Loading...
WA1005-CS110708 (2) (7/20/2011) George Marshall - Re: Projects completed since 2004 - 7-8-11.pdfPage 1 From: Jessica Brown <JLB@freese.com> To: George Marshall <gmarshall@coppelltx.gov> CC: Ken Griffin <KGRIFFIN@coppelltx.gov>, Jessica Vassar <jbv@freese.com> Date: 7/8/2011 9:51 AM Subject: Re: Projects completed since 2004 - 7-8-11.pdf Thank you! Jessica Brown, P.E. Freese and Nichols, Inc. (817) 735-7406 On Jul 8, 2011, at 9:44 AM, "George Marshall" <gmarshall@coppelltx.gov<mailto:gmarshall@coppelltx.gov>> wrote: Jessica B, Attached is the updated projects list that has been completed since 2004. If you have any questions please contact me. Thank You, George George Marshall, PE City of Coppell Engineering 972-304-3562 Please consider the environment before printing this message. <Projects completed since 2004 - 7-8-11.pdf> ________________________________ This electronic mail message is intended exclusively for the individual or entity to which it is addressed. This message, together with any attachment, may contain the sender's organization's confidential and privileged information. The recipient is hereby notified to treat the information as confidential and privileged and to not disclose or use the information except as authorized by sender's organization. Any unauthorized review, printing, retention, copying, disclosure, distribution, retransmission, dissemination or other use of, or taking of any action in reliance upon, this information by persons or entities other than the intended recipient is prohibited. If you received this message in error, please immediately contact the sender by reply email and delete all copies of the material from any computer. Thank you for your cooperation. Paving Projects Completed Since 2004 Project #Project NameTypeAprox. SYEng. CompanyEngineering CostContractorConstruction CostLast Pay App Bethel School Rd 2/3/2005ST02-02(East of Denton Tap)7" Conc3836CityTiseo$302,042.2011/19/2004 W. Sandy Lake (N. 11/1/2005ST99-02Coppell to City Limit)8" Conc35705TNP$897,644.40Tiseo$3,800,263.338/1/2007 MacArthur Blvd Widening (Bethel 4/24/2006ST97-03School to Belt Line)8" Conc2374CityJRJ$325,393.651/31/2006 E. Sandy Lake (Kimbel to City Limit) 10/10/2008ST93-01(Dallas County)8" Conc30070Tiseo$4,721,918.221/8/2008 Bethel Rd (Freeport to City Limit)Trans Systems 7/31/2009ST99-059" Conc44449Tiseo$7,280,320.904/30/2009 Coppell Rd (Sandy Lake to Cooper)Huitt-Zollars 10/7/2009ST00-038" Conc15933Tiseo$2,449,493.486/19/2009 S. Coppell Rd (Bethel Freese & to Southwestern)Nichols 7/12/2010ST07-028" Conc10977JRJ$1,396,658.428/4/2010 Southwestern Blvd (S. Coppell to Denton Tap)Halff 8/1/2010ST07-018" Conc5505Lacy$1,204,348.9111/18/2010 Bethel Rd IIA (Denton Freese & Tap to Penfolds)Nichols 2/25/2011ST03-01A8" Conc7406JRJ$1,997,084.513/23/2011 NAST01-02Ruby Rd7" Conc10349Pacheco KochTiseo$84,649.336/30/2004 Total $897,644.40$23,562,172.95 1 of 3 Sewer Projects Completed Since 2004 Project #Project NameTypeAprox. LFEng. CompanyEngineering CostContractorConstruction CostLast Pay App TCB SS99-01$535,574.40 Force Main Lines 'A' & 'B' 12/16/2004 Texas CMT 20" DI4324$5,268.00SJ Louis$1,172,750.0010/20/2004 24" PVC115 30" DI808 Force Main Line 'D'TeraMar 7/15/2005$3,944.75MasTec$2,312,040.958/1/2005 30" HDPE8799 Deforest Lift StationTexas CMT 5/4/2007NANA$13,632.15Canfer Const$2,611,741.669/8/2006 Coppell Rd/ Service Center SS 6/2/2005SS02-01 18" DI122Rone$2,238.50Fox Contracting$199,536.0010/12/2004 18" PVC1753 Bethel Rd (Freeport 7/31/09 RDST99-05to City Limit)8" PVC647CityTiseo Paving$110,470.004/30/2009 Bethel Rd (D.Tap to Freese & 2/25/11 RDST03-01APenfolds)12" PVC135NicholsJRJ$96,563.853/23/2011 & City Coppell Rd (Bethel to Freese & 7/12/2010ST07-02Southwestern)8" PVC450NicholsJRJ$38,346.008/4/2010 Coppell Rd (Sandy 10/7/2009ST00-03Lake to Copper)10" PVC425Huitt-ZollarsTiseo$35,621.256/19/2009 Total $560,657.80$6,577,069.71 2 of 3 Water Projects Completed Since 2004 Project #Project NameUnitAprox. LFEng CompanyEngineering CostContractorConstruction CostLast Pay App CDBG - Golden Triangle 6/26/04 SLWA00-02Pacheco Koch$16,816.24North Texas Contr$175,547.0012/2/2004 ?County?6" PVC31 8" PVC966 SH 121 Water Line 12/20/05 RDWA01-01Birkhoff Hendric$65,964.09Fox Contracting$615,108.8111/30/2005 6" DI30 6" PVC48 8" PVC71 12" PVC8707 Loch Lane Water Line 9/22/05 RDWA03-01Fox Contracting$58,652.001/17/2005 6" PVC20 8" PVC562 Denton Tap Rd 16" Water Line 6/29/06 RDWA97-0116" DI128Birkhoff Hendric$63,879.56JT Desner$804,707.508/21/2006 6" PVC333 8" PVC530 10" PVC17 12" PVC109 16" PVC3900 Meadowcreek / Rolling Hills Water Line 5/8/06 RDWA99-016" PVC285CitySite Concrete$350,263.655/26/2004 8" PVC5299 1/7/10 SLWA06-01Hunterwood Water Line8" PVC492CityJim Bowman$44,180.007/28/2009 Southwestern Aug 2010 RDST07-0112" PVC1205HalffLacy$108,306.3311/18/2010 Bethel Rd (Freeport to City Limits) (Creekview WL) 7/31/09 RDST99-0516" PVC1075Trans SystemsTiseo Paving$410,168.354/30/2009 S. Coppell Rd (Bethel to Southwestern) 7/12/10 RDST 07-0212" PVC365Freese & NicholsJRJ$78,632.258/4/2010 Added 8" Water down Mitchell Coppell Rd (Sandy Lake to Cooper) 10/7/09 RDST00-0312" PVC3750Huitt-ZollarsTiseo$344,161.656/19/2009 Total$146,659.89$2,989,727.54 3 of 3