in favor of Developer
and City, it being agreed that City has an interest in the performance and
payment of the Work. Developer shall require the contractor to carry
comprehensive general liability insurance with limits of at least $500,000 and
with City and Developer named as insureds. Upon request, Developer shall
obtain and furnish cert~flicates evidencing such insurance coverage.
3. City to Accept the Work. City will at its expense periodically
inspect the ~ork. Upon completion as per City specifications, City shall
promptly obtain a certificate of completion from its engineers and issue its
md assume ownership of the Work. Developer shall
deliver good tttle ~ork free of liens and encumbrances.
4. Developer to Assist in Brld~ AlJor~!. Improvements to Belt Line
Road will require con'strb~tion of a new bridge where Belt Line Road crosses
the Trinity River (near the intersection of MacArthur Boulevard. and Belt Line
Road). City and Developer agree that the construction of a shorter bridge
than is now planned (and approved by the Army Corps of Engineers) would
benefit City by reducing its costs for the improvement of Belt Line Road.
Developer, at its sxPense, agrees to retain Nathan D. Maier Consulting
Engineers, Inc. to Provide-~he City with reasonable consulting and assistance
in obtaining approval for the new design from the ArmyCorpslo6£nJllneers.
5. Pavi~, .i)(~&t)~. The southern boundary of Riverchase is adjacent to
a strip of rai"ir'ja~'Yi"ght-of-way that is adjacent to Belt Line Road in its
existing location (i.e. the railroad right-of-way is situated between
Riverchase and Belt Line Road). Developer agrees to donate to City a sum
equal to the prorata share of the City's pavtn§a, sseSs~n)for improvements to
Belt Line Road computed as if the southern bOUnd~¢Y '~f property owned by
Developer within Riverchase was actually adjacent to Belt Line Road.
Developer's first installments on the donation shall be (a) the sums expended
4 by Developer as per Paragraph 4, and (bi the sums expended by Developer in
.~'~ connection with the WOrk that exC'eed Developer's prior commitments (i.e. sums
.~P~ in excess of the cost of traffic signalization and 1/2 of the cost of the
~/['~permanent imtersection). T~ ba!tm~.~eli m~he donat)~i shall be p~id when
~/:;~' assessment~Lare due from, ot~i~~ for improvement of Belt L~ne Roao.
Developer's u~na{}o'n 'snail De suo3ec~ ~o~tne provisions set out below.
' 6. Agreements if Belt Line Road
Riverchase describes certain agreements bY opeK ,
landscaping and other improvements associated with Belt Line Road in its
",xexisting location. City (acting through its mayor and council) has recently
Xadopted a reSO)iu~ii~!]i:~iwhich in effect states that to the extent the City
Council of Coppell has authority to determine whether Belt Line Road should be
relocated, it is the determination of the council that Belt Line Road ~should
not be relocated. However, it is understo~,and agreed that the City is fte~:,i
to change its position on the relOc&ti~.t~s~:~
7/07/86 --2--
OIqlF
Shoutcl Ci~.~. take ~_ny action (prior to reconstruction of Belt Line in its
present l°cat~) to change its position on the reloc~lJ;~ of~. Be:it kirt~ R~o~dI
and as a result thereof such relocation Shall oCCU~hOUi"d C'lty'take ahY
action that causes Belt Line Road not to be reconst'i~cted in its present
location, the following provisions shall apply:
(a) City shall upon demand reimburse Developer for all sums expended by
Developer for or associated with the WOrk and ali ~Sums expended by Developer
as per Paragraph 4. Developer's expenditures for the work w~ll be made in
reliance upon City's promise to reimburse Developer as set forth ~n this
paragraph 6(a).
(b) Developer shall not be required to make any of the improvements
related to Belt L~ne Road required by the zoning ordinance; and
(c) Developer's agreement here~n to make donations for Belt L~ne Road
shall be null and void.
(d) It is anticipated that the C~ty's promise to reimburse Developer as
set forth in Paragraph (a) above may be satisfied out of current or reserve
revenues or other sources of funds. If City does not fulfill its promise to
reimburse Developer as set for~ ~g~,~h~ Developer shall be entitled
to recover a money Judgment such reimbursement and with
a court order requiring the City to incorPc cost of reimbursement ~nto
a budget and requiring City levy a tax sufficient to pay for the reimbursement.
7. General. This Agreement shall be binding on and inure to the benefit
of the parties hereto, their successors and assigns, provided, however that no
assignment shall be effective until approved by the rema}ning party, which
approval shall not be unreasonably withheld. This Agreement ~s not made for
the benefit of any contractor, the public or any other third party, and no
third party shall have any rights under th~s Agreement. Any notice given
under this Agreement shall be delivered to the following address unless
written change of address is received.
City of Coppell
P. O. Box 478
Coppell, Texas 75019
Riverchase Joint Venture
5420 LBO Freeway
Two Lincoln Centre, Suite 1370
Dallas, Texas 75240
ATTN: 3ay Patterson
Executed as of the date first above written.
Attest'
7/07/8b
-3-
O191F
RIVERCHASE JOINT VENTURE
By: Terra Land Development Co.,
Venture Mana/~
~J ay~a~/te 6 son , PreSident
The Coppell City Attorney has approved the form of Agreement and represents to
Developer that this Agreement is a valid and binding obligation of City,
enforceable in accordance with its terms. /~ ~_. )
Coppel 1 ,/City A~orney
7/0778~ --4--
olgtF
ITEM
NO.
4
5
6
8
9
10
11
12
13
14
15
16
17
18
City-Developer Agreement
EXHIBIT "A"
BELT LINE ROAD AT MACARTHUR BOULEVARD
TRAFFIC SIGNALIZATION
ESTIMATED
QUANTITY
ll
654
500
8
1
50
13,500
1,600
975
3,800
12
1
UNITS
EA
EA
EA
EA
EA
EA
EA
LF
LF
EA
EA
LF
LF
LF
LF
LF
EA
LS
DESCRIPTION
5-Section Signal Head ~-12 Inch
Lenses, Back Plate, and Astro
Mounting Brackets
3-Section Signal Head ~-12 Inch
Lenses, Back Plate and Astro
Mounting Brackets
8 Phase, Full Actuated Nema
Controller with Railroad Pre
Emptor and Internal Time Based
Coordination Complete in Cabinet
45 Foot Mast Arm Pole
25 Foot Mast Arm Pole
Mast Arm Pole Foundation Anchor
Bolts
Controller Cabinet Foundation
Complete with Anchor Bolts, Ground
Rod, and Brass Ground Clamp
2 Inch Underground Conduit (PVC)
3 Inch Underground Conduit (PVC)
Pull Box
Service Pole Complete with Service
Meter and A.C. Power Hook Up
3C # 8 Power Cable
2 Conductor 14-Gauge Signal Cable
3 Conductor 14-Gauge Signal Cable
5 Conductor 14-Gauge Signal Cable
Loop Detector Saw Cut
Loop Detector Amplifiers
Mobilization
PROJECT DESCRIPTION:
ITEM
NO. QUANTITY
1 13,218
2 5,568
3 2,240
4 420
5 5,360
6 450
7 1,302
8 4.80
9 3.32
l0 2
ll 32
12 2,350
13 170.00
City-Developer Agreement
EXHIBIT "B"
NATHAN D. MAIER
CONSULTING ENGINEERS, INC.
MacArthur-Belt Line Intersection
DATE: 6-9-86
PREPARED BY: BH
UNIT
SF
SF
SY
LF
CY
LF
LF
CY
CY
EA
Tons
SY
LF
DESCRIPTION
Permanent Intersection
Intersection Pavers
Paver Bands
8" Reinforced Conc.
6" Integral Curb
Compacted Fill
24" R.C.P. Culverts
30" R.C.P. Culverts
Mult. Hdwl. for 30" R.C.P.
Mult. Hdwl. for 24" R.C.P.
Remove Mult. Hdwl. for 30" R.C.P.
Hydrated Lime
Lime Stabilization
Concrete Street Header
E R R A
July 8, 1986
City of Coppell
616 South Coppell Road
Coppell, Texas 75019
Attention: Mayor & Members of City Council
Re:
Proposed Agreement for Construction of Intersection of Belt
Line and MacArthur and Availability of Fill Material
Dear Mayor & Members of the City Council:
Enclosed please find copies of the latest revised version of the
proposed agreement between the City of Coppell and the Riverchase
Joint Venture concerning construction of the Belt Line Road/
MacArthur Boulevard intersection. The revisions are marked on
said copies. As you can see, Larry Jackson, who will be unable
to attend your council meeting toniqht, has indicated his
approval of the form. We are sorry to deliver this to you so
late but we have just been able to get the lawyers to agree on
the language this morning.
Also enclosed please find copies of a letter to the City from the
owner of B and M Sand and Gravel Co. confirming the availability
of fill material at the prices indicated. The fill material
described in Mr. Myre's letter is located just east of the
Coppell section of Belt Line Road that is scheduled to be
improved.
We hope the enclosed are satisfactory to you.
if you have any questions. Thank you.
Please let us know
Sincerely,
RIVERCHASE JOINT VENTURE
By Terra Land Devel~o~ment Co.
~- JaRl Pat/tenson, President
JP/sm
Enc.
cc: Mr. Frank Proctor, City Manager
TERRA COMPANIES
TWO LINCOLN CENTRE
SUI"C ~370
54?0 1BJ r ~E,FWA'~
DAL!,%$, ~EXAS 7524;~
214 V91 94,14