Loading...
ST9902-CN110712X% P TE4+GUE NALL AND PERKINS Civil Engineering Surveying Landscape Architecture Planning CITY OF COPPELL Consulting Engineer's Contract Modification to the Scope of Services 1. Scope of Work TNP shall provide professional civil engineering services, as outlined below, for completing the preparation of design plans for the Vilest Sandy Lake Road reconstruction project. This modification is for additional services associated with the existing contract. For the portion of roadway between North Coppell Road and South Coppell Road (also referred to as Phase 2A), the construction plans will no longer need to accommodate TxDOT design standards, and shall be revised to meet the City of Coppell design standards. Previous and ongoing work being done under this existing contract will be utilized to the fullest extent possible, including agreed upon preliminary horizontal and vertical designs, meeting decisions, and construction specifications. The following are anticipated changes to the scope of work: • Extension of time frame for completion of design and construction administration in 2012. • Additional meetings and correspondence with City representatives. • Plan modifications to reflect City standards, such as: sheet setup, plan set layout„ typical sections, standard details, bridge railing design /details, construction quantities, • Update construction plans to reflect recent tree removals in project corridor, and adjust design in specified locations regarding retaining walls to save trees. • Revise intersection layout of South Coppell Road. • Include adjustments to existing water lines. ll. Project Schedule The work will generally proceed in conjunction with the remaining schedule for the West Sandy Lake Road project, as determined jointly by the City and TNP. It is anticipated that this phase will bid for construction in early 2012. Ill. Compensation The Engineer shall be paid an additional lump sum fee for the above described Additional Scope of Services in an amount of Seventy Thousand, and no/100 Dollars ($70,000). This amount includes the foliowing increases: Additional Engineering Design $ 0,000 TOTAL $ 70,000 12160 North Abrams Road, Suite 508 Dallas. Texas 75243 214.461.9667 phone 214.461.9864 fax www. mp-onfine. caul AGREED: AGREED /ACCEPTED: THE CITY OF COPPELL TEAGUE NALL AND PERKINS, INC. By: By: Date: ,12, , Date: (n l7 Attest: _ Attest: , /--)a-it (4,-8 /ray ,e_.,ALP4rAdt • Page 2